Guide

MSST System and Organisation of a Roofing Company (CFC 224) in the Canton of Bern

MSST organisation for a CFC 224 roofing firm in the canton of Bern under CFST 6508. Asbestos prevention, fall protection, and bilingual site management.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: A work stoppage caused by bad weather in the Bernese Oberland or an organisational breakdown leads to gross margin losses of around 8% to 15% of the roofing package value, regulated under the works contract.
  2. Legal / Joint body / SUVA: Failure to organise health and safety through the absence of a designated competent person pursuant to art. 5 OTConst exposes the company to SUVA enforcement actions and civil liability.
  3. Administrative / Handover: The unexpected discovery of materials containing asbestos during renovations of older roofs brings progress to a halt and delays the joint inspection required by norm SIA 118, postponing the release of retention money.

In the canton of Bern, running a roofing company (CFC 224) requires navigating the specificities of a bilingual territory alongside sharply contrasting climatic conditions, from the Alpine ridges of the Oberland to the industrial valleys of the Bernese Jura and Biel/Bienne. Roofing works directly expose crews to the risks of falls from height, brittle antique corrugated sheeting breaking underfoot, and sudden gusts of wind.

Pursuant to art. 3 OTConst, works must be planned so that the risk of accidents or health impairments is kept as low as possible, particularly where the presence of asbestos is suspected. Implementing directive CFST 6508 calls for rigorous governance, translated on the ground by safety sheets accessible via QR code and drafted in both French and German for every team leader.

Free software, runs directly in your browser

Studio MSST: safety procedures and QR code notices

Build your MSST procedures, print workstation safety sheets and their QR codes. Everything runs locally in your browser, with no data transmitted.

Open software

Critical CFC 224 hazards and MSST system integration

Roofing operations involve vital risks requiring standardised procedures in accordance with directive CFST 6508. The priority hazards identified for the trade include falls from roofs or through fragile surfaces, older building materials potentially containing asbestos, and direct exposure to weather and high winds.

Integrating these hazards into company workflows relies on assigning clear duties starting from work preparation. The business owner and the site supervisor verify that collective protective measures are adequate before sending roofers onto the roof. Older roofs composed of corrugated fibre-cement sheets require a prior pollutant audit. If any doubt arises during dismantling, staff enforce the stop-work principle until clarification is provided by the site management.

Bernese specificities: institutional bilingualism and Alpine rigour

The canton of Bern imposes distinct organisational requirements. As a bilingual territory, it brings together French-speaking teams in the Bernese Jura, bilingual teams across the Biel/Bienne agglomeration, and German-speaking crews in the Seeland, the Bern region, and the Oberland. Safety instructions, workstation sheets, and construction site notices must strictly be drafted in both French and German to guarantee immediate comprehension by all workers and apprentices.

In the Bernese Oberland, high elevation and the mountain climate require strict weather monitoring. Early frosts, sudden wind gusts, and snowfalls transform roof pitches into hazardous slip zones. The cantonal labour inspectorate and SUVA inspectors strictly check the wind anchoring of facade scaffolding and ensure that workers are barred from traversing unsecured damp surfaces.

Field procedures and the roofer's STOP-point matrix

The table below outlines the operational protocols that every team leader enforces on Bernese construction sites:

Work situationIdentified hazardOrganisational and technical measureTrigger criterion for the STOP point
Pitched roof tile replacementFall from the roof edgeInstallation of facade scaffolding with compliant upper guardrailsIncomplete scaffolding or missing decking
Work on corrugated sheetsFracture of brittle elementInstallation of rigid walkways and load-distributing crawler boardsAbsence of a secured access path
Stripping roof coverings installed prior to 1990Airborne asbestos fibresVerification of the diagnostic report before handling any materialsSuspected asbestos without an official audit report
High-altitude site exposed to windWorkers destabilised and materials blown awayHalting the handling of large panels and securing all tarpaulinsViolent winds making it difficult to maintain balance
Installation of verge sheet-metal workFall from heightSetting up roofing brackets and safety harnesses where mandatedVerge guardrail missing or improperly secured
Walking on roofs during winterSlips on frost or snowPrior snow clearing and salting, or postponing the interventionPresence of black ice hiding the foothold surface

Standard weekly organisation in a roofing SME

The reliability of an MSST system relies on an unvarying weekly cycle:

  • Monday morning (Preparation): The site supervisor reviews cantonal weather forecasts and confirms the safety plan for each construction site with the team leaders.
  • Wednesday (Instruction): Holding a bilingual safety toolbox talk on the construction site. Analysis of a specific task: slinging crane loads or handling personal protective equipment.
  • Friday afternoon (Inspection and feedback): Yard tidy-up, inspection of ropes and lines, checking the condition of safety nets, and signing off on intervention reports for management.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following figures and case scenarios are illustrative examples intended to guide practical company organisation.

Typical scenario: Roof renovation in Saint-Imier (Bernese Jura)

A Bernese company of 14 employees carries out the complete refurbishment of a dual-pitch roof on a residential rental building, representing an order volume of 84 500,00 CHF. The crew includes a bilingual team leader, two French-speaking roofers, and a German-speaking labourer. The roof structure includes corrugated sheeting originally installed in 1978.

The chosen operational approach relied on sharing the asbestos diagnostic report certifying the absence of hazards before work commenced, supported by bilingual instruction sheets posted inside the van. The team leader called a STOP point on the very first day upon noticing that a section of the facade scaffolding did not extend high enough past the verge. Work only resumed once the scaffolder adjusted the setup, keeping workers safe and shielding the firm's financial margin from any shut-down order issued by the cantonal labour inspectorate.

Frequently asked questions

How should Bernese bilingualism be managed for safety sheets?

Directive CFST 6508 requires instructing workers in an easily understandable manner. In the canton of Bern, issue every workstation sheet in French and German to ensure crew compliance.

What budget should be planned to structure an MSST safety binder in roofing?

For an SME with ten roofers, plan for an internal investment of around 4 200,00 CHF. To calculate your quantities and intervention unit prices, explore our dedicated tool on /soumissions/.

How should exposure to older asbestos-containing roofs be documented?

The construction work ordinance mandates an immediate stop upon any unexpected discovery. Record every pre-work diagnostic report in the mobile app to ensure precise occupational health tracking for your employees.

What precautions should be taken against severe weather in the Bernese Oberland?

The construction work ordinance requires interrupting work in the event of high winds or freezing conditions. The team leader records the weather stoppage in the digital daily log accessible via QR code.

Where should works handover and roofing reservations be handled?

Joint inspection and snagging lists under norm SIA 118 fall under contract execution management. To manage your formal sign-off minutes with the site management, use our platform at /portail/.

A rigorous MSST organisation safeguards the margin of a Bernese roofing company against roofing risks. To explore our procedures in greater depth, review our specialised resources: