The 3 Major Site Risks
- Financial / Margin: Direct and indirect costs of a serious accident involving an apprentice can exceed the range of 45 000 CHF to 90 000 CHF (team productivity loss, technical investigation time, and premium increases under the Federal Accident Insurance Act).
- Legal / Joint Body / SUVA: Work stoppage ordered by a SUVA inspection or the cantonal labour protection authority if a minor is assigned to prohibited tasks without supervision by a competent person pursuant to art. 5 OTConst.
- Administrative / Handover: Immediate revocation of the SME's cantonal training permit by the vocational training office, coupled with the withholding of the apprenticeship completion certificate endorsement.
This operational document structures the preliminary check and traceability of high-risk operations carried out by apprentices under 18 years of age in construction. Designed for business owners, site managers, and training supervisors, it is deployed as soon as the young worker arrives on the construction site and at every change of workstation to satisfy the general prevention rules set out in art. 82 LAA and directive CFST 6508.
By documenting suitability prerequisites, instruction at critical workstations, and the formal appointment of a qualified supervisor, this sheet eliminates improvisation in the workshop or trench. It locks in company compliance during joint committee audits and shields management from supervision challenges during SUVA inspections.
Document download — PDF (8 KB)
Dangerous work checklist — apprentices under 18 years of age
Receive this document by email
Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.
Operational structure and deployment of the supervision form
The document comes as a standardised two-page PDF form, designed for direct use on a site tablet or as a laminated printout in the site hut. It legally binds the company trainer, the site manager, and the foreperson assigned to the workstation. It must be filled out before any initial assignment to a task carrying specific risks, followed by weekly sign-offs during crew rotations.
The template is organised around two mandatory sections defined by occupational health and safety standards:
- Prerequisites: identification of the apprentice, exact civil age, certificate of completion for inter-company basic course modules, validation of medical fitness where applicable, actual issuance of personal protective equipment tailored to body size, and formal appointment of a professional mentor holding a Federal VET Diploma (CFC) in the trade.
- Log of assigned dangerous work: chronological register of sensitive operations authorised by educational exemption, authorised mechanical or power tools, date of workstation instruction, level of autonomy granted under direct supervision, and daily sign-off by the designated supervisor.
Detailed section-by-section guide
In the prerequisites section, the administrative officer or safety officer enters the apprentice's civil status details, current apprenticeship year, and trade being learned. They record the exact completion date of inter-company courses relevant to the machinery involved. No task presenting specific risks may be entered in the log if this training validation box remains blank. The document also requires the in-company trainer's signature certifying they have taken note of the limits set out in the vocational training ordinance for the trade in question.
In the log of assigned dangerous work, the foreperson records every critical task assignment: exact nature of the work, machine or installation used, collective protective measures in place, and specific safety instructions delivered. They define the level of supervision: step-by-step guidance or continuous visual supervision within earshot. As soon as the task ends or the work environment changes, the entry is closed with the joint signatures of the apprentice and the qualified tradesperson providing on-site supervision.
Comparison table of traceability practices
| Risky wording / frequent mistake | Compliant formulation or practice | Why |
|---|---|---|
| The apprentice uses the table saw under general workshop supervision. | Table circular saw use authorised only under the continuous visual supervision of a qualified mentor. | General supervision provides no guarantee of immediate corrective intervention if a safety guard is mishandled. |
| Apprentice trained on working at height by the site manager upon arrival. | Fall protection training validated in inter-company courses on 14 October, safety harness check logged. | A simple verbal instruction not certified by the training centre provides no proof of established technical competence. |
| Manual demolition work assigned without specifying the exact work area. | Manual chiselling of non-load-bearing elements at standing height, underpinning work strictly excluded. | Failing to demarcate the perimeter exposes the young worker to collapse hazards beyond their apprenticeship training level. |
| Single sign-off of the register at month-end by the site manager. | Daily sign-off at shift start by the foreperson physically present in the work area. | Retroactive sign-offs conceal periods when the designated mentor may have been absent from the construction site. |
| Blanket authorisation granted for angle grinder use. | One-off authorisation limited to cutting reinforcing bars with the guard closed and sealed goggles worn. | A blanket authorisation prevents adapting the risk assessment to changing construction site conditions. |
| Designating an unskilled labourer to guide the apprentice on an aerial work platform. | Designating exclusively a mentor holding a Federal VET Diploma (CFC) who has completed specific training. | The supervisor must master trade best practice to correct incorrect posture or working methods on the spot. |
Critical errors locked down and financial impacts
Using this template prevents assigning a young worker without verifiable instruction. Financially, a partial construction site shutdown ordered by an inspector upon finding an apprentice operating dangerous machinery alone results in fixed downtime costs of around 4 200,00 CHF to 7 800,00 CHF per day for an SME. In the event of personal injury to an unsupervised minor, the additional costs for expert investigations, replacement labour, and accident insurance premium hikes frequently reach sums in the region of 25 000,00 CHF to 60 000,00 CHF. Keeping an accurate log eliminates the risk of insurance cover being voided for gross negligence in apprentice supervision.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and scenarios detailed below are instructional examples developed to illustrate practical implementation on site.
In the canton of Vaud, a timber construction general contractor with 18 employees is working on adding an extra storey to a multi-family building. A 17-year-old carpentry apprentice in their second year of initial vocational training is scheduled to help install prefabricated roof elements. The foreperson opens the tracking sheet on Monday morning: under prerequisites, they verify that the apprentice passed the fall arrest personal protective equipment module during their inter-company course session. In the assigned work log, they limit the work to receiving crane-guided timber cassettes under the direct supervision of the site supervisor holding a Federal Diploma of Higher Education, strictly prohibiting any movement near unguarded slab edges. Archiving this signed sheet proves that the workstation was properly set up in full compliance with safety directives.
In the canton of Valais, a plumbing and sanitary installation firm with 12 employees is preparing connections for a communal heating plant. A 16-year-old in their first apprenticeship year needs to use a diamond core drill to bore through a reinforced concrete wall. The owner blocks the immediate assignment because the prerequisites section shows that technical instruction on this heavy tool has not yet been delivered at the vocational school. The task is reassigned to a qualified sanitary installer, preventing a minor worker from being exposed to uncontrolled torsional kickback that could cause a severe wrist fracture.
Frequently asked questions
Can an apprentice who is a minor use a power cut-off saw on the construction site?
No, unless an explicit exemption is granted under the initial vocational training ordinance. The employer must comply with the Ordinance on the Prevention of Accidents and Occupational Diseases, ensuring instruction is verified by the trainer before any supervised use.
Who provides direct supervision during a critical task assigned to an apprentice?
The qualified tradesperson designated by the training company. Under the Construction Work Ordinance, site organisation requires continuous supervision to prevent personal injury or activity stoppages by joint committee inspectors.
What does a shutdown caused by an unauthorised minor cost when issued by SUVA?
A workstation stoppage costs around 450.00 CHF to 1 200.00 CHF per half-day of unproductive downtime. Employers adhere to the Federal Accident Insurance Act to avoid administrative freezes or insurance recovery claims.
How should an apprentice's fitness be recorded prior to working at height?
The PDF tracking form records the supervisor's sign-off and the instruction date. The Vocational Training Ordinance requires verification of practical skills, entered into the apprenticeship file for any cantonal inspection.
Where are standard wage agreements and apprentice pay scales handled?
The minimum wages scales are governed by collective labour agreements (CLA) and can be viewed in the dedicated jobs section, while tender pricing is analysed separately from this operational supervision form.
Take action to secure supervision of your apprentices
Integrating young recruits demands rigorous traceability to satisfy accident insurance and cantonal authority requirements. Systematically completing this log protects the physical well-being of your staff, curtails financial exposure from shutdowns, and guarantees the daily compliance of your operational supervision.
To roll out these standards and formalise your supervisors' responsibilities on your construction sites, take advantage of our complementary resources: