The trap
Cost per paid hour
— CHF/h
Invoicing at this price loses money: holidays, public holidays, sickness and travel are not covered.
Calculate what a worker really costs the company and the daywork rate to invoice in order to stay profitable.
Interactive tool
1 Sector of activity
2 Qualification
Drag the slider from the collective-agreement minimum to the high profile, or enter an amount to the nearest franc.
By default: 25% in structural work, 22% in finishing trades, 24% in building services (adjustable from 15% to 35%).
The Monthly Truth Gauge
The Daywork Profitability Thermometer
The trap
Cost per paid hour
— CHF/h
Invoicing at this price loses money: holidays, public holidays, sickness and travel are not covered.
The true threshold
Actual break-even on site
— CHF/h
ACIP rate & margin
Recommended ACIP 2026 Hourly Daywork Rate
— CHF/h
Net margin = (daywork rate − break-even threshold) ÷ daywork rate. The recommended rate follows the salary between the three levels (min, average, high) of the profile, then the canton's ACIP price modifier; it is rounded to 0.05 CHF.
Employer social charges (on gross pay with 13th-month salary)
| Contribution | Rate | CHF/month |
|---|
Monthly agreed expenses (meals, travel, PPE (EPI))
Paid hours and productive hours
| Basis | Per month | Per year |
|---|
Weighted average rates from the 2026 ACIP reference applied to gross pay with the 13th-month salary spread pro rata; the breakdown of the 8 employer and employee contributions is in the social charges comparator (tool 2.2).
Paste this code into the page, or write [outil code="2.1"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
The real cost of a Swiss construction worker is always above the salary written in the contract. For a worker paid a base salary of CHF 6'000 in structural work (skilled bricklayer, class A, base charge rate of 34%), the simulator above calculates CHF 9'326 per month: CHF 6'500 gross with the 13th-month salary, CHF 2'210 of employer charges and CHF 616 of agreement-based expenses, i.e. CHF 111'912 per year. In Geneva, where employer charges reach 35.2%, the same employee costs CHF 9'404 per month.
The hourly cost price of a worker on site is therefore never deduced from the monthly salary alone: three layers of cost pile up, and that is what the simulator's gauge shows.
The 13th-month salary is part of the determining gross pay. It is spread over 12 months (+8.33%, i.e. a factor of 1.0833) and all contributions apply to this increased gross pay, not to the base salary. The employer charges including 13th-month salary are therefore calculated on "Salary × 1.0833": with a rate of 34% in structural work, the real multiplier is 1.4517 (1.0833 × 1.34); with 25% in finishing trades and building services, it is 1.3542 (1.0833 × 1.25). In other words, CHF 1 of base salary costs the employer CHF 1.45 in structural work and CHF 1.35 in finishing trades, even before meal expenses.
The 34% of structural work is explained in particular by the FAR early retirement scheme (6.00%) and by the SUVA premium of a high risk class (6.20%); the 25% of finishing trades and building services by a lighter early retirement scheme (RESOR, 1.25%) and a lower accident risk. The breakdown of the eight contributions, canton by canton, is in the comparator of employer social charges in the 26 cantons.
Each worker also generates expenses that the client does not reimburse: meal allowances (CHF 16 to 18 per day), non-billable travel and the depreciation of protective equipment (EPI) and tools. The 2026 ACIP grid sets them at CHF 616 per month in structural work, CHF 595 in finishing trades and CHF 575 in building services.
| Line item | Structural Work (CN) | Finishing Work (CCT-SOR) | Building services |
|---|---|---|---|
| Meal allowances (18,33 meals per month) | 18.33 × 17 CHF = 311.61 | 18.33 × 18 CHF = 329.94 | — |
| Non-billable travel (structural work: travel and site fund · finishing trades: 30-minute franchise) | 230.00 | 195.00 | — |
| PPE (EPI) and tools | 74.00 | 70.00 | — |
| Agreed expenses used in the ACIP 2026 grid | 616 CHF | 595 CHF | 575 CHF (lump sum) |
With a private vehicle, the reference mileage allowance is 0.70 CHF/km. For building services, the ACIP grid gives the overall amount without breaking it down.
A worker is paid for 2'112 hours a year (176 hours a month), but the company can bill only 1'620 of them in structural work and finishing trades (135 h a month) and 1'650 in building services (137.5 h a month). Measuring the paid productive hours construction 1620h vs 2112h means finding a gap of 492 hours: almost a quarter of the paid time (23%) is never billable. Calculating your rate on 176 hours a month amounts to giving these 492 hours to the client.
Holidays (5 to 6 weeks depending on the employee's situation; the ACIP grid uses 25 days), public holidays, absences due to sickness or accident (SUVA), preparation at the depot, loading, travel and bad weather reduce the billable hours. In structural work as in finishing trades:
| Line item | Hours per year |
|---|---|
| Paid hours (176 h × 12 months) | 2'112 h |
| − Annual leave (25 days) | −212 h |
| − Public holidays (9 days) | −76 h |
| − Sickness / accident absences (average) | −68 h |
| − Preparation at the depot, loading, travel and bad weather | −136 h |
| Billable hours (135 h per month) | 1'620 h |
In building services, the ACIP grid uses 1'650 billable hours a year (137.5 h a month); it does not detail the breakdown.
The calculation hourly daywork rate construction is done in three steps. First the employer's monthly cost is established, then divided by the productive hours to obtain the hourly cost price site worker, then increased by the structure's overheads (supervision, vehicles, depot): 25% in structural work, 22% in finishing trades and 24% in building services (the simulator adjusts them from 15% to 35%).
Worked example (skilled bricklayer, class A, CHF 6'000 a month, base rate): monthly cost CHF 9'326 ÷ 135 h = 69.08 CHF/h of direct site cost, i.e. 86.35 CHF/h with 25% overheads. At the ACIP daywork rate of 102 CHF/h, the net margin is +15.65 CHF/h (+15.3%). The same worker calculated on the 176 paid hours would cost only 52.99 CHF/h: this is the misleading figure of the first card of the thermometer.
The three tables take over the 45 profiles of the 2026 ACIP grid: 15 qualifications × 3 levels (agreement minimum, 2026 market average, high profile). Values at the sector's base charge rate (34% or 25%) and at the default overheads; the simulator adjusts them by canton and shows the red blue green wage zone of each canton. Amounts in CHF, rounded to the franc.
The bricklayer minimum wage CN 2026 in the grid is CHF 5'763 per month in class A and CHF 5'988 in class Q; it is CHF 5'387 for a skilled worker (class B), CHF 4'836 for a labourer (class C) and CHF 6'750 for a foreman or site supervisor (class CE). Each wage class Q A B C (and CE for supervisory staff) has its own ACIP daywork rate, from 84 to 132 CHF/h. Base charge rate: 34%; agreement-based expenses: CHF 616 per month; productive hours: 135 h per month.
| Qualification | Level | Base salary | Gross + 13th | Contributions (34 %) | Expenses / PPE (EPI) | Cost / month | Cost / productive hour | Break-even point | ACIP daywork | Net margin |
|---|---|---|---|---|---|---|---|---|---|---|
| Team leader / Foreman (Cl. CE) | Min | 6'750 | 7'313 | 2'486 | 616 | 10'415 | 77.15 | 96.44 | 115 | +18.56 · +16,1 % |
| Avg | 7'250 | 7'854 | 2'670 | 616 | 11'140 | 82.52 | 103.15 | 122 | +18.85 · +15,5 % | |
| High | 7'850 | 8'504 | 2'891 | 616 | 12'011 | 88.97 | 111.21 | 132 | +20.79 · +15,7 % | |
| Experienced mason CFC (Class Q) | Min | 5'988 | 6'487 | 2'206 | 616 | 9'309 | 68.96 | 86.19 | 102 | +15.81 · +15,5 % |
| Avg | 6'350 | 6'879 | 2'339 | 616 | 9'834 | 72.84 | 91.06 | 108 | +16.94 · +15,7 % | |
| High | 6'800 | 7'367 | 2'505 | 616 | 10'488 | 77.69 | 97.11 | 115 | +17.89 · +15,6 % | |
| Skilled mason / newly qualified CFC (Class A) | Min | 5'763 | 6'243 | 2'123 | 616 | 8'982 | 66.53 | 83.17 | 98 | +14.83 · +15,1 % |
| Avg | 6'000 | 6'500 | 2'210 | 616 | 9'326 | 69.08 | 86.35 | 102 | +15.65 · +15,3 % | |
| High | 6'350 | 6'879 | 2'339 | 616 | 9'834 | 72.84 | 91.06 | 108 | +16.94 · +15,7 % | |
| Specialised worker / AFP holder (Class B) | Min | 5'387 | 5'836 | 1'984 | 616 | 8'436 | 62.49 | 78.11 | 92 | +13.89 · +15,1 % |
| Avg | 5'650 | 6'121 | 2'081 | 616 | 8'818 | 65.32 | 81.65 | 96 | +14.35 · +14,9 % | |
| High | 5'950 | 6'446 | 2'192 | 616 | 9'254 | 68.55 | 85.69 | 101 | +15.31 · +15,2 % | |
| Labourer / site helper (Class C) | Min | 4'836 | 5'239 | 1'781 | 616 | 7'636 | 56.56 | 70.70 | 84 | +13.30 · +15,8 % |
| Avg | 5'100 | 5'525 | 1'879 | 616 | 8'020 | 59.41 | 74.26 | 88 | +13.74 · +15,6 % | |
| High | 5'400 | 5'850 | 1'989 | 616 | 8'455 | 62.63 | 78.29 | 92 | +13.71 · +14,9 % |
The CCT-SOR wage grid Romandy finishing trades covers joinery, plastering-painting, tiling and flooring: from CHF 4'620 per month for an assistant worker (class C) to CHF 6'350 for a foreman at the agreement minimum, and up to CHF 7'200 at the high profile. Base charge rate: 25%; agreement-based expenses: CHF 595 per month; productive hours: 135 h per month.
| Qualification | Level | Base salary | Gross + 13th | Contributions (25 %) | Expenses / PPE (EPI) | Cost / month | Cost / productive hour | Break-even point | ACIP daywork | Net margin |
|---|---|---|---|---|---|---|---|---|---|---|
| Finishing team leader (CCT-SOR) | Min | 6'350 | 6'879 | 1'720 | 595 | 9'194 | 68.10 | 83.09 | 100 | +16.91 · +16,9 % |
| Avg | 6'750 | 7'313 | 1'828 | 595 | 9'736 | 72.12 | 87.98 | 106 | +18.02 · +17,0 % | |
| High | 7'200 | 7'800 | 1'950 | 595 | 10'345 | 76.63 | 93.49 | 112 | +18.51 · +16,5 % | |
| Experienced journeyman CFC (Class A) | Min | 5'720 | 6'197 | 1'549 | 595 | 8'341 | 61.79 | 75.38 | 92 | +16.62 · +18,1 % |
| Avg | 6'050 | 6'554 | 1'639 | 595 | 8'788 | 65.10 | 79.42 | 96 | +16.58 · +17,3 % | |
| High | 6'450 | 6'988 | 1'747 | 595 | 9'330 | 69.11 | 84.32 | 102 | +17.68 · +17,3 % | |
| Newly qualified CFC (1st to 3rd year after CFC) | Min | 5'250 | 5'688 | 1'422 | 595 | 7'705 | 57.07 | 69.63 | 85 | +15.37 · +18,1 % |
| Avg | 5'500 | 5'958 | 1'490 | 595 | 8'043 | 59.58 | 72.68 | 88 | +15.32 · +17,4 % | |
| High | 5'750 | 6'229 | 1'557 | 595 | 8'381 | 62.08 | 75.74 | 92 | +16.26 · +17,7 % | |
| Specialised worker / AFP holder (Class B) | Min | 5'050 | 5'471 | 1'368 | 595 | 7'434 | 55.07 | 67.18 | 82 | +14.82 · +18,1 % |
| Avg | 5'300 | 5'742 | 1'435 | 595 | 7'772 | 57.57 | 70.24 | 85 | +14.76 · +17,4 % | |
| High | 5'600 | 6'067 | 1'517 | 595 | 8'179 | 60.59 | 73.91 | 90 | +16.09 · +17,9 % | |
| Finishing labourer (Class C) | Min | 4'620 | 5'005 | 1'251 | 595 | 6'851 | 50.75 | 61.91 | 76 | +14.09 · +18,5 % |
| Avg | 4'850 | 5'254 | 1'314 | 595 | 7'163 | 53.06 | 64.73 | 79 | +14.27 · +18,1 % | |
| High | 5'150 | 5'579 | 1'395 | 595 | 7'569 | 56.07 | 68.40 | 83 | +14.60 · +17,6 % |
Building services (electrical EIT.swiss, heating, plumbing and ventilation Suissetec) are calculated on 137.5 productive hours per month (1'650 h per year): from CHF 4'500 per month for an assistant fitter without a certificate (category C) to CHF 6'400 for a chief fitter at the agreement minimum. Base charge rate: 25%; agreement-based expenses: CHF 575 per month; default overheads: 24%.
| Qualification | Level | Base salary | Gross + 13th | Contributions (25 %) | Expenses / PPE (EPI) | Cost / month | Cost / productive hour | Break-even point | ACIP daywork | Net margin |
|---|---|---|---|---|---|---|---|---|---|---|
| Lead fitter electrician / CVC / sanitary | Min | 6'400 | 6'933 | 1'733 | 575 | 9'241 | 67.21 | 83.34 | 108 | +24.66 · +22,8 % |
| Avg | 6'850 | 7'421 | 1'855 | 575 | 9'851 | 71.64 | 88.84 | 115 | +26.16 · +22,7 % | |
| High | 7'400 | 8'017 | 2'004 | 575 | 10'596 | 77.06 | 95.56 | 124 | +28.44 · +22,9 % | |
| Experienced installer / fitter CFC (Cat. A) | Min | 5'650 | 6'121 | 1'530 | 575 | 8'226 | 59.83 | 74.18 | 96 | +21.82 · +22,7 % |
| Avg | 6'050 | 6'554 | 1'639 | 575 | 8'768 | 63.77 | 79.07 | 102 | +22.93 · +22,5 % | |
| High | 6'500 | 7'042 | 1'760 | 575 | 9'377 | 68.20 | 84.56 | 110 | +25.44 · +23,1 % | |
| CFC fitter (1st to 3rd year after CFC - Cat. B) | Min | 5'100 | 5'525 | 1'381 | 575 | 7'481 | 54.41 | 67.47 | 88 | +20.53 · +23,3 % |
| Avg | 5'400 | 5'850 | 1'463 | 575 | 7'888 | 57.37 | 71.14 | 92 | +20.86 · +22,7 % | |
| High | 5'750 | 6'229 | 1'557 | 575 | 8'361 | 60.81 | 75.40 | 98 | +22.60 · +23,1 % | |
| Basic fitter with AFP (Electrical / Plumbing / HVAC (CVC)) | Min | 4'800 | 5'200 | 1'300 | 575 | 7'075 | 51.45 | 63.80 | 82 | +18.20 · +22,2 % |
| Avg | 5'050 | 5'471 | 1'368 | 575 | 7'414 | 53.92 | 66.86 | 86 | +19.14 · +22,3 % | |
| High | 5'350 | 5'796 | 1'449 | 575 | 7'820 | 56.87 | 70.52 | 90 | +19.48 · +21,6 % | |
| Fitter's mate without certificate (Cat. C) | Min | 4'500 | 4'875 | 1'219 | 575 | 6'669 | 48.50 | 60.14 | 76 | +15.86 · +20,9 % |
| Avg | 4'750 | 5'146 | 1'286 | 575 | 7'007 | 50.96 | 63.19 | 80 | +16.81 · +21,0 % | |
| High | 5'050 | 5'471 | 1'368 | 575 | 7'414 | 53.92 | 66.86 | 85 | +18.14 · +21,3 % |
Source: 2026 ACIP reference (Art Construction Price Index). Daywork rates at the ACIP base price level (Vaud); each canton's price modifier is in the 26-canton comparator. Indicative values: they replace neither the text of the applicable collective agreement nor the advice of your fund or your fiduciary.
You must invoice at least the real break-even threshold: the hourly cost price of a worker divided by his productive hours (1'620 h a year, i.e. 135 h a month, and not the 2'112 h paid), then increased by overheads of 22% to 25% depending on the sector. In the 2026 ACIP grid, the recommended daywork rates range from 84 to 132 CHF/h in structural work, from 76 to 112 CHF/h in finishing trades (CCT-SOR) and from 76 to 124 CHF/h for building services.
Example: an experienced CFC journeyman (class A, finishing trades) paid CHF 6'050 a month has a break-even threshold of 79.42 CHF/h for a recommended ACIP rate of 96 CHF/h, i.e. +16.58 CHF/h of net profit (+17.3% margin). These rates correspond to the ACIP base price level (Vaud); the simulator adjusts them according to the chosen canton.
The answer depends on the applicable collective agreement (CN in structural work, CCT-SOR in finishing trades) and on the site situation: these agreements set the amount of the allowance and the conditions under which it is due. For the cost price, the 2026 ACIP grid provisions 18.33 meals per month, at CHF 17 in structural work (311.61 CHF/month) and at CHF 18 in finishing trades (329.94 CHF/month), within a range of CHF 16 to 18 per day. If your situation does not trigger the allowance, adjust the amount; if in doubt, refer to the text of the agreement that applies to your company.
In the 2026 ACIP grid for finishing trades (CCT-SOR), a 30-minute franchise applies to travel between the depot and the site: it is built into the agreement-based expenses at CHF 195 per month. In structural work, travel and the site fund amount to CHF 230 per month. With a private vehicle, the mileage allowance used is 0.70 CHF/km.
This preparation, loading and travel time is not billed to the client: it is part of the 136 hours a year that separate the 2'112 paid hours from the 1'620 billable hours, and explains why the daywork rate must be calculated on productive hours.
The National Agreement classifies cantons and regions by wage zone. In the 2026 ACIP reference, the Red Zone is the highest level (for example Geneva): Geneva, Neuchâtel, Jura, Zurich, Zug, Basel-Stadt. The Blue Zone covers: Valais, Fribourg, Basel-Landschaft, Aargau, Solothurn, Lucerne, Schwyz, Nidwalden, St. Gallen, Thurgau, Schaffhausen. The Green Zone groups: Obwalden, Uri, Appenzell Ausserrhoden, Appenzell Innerrhoden, Glarus, Ticino.
Some cantons are mixed: Vaud (Blue (Lausanne: Red)); Bern (Blue (City/JB: Red)); Graubünden (Blue / Green). The simulator shows the zone of the selected canton, with its employer charge rate and its ACIP price modifier; the grid's reference salaries remain those of the 2026 ACIP reference.