Template and resource

Downloadable Template: SME Director Job Description (PDF)

Download the time log and job description template for Swiss construction SME directors. LTr legal framework and opportunity cost analysis.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Indirect cost drift caused by the manager performing non-billable manual execution tasks, generating an operating margin erosion in the range of 45 000,00 CHF to 95 000,00 CHF per year under the contract for work provisions of the Code of Obligations (CO).
  2. Legal / Joint Body / SUVA: Non-compliance with governance and supervisory requirements set out by the Labour Act and the Accident Prevention Ordinance (OPA), leaving the business without clearly defined management responsibilities on the construction site.
  3. Administrative / Handover: Shortcomings in steering contractual claims and lack of anticipation regarding joint inspection procedures set out by standard SIA 118, leading to formal disputes when closing project accounts.

This operational PDF template establishes the functional framework for managing a French-speaking Swiss construction SME employing 5 to 50 staff. Designed for managing directors, board members, and technical executives, this tool formalises the balance between strategic leadership and operational site delivery. Deploying it during a management restructuring or governance transition prevents the owner from getting bogged down in routine interventions at the expense of overall oversight. Tender pricing aspects fall under the Soumissions section, while collective agreement wage grids are addressed in the recruitment section.

Implementing this structured ten-working-day log enables you to quantify hours spent on unplanned troubleshooting on site against the statutory ceilings set out in art. 9 LTr. The tool structures the progressive handover of duties to site managers and foremen, ensuring the traceability of management decisions to meet fiduciary and accounting requirements. By establishing clear commercial and financial arbitration duties, the document safeguards overall firm profitability against structural productivity losses.

Downloadable document — PDF (9 ko)

Owner's time log and opportunity cost

Receive the document

Receive this document by email

Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.

Operational structure and document rollout

The document is provided as a three-part dynamic PDF template, designed for direct use by the business owner, board director, or operations manager. It is introduced during an internal governance review, during annual account closing with the fiduciary, or during a management reorganisation aimed at building team autonomy. The handover procedure involves a rigorous process structured around three standardised sections.

1. 10-day log (hours)

This first section captures a chronological log of the director's time over two consecutive working weeks. The user logs actual daily hours broken down into four categories: strategic management (governance, 13-week cash-flow management, job selection), administrative and fiduciary management, works supervision (purchasing, scheduling), and unplanned manual interventions on construction sites. Each time block is assigned an operational code. Logging these entries measures precisely the share of hours absorbed by site emergencies at the expense of general business management.

2. Calculating opportunity cost

The second section calculates the economic cost of time absorbed by production tasks. The user enters their gross annual salary or director's remuneration, plus standard social security contributions (AVS, AI, APG, accident insurance under LAA, occupational pension under LPP). The document applies the director's benchmark hourly rate against the market value of the performed tasks. If the manager spends 15 hours per week hauling materials or filling staffing gaps on site, these hours are priced at the cost spread between executive management and qualified site execution. The calculation reveals the net loss of added value suffered by the craft firm.

3. Task delegation plan

The third section sets out a structured delegation pathway toward site managers, foremen, or administrative staff. For each task logged in the journal, the document defines the designated employee, the required skillset, the handover deadline, and the corresponding monitoring mechanism. This matrix incorporates occupational health and safety requirements under CFST directive 6508 and art. 5 OTConst, which requires the employer to appoint a competent person on each construction site authorised to issue instructions to workers. This transfer formalises operational duties without creating gaps in authority.

Management trade-offs and compliant practices

Putting these roles down in writing eliminates the role creep common in French-speaking Swiss construction firms. The following table contrasts observed pitfalls with formulations aligned with sound corporate governance.

Risky wording / frequent mistakeCompliant formulation or practiceWhy
The managing director steps in personally to unload lorries or install components when delays occur.Logistics delegated to the foreman through a standardised procurement procedure.Manual intervention conceals organizational shortcomings and misallocates an inappropriate hourly cost rate.
Verbal, daily sign-off by the owner for every consumable purchase.Written financial approval threshold delegated to the site manager up to a defined ceiling.Excessive micromanagement overwhelms the director and slows down the technical progress of site teams.
The managing director acts as the sole safety officer without designated on-site deputies.Written appointment of a competent person on the construction site pursuant to art. 5 OTConst.The employer must guarantee effective, continuous oversight through a designated person present on site.
Client complaints handled reactively on site by the business owner on a case-by-case basis.Application of a standardised protocol routing enquiries through site management.Ad-hoc troubleshooting disrupts schedules and undermines the traceability of change orders.
Total absence of time tracking for management hours spent on strategic decisions.Systematic logging of working hours using the template's predefined categories.Failing to track time prevents any objective assessment of the profitability of governance duties.
Treating the owner's manual site hours as direct labour savings.Allocating the value of lost management time as lost business and managerial revenue.Time spent on the tools prevents identifying profitable calls for tenders and managing corporate finances.

Fatal governance errors and economic impact

Failing to structure managerial duties creates heavy structural overspending. The first pitfall is the lack of selective bidding: caught up in day-to-day production, the owner bypasses Go/No-Go screening, resulting in loss-making contracts that erode margins by roughly 35 000,00 CHF to 80 000,00 CHF per financial year. The second error involves delays in administrative tracking and closing work-in-progress positions with the fiduciary, causing avoidable cash-flow bottlenecks. Finally, a lack of operational delegation stunts the development of mid-level managers, driving staff turnover among qualified personnel with replacement costs hovering around 25 000,00 CHF per hire.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures and scenarios below are illustrative examples designed to guide implementation within the context of French-speaking Switzerland.

Representative scenario: Masonry and renovation contractor (Canton of Vaud)

In a Vaud SME of 18 employees specialising in the renovation of residential buildings, the owner spent an average of 22 hours per week on construction sites resolving technical hitches and delivering tools. Implementing the 10-day log highlighted a monthly total of 88 hours of untracked manual labour. Calculating the opportunity cost put this lost managerial value at an indicative figure of approximately 14 500,00 CHF per month, taking into account unchased quotes and scheduling delays. The delegation plan established a lead foreman for site logistics and handed execution checks over to the site manager, freeing the owner to focus on financial steering and strategic business development.

Frequently asked questions

How do you calculate the director's hourly opportunity cost?

The method divides gross annual margin by actual productive working hours. For an SME generating 600 000,00 CHF in gross margin across 1 800 hours of activity, every hour spent on the construction site carries an opportunity cost of roughly 333,35 CHF.

Is tracking executive management time mandatory in Switzerland?

Under Ordinance 1 to the Labour Act, time tracking is mandatory unless formally waived through a collective agreement for senior executives earning a gross salary above 120 000,00 CHF. Maintaining this daily log protects overall profitability.

Who oversees site safety when I step back from the field?

The Construction Works Ordinance requires the employer to appoint a competent person on each site authorised to issue instructions. Delegating this duty relieves the owner while ensuring full compliance with SUVA guidelines.

How can I delegate procurement without risking budget overruns?

The director defines a financial approval threshold, such as 1 500,00 CHF per purchase order for the foreman. Detailed descriptive quotes and quantity take-offs are managed separately through our dedicated module in the Soumissions section.

What is the first site task to hand over this week?

Material drop-offs and workshop cleanups often take up 8 hours per week. Delegating this logistics work to an operative paid under the collective agreement yields an estimated executive trade-off gain exceeding 1 200,00 CHF.

Shifting from a hands-on tradesperson mindset to an executive managing role requires reliable steering tools, clear boundaries of responsibility, and strict compliance with labour law. To elevate your governance and automate weekly management trade-offs, explore our dedicated resources: