Practical guide

Mastering and Allocating Fixed Overheads Across Productive Crews

Swiss method to allocate fixed overheads across productive construction crews. Protect your hourly margin and safeguard your cash flow.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Underestimating the share of fixed operating expenses directly crushes operating profit, often by more than 12,00 % of gross margin, causing an outright loss of tens of thousands of francs under the financial balance principles of the Code of Obligations.
  2. Legal / Joint Committees / SUVA: Arbitrarily spreading overhead costs across productive labour obscures discrepancies in working-time logs, leaving the company exposed to strict inspections of maximum working hours under art. 9 LTr and to transparency requirements from joint committees.
  3. Administrative / Handover: Allocating incorrect indirect costs distorts the true cost of ongoing construction sites, jeopardising final agreed accounts and triggering intractable disputes when rendering accounts for daywork under a works contract.

This operational guide is aimed at Swiss SME construction business owners employing between 5 and 50 staff, site managers and financial controllers looking closely at the profitability of their site units. In an industry facing irreducible operating costs including office premises, commercial vehicle fleets and IT infrastructure, applying an arbitrary flat-rate percentage often distorts pricing. For detailed descriptive quotes and ACIP unit prices, detailed costing is handled in the dedicated tenders module.

Sound management accounting requires isolating fixed overheads so they can be allocated rigorously across the genuinely productive hours of installation or masonry crews. By tying this allocation to validation cycles run with your fiduciary, senior management ensures that each scheduled workday makes its fair contribution to ongoing expenses. This approach provides ongoing financial clarity, without encroaching on matters of collective agreement wage scales handled specifically on the jobs portal.

Analytical allocation method for fixed operating expenses

Within an artisan firm or a Swiss general contractor handling structural work or finishing work, fixed overhead allocation cannot rely on a simple across-the-board markup. Such a practice penalises equipment-heavy trades while underestimating the real cost of lightweight crews. To prevent any overlap with calculating detailed unit prices or quantity take-offs, which are strictly the preserve of the Soumissions platform, business management here focuses on internal cost-accounting structure. The perimeter of fixed overheads covers yard and warehouse rent, fiduciary fees, public liability insurance, fleet depreciation, management software licenses, and executive and technical office salaries.

To build a fair allocation key across productive crews, the approach advocated under the BOSS method centres on three measurable factors:

  • The logistical and plant footprint: the volume of heavy tooling, plant and warehouse space taken up by each trade within the main depot.
  • The volume of productive hours billed: the total hours actually invoiced to clients on construction sites, deducting non-billable workshop hours, travel time and bad-weather downtime.
  • The dedicated administrative and technical workload: the time spent by the technical office on project prep, materials purchasing and logistical coordination for each type of site work.

Rigorous logging of effective working hours, in compliance with Ordinance 1 to the Labour Act, is the vital foundation for determining the true productive capacity of each crew without distorting the distribution key for pooled expenses.

Comparison table of overhead allocation models

The chosen allocation method directly determines how operational profitability is read across each site crew. The following table reviews common approaches found across Swiss Romand SMEs:

Allocation methodInternal calculation principleMain management benefitMajor operational riskAnalytical accuracy level
Global flat-rate percentageSingle uniform percentage applied across total invoiced turnover.Immediate administrative setup and straightforward calculation for general ledger accounting.Hides loss-making cost centres and inappropriately dumps fixed costs onto the most active crews.Very low
Pro rata of productive hoursTotal fixed costs divided by the total number of actual hours logged on the construction site.Direct reflection of field activity levels and builds accountability around productive presence.Unfairly penalises manual trades that require very little plant, tools or depot storage space.Medium
Cost centres by tradeDedicated cost centres separating administrative expenses, depot costs and fleet vehicles.Accurate measurement of the intrinsic profitability of each technical trade in the firm.Demanding fiduciary tracking requiring rigorous coding of purchase invoices and receipts.High
Rate per vehicle or plant itemOverheads assigned directly to site equipment and to the allocated van.Pinpoints extra costs stemming from heavy mechanisation in certain crews.Difficult to handle when vehicles are frequently rotated between multiple crews.Good
Operational unit methodWeighted allocation combining crew headcount, onboard tool volume and technical support.Well-balanced overview spanning equipment use and administrative management overhead.Requires an annual recalibration during year-end financial closing with the fiduciary.Optimal

For accurate calculations of applicable collective agreement minimum wages or social security contributions across staff categories, consult the contract rate tables on the Jobs portal.

Common allocation errors and impact on operating results

The most widespread mistake is bundling depreciation on commercial vehicles and heavy plant into a single company overhead account rather than assigning it straight to the user departments. When a masonry crew uses three heavy utility vehicles and substantial depot space while an electrical crew needs only one light van, splitting fleet costs equally warps the entire analysis. The light crew appears artificially loss-making, while the heavy crew shows an artificially high operating margin.

A second common trap is ignoring seasonal under-activity. Operating budgets calculated on a full-year, full-employment basis without factoring in winter drops in hours lead to under-absorption of fixed costs. As a purely indicative benchmark for a 10-worker firm, an undersized allocation of fixed overheads frequently creates an end-of-year shortfall of around 35 000,00 CHF to 65 000,00 CHF. This imbalance drains cash reserves even though business volume stayed constant. For contract pricing and tender schedules, contractors should rely on the Soumissions module.

Finally, overlooking the safety coordination mandated by the Construction Work Ordinance leads to unanticipated administrative costs. Hours spent by management on unplanned safety coordination meetings must be accounted for within project management costs, not watered down anonymously into general overheads.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following scenarios are realistic examples built for educational purposes to demonstrate how to apply these cost-accounting allocation models in practice.

Scenario 1: Plastering and painting contractor in the canton of Vaud

A Vaud-based SME of 14 people runs two 4-worker painting crews and two 3-worker dry-lining and plastering crews. The company incurs annual fixed overheads totalling 280 000,00 CHF (rent for the yard in Renens, salaries for the business owner and a part-time bookkeeper, corporate insurance and software). Originally, management applied an identical percentage on labour across the board. A detailed review revealed that the plastering trade occupied 70 % of the depot floor area for drywall profiles and boards, while generating two thirds of all waste-handling logistics.

By shifting to a weighted operational-unit allocation, management reassigned 175 000,00 CHF of fixed overheads to the plastering crews and 105 000,00 CHF to the painting crews. This adjustment revealed that plastering operations were understated in their internal cost price, prompting management to refine site selection without distorting competitive market rates.

Scenario 2: Carpentry and roofing SME in Valais

A firm based in central Valais employs 8 workers split into one timber framing crew and one Sheet-metal Work and roofing crew. Harsh winter weather forces an almost complete halt to outdoor assembly for five weeks. Allocating fixed overheads using an unadjusted theoretical volume of annual hours generated a recurring cash deficit during the first quarter.

The business rebuilt its operational plan by matching fixed overhead absorption solely against guaranteed productive hours (that is, 10 full months of outdoor work). This realignment ensured fixed structural costs were absorbed across periods of actual site activity. Work acceptance under standard SIA 118 and handling snagging lists continue to run through the protocols of the Portail module. This management rigor ensures each productive crew recovers all of its actual fixed costs during active work time, protecting the firm's bottom line.

Frequently asked questions

How should the workshop manager or storekeeper salary be allocated?

This cost belongs under operating overheads, as it supports several teams. An SME includes it in the annual fixed budget of around 45 000 CHF for this role, rather than billing it directly to a client on a single daywork sheet.

Should operational vehicles be included in fixed overheads?

Yes for insurance and base leasing, which represent fixed structural overheads. Conversely, fuel and mileage wear-and-tear tied to a specific project are shifted to direct job costs under Swiss accounting standards.

How often should the overhead rate be recalculated?

A half-yearly review with your fiduciary guarantees genuine cost recovery. If productive gross wages fluctuate by more than 15 %, the structural hourly rate must be recalculated to prevent an under-absorption deficit at year-end.

How should non-productive continuing education hours for installers be handled?

Hours spent attending mandatory training are recorded as indirect operating expenses. The firm funds this time through its overhead multiplier, supplemented by any joint-committee allowances paid out by the trade training fund.

How should yard rent be broken down between several trades?

Occupied floor space is the standard allocation key. A sheet-metal workshop taking up 60 % of the floor space absorbs that share of the commercial lease, with the remainder assigned to masonry or joinery storage.

Does technical management software count as an overhead?

Software subscriptions and operational licenses are fixed administrative expenses. An illustrative annual allocation of 12 500 CHF for twenty users is split evenly across each active operating unit to amortise company digital infrastructure.

Overview of overhead cost control

The financial sustainability of a craft business relies on rigorously allocating administrative and logistics overheads to every productive hour. To look further into detailed tender costing, check out our module dedicated to tenders. Contract management issues and acceptance of the work are covered on the construction site portal, while recruitment and CLA wage rates fall under the careers division. The geometric design of structures belongs to the plans section.