Template and resource

Downloadable Template: Inventory and Inspection Register (Excel / PDF)

Download the plant, machinery, ladder and PPE inventory & inspection register for Swiss SMEs. Compliant with OPA, CFST 6508 and SUVA requirements.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An operational shutdown resulting from the failure of unlogged tools generates crew idle-time costs on the order of 1 200 to 3 500 CHF per day of interruption, eroding the item's gross margin according to the work schedule.
  2. Legal / Joint Body / SUVA: Under art. 82 LAA, the employer takes the necessary measures to prevent accidents; if defective, unrecorded PPE is found, SUVA or the cantonal labour inspectorate may order work on the structure to be stopped pursuant to the Ordinance on the Prevention of Accidents and Occupational Diseases.
  3. Administrative / Handover: The absence of a maintenance history for lifting and access equipment complicates operational traceability during the joint inspection of the work under standard SIA 118, delaying signature of the contractual acceptance protocol.

This inventory and monitoring register formalises the periodic inspection of power tools, portable ladders, and personal protective equipment for business owners, site managers, and foremen in the construction sector across French-speaking Switzerland. Structured in accordance with CFST 6508 directive requirements and art. 3 OPA concerning protective measures and installations, the document establishes thorough traceability from the moment equipment enters the central store until its operational deployment. It allows you to log every visual inspection and weed out damaged gear before it is dispatched to the construction site.

Using this combined Excel workbook and printable workshop PDF sheets avoids issuing non-compliant gear, thereby preventing unscheduled downtime and setbacks during joint-commission inspections or occupational safety audits. Unit costing of work and calculation of prime costs are handled within the Soumissions space, while formal joint records of site progress are managed in the Portail.

Downloadable document — PDF and XLSX (27 ko)

Inventory and inspection register — machinery, ladders, PPE

Receive the document

Receive this document by email

Enter your address: the document is sent to you immediately. The link remains valid for 7 days. Your data is not shared with third parties.

Operational structure of the Excel workbook and PDF inspection sheets

The documentation kit combines a dynamic Excel workbook with four direct inspection sheets in PDF format, ready to print or use on a tablet. This structure ensures continuity between the central store and day-to-day operations at the workstations. It comprises eight main sections across both media:

  • "Readme" sheet: operating protocol, breakdown of responsibilities according to the CFST 6508 directive, and inspection frequencies.
  • "Parameters" sheet: locked drop-down lists (CFC categories, compliance statuses, inspection intervals in months, location by warehouse or vehicle).
  • "Register" sheet: master database logging the entire fleet of tools, ladders, and personal protective equipment.
  • "Summary" sheet: automated dashboard highlighting overdue deadlines, overall compliance rate, and scrapings.
  • Visual check — portable ladder: site-ready sheet dedicated to stiles, rungs, anti-slip feet, and spreader devices.
  • Visual check — fall protection PPE (harness, lanyard, energy absorber): inspection sheet covering webbing, stitching, carabiners, and fall-indicator tags.
  • Visual check — portable / power tools: inspection protocol for guards, power supply cords, triggers, and arrest devices.
  • Inventory and inspection monitoring (paper version): summary hard-copy register designed to be posted in the warehouse or site trailer.

The storekeeper or workshop supervisor handles the initial data entry and tracks review dates in the Excel workbook. Foremen and site managers fill in the visual check sheets in the field at every weekly start-up or following any unusual incident.

Column-by-column user guide for the register matrix

The "Register" sheet brings together the technical data required to ensure occupational health and safety in accordance with the Ordinance on the Prevention of Accidents and Occupational Diseases:

  • Column A (Internal identifier): unique alphanumeric code affixed to the equipment (engraved label or weatherproof barcode).
  • Column B (Equipment description): exact technical designation (cordless rotary hammer, angle grinder, single leaning ladder, safety harness).
  • Column C (Operational assignment): allocation to a designated worker, a service van, or the central depot.
  • Column D (Commissioning date): entry of the purchase date, serving as the baseline to assess technical wear and service life.
  • Column E (Inspection interval): selection via drop-down menu (3, 6, or 12 months) based on usage intensity and manufacturer specifications.
  • Column F (Date of last visual check): manual entry of the most recent inspection validated on a field sheet.
  • Column G (Next due date): automated formula calculating the exact due date based on the chosen inspection interval.
  • Column H (Operational status): dynamic display via conditional formatting: green (compliant), amber (due within 15 days), red (overdue or non-compliant).
  • Column I (Corrective action / Decision): mandatory note whenever a defect is found: kept in service, workshop repair, or immediate destruction.

Comparison table of traceability practices

Careless records weaken the employer's standing during an audit by enforcement authorities or SUVA inspectors. The following table contrasts practices to avoid with rigorous wording to adopt:

Risky wording / frequent mistake Compliant formulation or practice Why
"Gear checked by crew" with no date or inspector name. "Visual check performed on 14.10.2026 by M. Dupont, qualified storekeeper". Failing to identify the inspector makes the check legally indefensible in an audit.
"Power cord repaired with electrical tape". "Damaged cord: machine tagged out and removed from stock the same day". Patching up a power cable creates a proven risk of electric shock on the construction site.
"Ladder slightly bent but usable for small jobs". "Stile deformed after impact: scrapped and destroyed immediately". The Construction Works Ordinance prohibits the use of unstable or degraded equipment.
"Fall arrest harness is clean, looks new". "Harness inspected: bar-tack stitching intact, no chemical traces, expiry date 2028". Protective gear may appear clean while hiding textile degradation undetectable without methodical checks.
"Waiting for repairs in the back of the van". "Red tag attached: gear locked in warehouse quarantine area". Leaving defective gear accessible inevitably leads to unauthorized use by someone on site.
"All in working order" on a single blanket line for ten machines. "Individual line entered with dedicated serial number for each piece of equipment". The inventory must provide unit-level traceability for every tool governed by occupational prevention rules.

Critical errors locked out by the register

Strict maintenance of the register shields you against failures whose operational fallout directly disrupts your company's workflows:

  • Use of defective power tools: a short circuit or mechanical breakdown brings an installation crew to a standstill. Indirect costs from lost hours and logistical rescheduling typically range between 850,00 to 2 400,00 CHF depending on the crew size involved.
  • Fall from an unsafe ladder: using an access tool with worn feet exposes workers to slipping hazards. Work stoppages and temporary replacement costs frequently amount to 4 500,00 to 12 000,00 CHF for the firm.
  • Retaining expired PPE in service: deploying a safety harness with degraded fibres exposes the employer to direct liability during labour inspections, often triggering an immediate stop-work order on site.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The data below are representative scenarios developed for instructional purposes to illustrate how to implement the inventory register on site:

Representative scenario: Finishing work contractor in Lausanne (Vaud)

A drywall and painting contractor with 18 employees is carrying out renovations on an office building. During morning tool distribution, the foreman notices a cut in the cable of a drywall sander and a bend in the top rung of an access ladder. Thanks to the visual check sheets included in the kit, both items are immediately declared non-compliant. The foreman logs their status in the "Register" sheet, quarantines the gear with red tags, and orders backup tools listed in the "Parameters" sheet. Total downtime is kept to 25 minutes, preventing the use of hazardous gear and protecting worker health in full compliance with Swiss safety regulations.

Frequently asked questions

Who is qualified to carry out the periodic inspection of an angle grinder?

A competent person trained under the Ordinance on the Prevention of Accidents and Occupational Diseases performs the visual check. They record the inspection of the guard and cable in the firm's internal plant register.

How long must inspection records for fall arrest harnesses be retained?

The employer retains each annual PPE sheet throughout the entire service life of the equipment. This written log satisfies the requirements of the Federal Accident Insurance Act during labour inspections.

How should a ladder with a bent stile be handled on a construction site?

The foreman logs the equipment as out of service in the register and attaches a red tag. It is removed from the fleet for scrapping, heading off non-compliance costs on the order of 450.00 CHF.

Does a digital version on a tablet replace the physical workshop register?

Yes, digital tools with time-stamped PDF exports are fully accepted provided the data remains accessible. The site manager can then present the inspection reports during any SUVA site inspection.

How often should comprehensive maintenance of power tools be scheduled?

The firm performs a quarterly visual inspection and an annual insulation measurement pursuant to the Construction Works Ordinance. Average preventive maintenance costs stay around 85.00 CHF per inventoried machine.

Ensuring lasting compliance across your equipment fleet

Rigorous monitoring of plant, tools, and PPE keeps your team safe while protecting your company's operational profitability. To refine your logistics, deploy risk assessment tools, or train your supervisory staff, explore our ecosystem's related resources: