Template and resource

Downloadable Template: Plan B Matrix (PDF / Excel)

Download the Plan B matrix and risk register for Swiss construction SMEs. Excel and PDF template to safeguard your governance, margin, and jobsites.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Unexpected budget overrun during a key failure, causing operating losses in the range of 40 000 CHF to 90 000 CHF per construction site in the absence of a documented fallback solution under the Code of Obligations (CO).
  2. Legal / Joint / SUVA: Work stoppage ordered during a safety inspection due to lack of preventive measures, conflicting with the general planning obligation set forth in art. 3 OTConst and the requirements of the CFST 6508 directive.
  3. Administrative / Acceptance: Joint verification blocked upon completion of work, leading to deferred release of financial guarantees under SIA 118 due to lack of operational planning.

This risk register and Plan B matrix structures business continuity for French-speaking Swiss construction SMEs employing 5 to 50 people. Designed for business leaders, site managers, and foremen, the tool is deployed during annual planning or phase preparation to handle failures of critical personnel, subcontractors, and key suppliers.

The workbook locks in governance by assigning a quantified fallback protocol for every critical event. It prevents executive isolation for management, safeguards operating profitability, and ensures compliance with operational commitments without disrupting execution schedules.

Downloadable document — PDF and XLSX (23 ko)

Plan B Matrix — Construction SME risk register

Receive the document

Receive this document by email

Enter your address: the document is sent to you immediately. The link remains valid for 7 days. Your data is not shared with third parties.

Operational architecture and workbook structure

The template consists of an Excel workbook structured into six interconnected worksheets, accompanied by a PDF version for management reviews. Initial data entry is handled by the company director or site manager during the preparation phase, followed by a monthly review with foremen. The BOSS method structures data updates to prevent management isolation when operational contingencies arise.

The tool strictly incorporates the required sections for business continuity:

  • "Readme" worksheet: summary of the BOSS methodology, update protocol, and allocation of decision-making responsibilities.
  • "Parameters" worksheet: probability scales from 1 to 5, financial criticality thresholds in CHF, and a named list of emergency substitutes.
  • "Register" worksheet: analytical inventory of operational threats, designated owners, and fallback trigger conditions.
  • Risk register and Plan B: operational matrix matching the anticipated event with the validated alternative technical solution.
  • Risk map (place the number of each risk): 5x5 visual matrix positioning each vulnerability according to its probability and financial impact.
  • Plan B Test: annual simulation protocol designed to test substitute responsiveness without involving the business owner.

Methodical user guide for the operational worksheets

Setting parameters and initialising thresholds

The user first configures the "Parameters" worksheet, defining severity categories based on the size of the business (for example: critical impact starting at 30 000 CHF of potential loss for a company with 15 employees). This sheet also centralises contact details for backup partners: approved subcontractors, secondary suppliers, and qualified temporary workers.

Analytical data entry in the "Register" worksheet

Each row corresponds to a specific event capable of disrupting a construction site or support functions. Management enters the risk ID, factual description, probability of occurrence, and estimated impact in CHF. The workbook automatically calculates the financial exposure score (Probability × Impact). The user verifies the consistency of the resulting criticality level and appoints the competent person responsible for follow-up, in accordance with occupational health and safety requirements.

Activating the Risk Register and Plan B

This section details the immediate operational response. The manager enters the alert trigger (e.g., foreman sick leave exceeding 48 hours), the substitute action (e.g., deploying a trained deputy foreman), and the expected fallback cost premium. The workbook calculates the residual cost after mitigation, verifying the financial viability of the chosen solution.

Plotting on the Risk Map

The user transfers the ID assigned to each risk onto the visual matrix grid. This graphical layout highlights vulnerabilities located in the red zone, which require priority treatment before starting any new phase of works.

Validation via the Plan B Test

The final worksheet records management simulation drills. The business owner simulates an unexpected ten-day absence or the abrupt shutdown of a partner concrete batching plant. The team tests the chain of command without executive intervention, logs observed bottlenecks, and refines fallback procedures.

Comparative table of formulations and management practices

Risky wording / frequent mistake Compliant formulation or practice Why
"The boss manages supplier contingencies on a case-by-case basis." "List of three pre-approved alternative suppliers with active accounts in the Parameters sheet." Prevents supply chain bottlenecks and eliminates dependence on the owner's physical availability.
"Replacing the site manager with a temporary worker at short notice." "Appointing a senior foreman trained in-house on site management procedures." Ensures immediate mastery of technical protocols and prevents administrative tracking errors.
"Risk of accident on the construction site: be careful around scaffolding." "Weekly compliance inspection under the Construction Work Ordinance carried out by a designated competent person." Fulfills the formal appointment obligation set out in art. 5 OTConst and prevents work stoppages by the labour inspectorate.
"Defaulting subcontractor: we will check with a peer when the time comes." "Emergency framework agreement negotiated with two qualified regional partners." Allows work to resume within 48 hours without suffering unfair emergency price markups.
"Financial closing: the owner sends invoices to the fiduciary when time permits." "Fixed weekly transmission schedule handled by administrative staff with 13-week cash-flow tracking." Provides ongoing visibility over cash flow and prevents default on social security contributions.
"Plan B untested because the team is overwhelmed." "Documented semi-annual switchover simulation on a critical jobsite process." Verifies operational readiness of backup solutions before an actual crisis endangers liquidity.

Fatal governance errors locked out by the template

Rigorous implementation of this register eliminates three major pitfalls typical of trade contractors:

  • Single-point-of-failure employee without backup: the sudden absence of a site manager holding exclusive access and instructions creates work stoppages costing around 15 000 CHF to 45 000 CHF per week of delay. The register enforces a documented backup pair for every critical role.
  • Cash-flow collapse due to lack of foresight: poor tracking of receivables and reliance on a single client weaken operational stability, risking forced bank overdrafts in the range of 50 000 CHF to 120 000 CHF. The analytical sheet mandates client risk diversification.
  • Failure to comply with safety coordination rules: lacking formal safety management exposes the SME to administrative site shutdowns ordered by authorities or SUVA, leading to contractual delay penalties of around 2 500 CHF per working day.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures below are illustrative examples formulated for educational purposes and do not represent actual construction sites.

A general contractor specialising in structural work based in the canton of Vaud, employing 22 staff, is building the structure of a multi-family residential building. During the preparatory phase, the managing director identifies two major threats in the "Register" worksheet: extended breakdown of the main tower crane and unexpected incapacitation of the licensed crane operator.

The probability of operator unavailability is rated at 2/5, but the financial impact of a crane shutdown amounts to 4 500 CHF per day of idle ground crews. The formal contingency plan arranges advance training for an in-house machine operator holding a SUVA crane licence as direct backup. During the annual drill using the "Plan B Test" sheet, the company simulates the main crane operator's absence on a Friday morning. The backup operator takes command within 45 minutes without disrupting the concreting schedule. The actual financial impact was limited to an overtime wage supplement of 350,00 CHF instead of an estimated operating loss of 9 000,00 CHF over two full days of stoppage.

Frequently asked questions

How often should our SME risk matrix be updated?

Reviews are carried out monthly by management and at every critical construction site phase. For a financial risk estimated illustratively at around 45 000,00 CHF, this update ensures alignment with the Construction Work Ordinance.

Who should manage the risk register according to the CFST 6508 directive?

The business owner retains overall accountability but mandates their internal safety officer. For a potential construction site stoppage in the range of 18 500,00 CHF, site coordination follows the rules of the CFST 6508 directive.

How do you quantify the financial impact of a subcontractor default?

The assessment combines penalties stipulated under the Code of Obligations (CO) with emergency intervention surcharges, illustrated for instance at 32 000,00 CHF. To prepare quantity surveys or analyse unit prices, refer to the Soumissions tools.

Does the Excel workbook replace final works acceptance procedures?

No. The matrix safeguards the trade contractor's internal operations. Managing joint verifications and handling notice of defects from the client are carried out under SIA 118 on our dedicated portal.

Where should risks related to staff skills and wages be recorded?

Managing collective wage scales, hiring, and compliance with collective labour agreements (CLA) falls under the Jobs section. The Plan B matrix only incorporates the gross impact of a key absence, illustrated at 12 400,00 CHF.

Methodical contingency management safeguards a trade contractor's operational liquidity against unexpected production disruptions. To expand this governance framework and build operational autonomy within your site supervisory teams, explore our dedicated resources: