Skip to content
Website
Sign in Sign up
Guide

MSST System and Organisation for Demolition Firms (CFC 112) in the Canton of Fribourg

MSST setup under CFST 6508 for CFC 112 demolition firms in Fribourg. Bilingual procedures, SUVA safety standards and structural risk management.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Unexpected discovery of pollutants without prior survey halting a demolition excavator, creating downtime costs of around 15 000 CHF to 45 000 CHF that cannot be passed on without an addendum under standard SIA 118.
  2. Legal / Joint / SUVA: Work stoppage ordered by inspectors during material sorting if art. 82 LAA is breached or if dust and collapse prevention measures are missing.
  3. Administrative / Handover: Tracking sheets for mineral waste rejected by Fribourg cantonal departments, suspending the release of financial guarantees for site remediation.

In the canton of Fribourg, running a demolition firm under CFC 112 requires an MSST organisation tailored to local topographical and linguistic conditions. Between urban construction sites on the Sarine plateau and civil engineering structures in the Fribourg Pre-Alps—particularly in Gruyère, where winter frost weakens the stability of buildings to be deconstructed—controlling falls from height, collapses and heavy plant movements requires rigorous operational standards right from logistical planning.

Cantonal bilingualism requires issuing safety sheets and deconstruction protocols simultaneously in French and German to ensure complete understanding among machine operators and site workers. Complying with directive CFST 6508 secures pre-works surveys for asbestos-containing materials and structures operational responsibilities without undermining the overall profitability of Fribourg projects.

Free software, runs directly in your browser

Studio MSST: safety procedures and QR code notices

Build your MSST procedures, print workstation safety sheets and their QR codes. Everything runs locally in your browser, with no data transmitted.

Open software

Integrating CFC 112 hazards into the Fribourg MSST system

Demolition work (CFC 112) exposes teams to three critical risks: falls from height during work on slabs or roofs, unexpected collapses of load-bearing components and dense shared activities around heavy machinery. Exposure to mineral dust and the presence of asbestos-bearing materials demand rigorous detection before sending in deconstruction plant. Internal organisation under directive CFST 6508 requires including these hazards in every construction site file, formalising task allocations and emergency fallback protocols.

In the canton of Fribourg, this organisation accounts for two major operational realities. First, cantonal bilingualism requires issuing safety instructions, task briefing sheets and emergency stop instructions simultaneously in French and German to ensure full comprehension across the Sarine basin or in the Sense district. Second, the severe climate of the Fribourg Pre-Alps, particularly in Gruyère, requires phasing adjustments: frost and snow alter the strength of deteriorated superstructures and hinder the movement of heavy remediation excavators on unstable ground.

Priority on-site procedures and work stoppage criteria

Pursuant to art. 5 OTConst, the employer appoints a competent person on each construction site responsible for occupational safety and health protection, who is authorised to issue directives to workers. The table below outlines the six essential operational situations needed to supervise demolition work in the field in Fribourg:

Work situation Identified hazard Required preventive measure STOP point (work stoppage)
Removal of floorboards and slabs Falls from height and collapse Installation of temporary decking and lifelines Missing edge protection or abnormal deflection
Topping down load-bearing walls Uncontrolled masonry collapse Prior shoring and sequential dismantling Unexpected cracking or instability of load-bearing wall
Interior strip-out before demolition Dust and suspected asbestos-containing materials Checking pollutant survey and water misting Discovery of unlisted suspect materials
Operating excavators with sorting grabs Pedestrians struck by heavy machinery Strict exclusion zone cordoning and high-vis vests Unauthorised worker inside the operating radius
Loading rubble into skips Flying debris and unstable loads Tarpaulins, dust suppression spraying and safe waiting zone Unstable spill-over or clear skip overloading
Winter construction site in Gruyère Plant skidding and frozen structural elements Salting haul roads and checking traction Severe frost hiding structural cracks on slabs

Standard weekly schedule for the site supervisor

Managing a demolition SME relies on a methodical weekly cycle:

  • Monday morning (bilingual briefing): The site manager leads the safety toolbox talk in French and German, reviewing the STOP points for the week and plant movement areas.
  • Wednesday (Operational inspection): The designated competent person checks that waste stream segregations comply, that dust-suppression sprays work properly and that shoring remains sound.
  • Friday afternoon (Sign-off and prep): Recording volumes hauled away, securing the perimeter of excavated areas for the weekend and completing administrative checks for material recycling pathways.

Illustrative practical cases (typical scenarios on Swiss construction sites)

Figures shown in the scenarios below are illustrative examples intended to model decision-making in a demolition SME.

Typical scenario: Deconstruction of a mixed steel-and-concrete warehouse on the heights of Bulle. The job involves a team of six bilingual workers and two hydraulic excavators fitted with shears and a rock breaker. During preliminary strip-out, thermal insulation not documented in the initial diagnostic survey is uncovered. Under the STOP protocol, the competent person orders a localised halt to strip-out work. The cantonal labour inspectorate and site management are notified so a specialist laboratory can be appointed. The crew redirects the machines to top down the sound administrative annex, reducing the financial impact of heavy plant downtime, which typically amounts to an internal cost of roughly 1 850,00 CHF to 3 200,00 CHF per unplanned idle day.

Frequently asked questions

How do you formalise MSST organisation on a bilingual CFC 112 site in Fribourg?

The site management approves the safety plan drawn up in accordance with the construction works ordinance. Dismantling instructions and emergency action sheets are translated into French and German.

What budget should be planned to train a Fribourg crew in demolition risks?

Allow an illustrative amount of about 1 850,00 CHF to certify foremen under directive CFST 6508. Pay scales and employment contracts are managed on jobs.

How should unexpected asbestos discoveries be handled during strip-out in Gruyère?

Under the construction works ordinance, workers stop work immediately. The employer notifies the client to bring in a SUVA-recognised firm. Quantity take-offs are priced on soumissions.

What measures apply during winter frost on Fribourg pre-Alpine construction sites?

The employer adapts workstations according to the construction works ordinance. It secures icy access routes around excavators and scales unstable rock slopes to prevent rockfall hazards.

Who validates safety compliance before handover of the dismantled structure?

The competent person appointed by the contractor inspects rubble clearing. The joint inspection report and any client reservations under standard SIA 118 are handled on portail.

Mastering collapse risks and running bilingual operations safeguard profitability for a Fribourg demolition firm. To prepare your site layout plans under standard SIA 400, explore our dedicated tool. Keep streamlining your construction sites with our regional and technical guides:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.