Table of contents
The 3 Major Site Risks
- Financial / Margin: Unforeseen discovery of pollutants and unplanned shutdown causing additional costs in the range of 15 000 CHF to 45 000 CHF for an SME under the Construction Works Ordinance.
- Legal / Joint Body / SUVA: Serious failure during the dismantling of load-bearing elements exposing management to prosecution under art. 229 CP in the event of personal injury, as well as shutdown of operations by SUVA under the Federal Act on Accident Insurance.
- Administrative / Acceptance: Blocking of skip removal and rejection of tracking sheets by competent Bernese authorities in the absence of a plan compliant with the CFST 6508 directive.
In the canton of Bern, managing a demolition contractor under CFC 112 requires a rigorous organisation of the MSST system. Between the specific features of the French-speaking Bernese Jura, the bilingual agglomeration of Biel/Bienne, and alpine construction sites in the Oberland exposed to harsh winter conditions, operational management requires safety sheets and demolition instructions to be drafted in both French and German for each field crew.
The inherent risks of deconstruction works, such as falls from height, sudden collapses, and emissions of hazardous dust, require the appointment of a competent person on every Bernese site. Prior detection of asbestos-containing materials and securing heavy plant are prerequisites for continuous site operations, safeguarding the contractor's margin during joint inspections by SUVA and the Bernese cantonal authorities.
Free software, runs directly in your browser
Studio MSST: safety procedures and QR code notices
Build your MSST procedures, print workstation safety sheets and their QR codes. Everything runs locally in your browser, with no data transmitted.
Integration of CFC 112 hazards into the Bernese MSST system
Demolition work (CFC 112) involves critical risks governed by the CFST 6508 directive: falls from height, sudden collapse of load-bearing components, massive dust emissions, presence of asbestos-containing materials, and heavy plant operations. For a Bernese SME with 5 to 50 employees, controlling these risks requires rigorous internal organisation, separate from the unit price calculation carried out in bills of quantities and tenders.
The canton of Bern imposes specific operational requirements. On the one hand, regional bilingualism requires that safety notices, job safety cards, and emergency instructions are systematically drafted and displayed in both French and German, covering projects in the Bernese Jura and the Biel/Bienne agglomeration as well as in the Mittelland. On the other hand, demolition sites in the Bernese Oberland face pronounced seasonality: winter frost, snow loads on weakened roofs, and restricted access in alpine areas affect the stability of structures to be demolished. The competent cantonal authority and the cantonal labour inspectorate review this bilingual documentation during unannounced inspections.
Table of priority field procedures for demolition
| Work situation | Identified hazard | MSST operational measure | Hold point (STOP criterion) |
|---|---|---|---|
| Demolition of load-bearing walls | Sudden failure and collapse | Top-down dismantling sequence with certified temporary shoring | Abnormal cracking or structural element non-compliant with plans |
| Removal of false ceilings and roofs | Falls from height through openings | Installation of safety nets beneath floor slabs and rigid guardrails | Lack of continuous collective perimeter edge protection |
| Removal of suspect components installed before 1991 | Inhalation of asbestos fibres | Review of prior hazardous materials diagnostic report and zone containment | Presence of friable material not identified in the initial report |
| Operations of 25 to 40-tonne excavators | Collision with ground personnel | Pedestrian-plant segregation through barriers and mandatory high-visibility clothing | Slewing radius of plant not cordoned off |
| On-site crushing and sorting of rubble | Inhalation of mineral dust | Continuous water misting at impact point and pressurised plant cab | Failure of water supply or interruption of water spraying |
| Breaking through slabs with hydraulic hammer | Debris falling onto lower floors | Physical barring of lower access points and fixed signage | Presence of a worker or third party in the area below |
Typical weekly organisation of a demolition SME
Accident prevention relies on a standardised weekly schedule:
- Monday (Preparation): Bilingual review of phasing plans by the site manager, checking of municipal highway permits, and verification that the asbestos diagnostic report matches the week's work zones.
- Tuesday to Thursday (Instruction and site management): Ten-minute morning safety briefing led by the foreman at the site notice board (French and German versions according to the crew's composition), progress review on skip removal routes, and verification of personal protective equipment.
- Friday (Inspection and close-out): Inspection of clearance zones, inventory of heavy tools, checking the weatherproofing of opening closures against alpine weather for the weekend, and submission of timesheets for internal approval, without addressing collective labour agreement pay scales here.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The following figures and situations are illustrative examples designed to model internal operational management.
Typical scenario: Deconstruction of a mixed commercial warehouse in Biel/Bienne
A Bernese SME with ten employees is carrying out works on a 1970s light-industrial complex comprising a joinery workshop and a structural steel hall. The deployed team includes six operatives managed by a bilingual site foreman. Initial planning identified facade panels suspected of containing asbestos, as well as a risk of steel trusses buckling if not cut in a strict sequence.
The chosen approach involved dividing the building into two separate, sealed work zones. In zone 1, a specialist contractor removed hazardous elements under containment. In zone 2, the earthmoving and demolition crew operated a tracked excavator fitted with concrete shears, backed by continuous water spraying to suppress dust. All traffic and skip access instructions were posted in French and German near the site cabin. This zoning prevented any work stop ordered by the cantonal inspectorate and protected the forecast margin without triggering contractual disputes with the site management.
Frequently asked questions
How to implement bilingual French-German demolition instructions in Biel/Bienne?
The CFST 6508 directive requires easily understandable communication. Provide bilingual notices on your excavators, with an estimated administrative cost of 420.00 CHF per demolition technical binder.
Who validates the absence of pollutants before demolishing a building in the Bernese Jura?
The employer reviews preliminary diagnostic reports under the Construction Works Ordinance. Heavy asbestos removal remains reserved for specialist firms certified by CNA before any mechanical demolition starts.
What winter safety measures apply when demolishing a chalet in the Bernese Oberland?
The Construction Works Ordinance prescribes tailored cold-weather protections. Allow roughly 1'250.00 CHF in preventative measures to clear snow-covered access tracks and secure foundations destabilised by frost.
Where should daily maintenance checks on sorting and crushing plant be logged?
Record all daily checks in an accessible logbook or digital system. The Ordinance on the Prevention of Accidents and Occupational Diseases governs heavy plant maintenance to prevent dangerous breakdowns on construction sites.
How should unexpected asbestos spray-coating be managed during interior strip-out?
The Construction Works Ordinance requires an immediate work stop and notification of the site management. For quantity takeoff revisions or sorting unit price updates, visit /soumissions/.
Effective management of a Bernese demolition firm relies on mitigating structural collapse risks and ensuring the linguistic compliance of safety instructions. To learn more about protocols applicable to regional construction sites:
- MSST System Under CFST Directive 6508: Standardising Procedures and Quality for a Building Contractor
- Studio MSST and QR procedure sheets for CFC 112
- MSST System and Organization of a Demolition Firm (CFC 112) in the Canton of Vaud
- MSST System and Organisation of a Demolition Company (CFC 112) in the Canton of Geneva
- MSST System and Organisation of an Earthworks and Excavation Company (CFC 201) in the Canton of Bern