MSST System and Organisation of a Building Cleaning Firm (CFC 287) in the Canton of Vaud

MSST setup, CFST 6508 directive and CFC 287 construction cleaning safety in the Canton of Vaud. Practical method for SME owners.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Unplanned extra costs in the range of 4 500,00 CHF to 12 000,00 CHF linked to standby time or rework during blocked access in dense urban areas. For detailed costings, see /soumissions/.
  2. Legal / Joint Body / SUVA: Work stoppage ordered by labour inspectors or SUVA for lack of fall protection on glazing, pursuant to the construction work ordinance.
  3. Administrative / Handover: Refusal to sign the end-of-lease or post-construction cleaning sign-off, blocking the release of advance payments under standard SIA 118 (details on /portail/).

In the Canton of Vaud, running a building cleaning company (CFC 287) demands rigorous organisation in the face of constraints across the Lausanne urban area and the Vaud Riviera. Between restricted access, handling deliveries of chemical products, and high-altitude construction sites exposed to freezing conditions in the Vaud Jura or the Pre-Alps, employers must formalise their MSST system in accordance with directive CFST 6508 and art. 82 LAA to ensure the safety of their personnel.

Employing multilingual teams and cross-border workers requires straightforward visual instructions at workstations. Pursuant to art. 5 OTConst, appointing a competent person capable of enforcing safety rules reduces the risk of slips, toxic inhalation, or falls from height while working on external glazing, while protecting the SME's operating margins.

Free software, runs directly in your browser

Studio MSST: safety procedures and QR code notices

Build your MSST procedures, print workstation safety sheets and their QR codes. Everything runs locally in your browser, with no data transmitted.

Open software

Major hazards in construction cleaning (CFC 287) and MSST integration

Post-construction and heavy-duty maintenance cleaning (CFC 287) involves specific operational risks that require organisational measures in compliance with directive CFST 6508. The main hazards fall into four critical areas:

  • Chemicals: handling acid strippers, solvents, or alkaline products to restore floors and wall tiles, which exposes workers to chemical burns and toxic fumes, requiring compliance with ventilation rules under the construction work ordinance.
  • Slips and trips on the level: persistent presence of soapy wash water, damp stripped floors, and residual debris left behind by other trades.
  • Work at height on glazing: washing bay windows, glass roofs, and facades using telescopic poles, scaffolding, or mobile elevating work platforms, requiring fall protection in accordance with the construction work ordinance.
  • Site order and tidiness: logistical coordination of sorting and removing cleaning waste without blocking escape routes.

Operating specificities in the Canton of Vaud

Organising a Vaud-based building cleaning firm involves managing three specific local realities:

  • Managing multilingual and cross-border teams: linguistic diversity requires displaying visual safety instructions, accompanied by clear pictograms and simplified safety data sheets in French and in the main native languages spoken on site.
  • Dense urban constraints (Lausanne, Riviera): restricted access points require strict delivery windows for industrial vacuums and chemicals, agreed in advance with the site management to avoid logistical clashes.
  • Winter conditions (Vaud Jura and Pre-Alps): sub-zero temperatures create severe ice hazards on external slabs during final post-construction cleaning, calling for specific pre-salting protocols and a ban on washing down with large amounts of water in freezing weather.

Priority procedures and on-site STOP points matrix

To ensure day-to-day safety, the MSST system formalises six critical situations in an operational matrix provided to site foremen:

Work situationIdentified hazardOrganisational and technical measureImmediate STOP point
Acid stripping of new floor tilesSkin burns, harmful fumesWearing chemical-resistant gloves, goggles, checking ventilationEnclosed room with no mechanical or natural air renewal
Upper-floor window cleaningFall from heightUse of secure platforms or ground-level polesMissing guardrail or improvised use of an unstable stepladder
Drainage of squeegee wash waterSlips, loss of balanceMarking wet zones, wearing slip-resistant footwearUnmarked or slippery shared walkway
Working in congested areasTripping over debris from structural workPrior coordination with site managementBlocked evacuation route or emergency exit
Outdoor cleaning in freezing conditionsSlip and fall on icy groundPreventive salting of access paths, postponing wet washingUntreated black ice on walkways
Handling heavy scrubber-dryersCrush injuries during loading/unloadingUsing certified ramps and securing loads inside vehiclesExcessive ramp incline or equipment unsecured for transport

Organisation of the typical week: preparation, briefing and monitoring

Effective site supervision relies on a three-part weekly routine:

  • Monday (Logistical preparation): review safety data sheets for detergents, check personal protective equipment stock, and confirm cantonal access permits with site supervisors.
  • Wednesday (Operational briefing): safety toolbox talk on site led by the competent person, review of product data sheets and translation of instructions for temporary or cross-border staff.
  • Friday (Inspection and traceability): review inspection checklists, verify the condition of power tools, and log findings in the internal operating register.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following data are illustrative examples designed to assist in planning typical construction sites in the Canton of Vaud:

Typical scenario: Post-construction cleaning in a dense urban area (Lausanne)

On a new multi-family residential building in downtown Lausanne, a team of 6 cleaners works for 4 days on complete deep cleaning before handover. Constrained by narrow streets that prevent long-term parking of technical vans, the firm schedules morning deliveries staggered between 06h30 and 07h15. The primary identified hazard is cleaning external loggia glazing where no permanent anchor points exist. The firm rules out the use of simple ladders and arranges for the erection of an access tower with guardrails, supplemented by telescopic cleaning poles operated from the ground for upper sections. For any question regarding cost estimates or unit prices, please refer to the dedicated tenders section.

Frequently asked questions

Who appoints the MSST contact person in a Vaud cleaning SME?

Company management formally appoints this employee, trained in line with directive CFST 6508. They coordinate safety data sheets and preventive measures across construction sites in Lausanne or Aigle.

What budget should be planned to equip a post-construction cleaning crew?

Plan an indicative budget of around 450.00 CHF per worker for personal protective equipment compliant with the construction work ordinance. Detailed costing on /soumissions/.

How should stripper safety data sheets be handled for non-French-speaking staff?

The employer translates the instructions and uses visual pictograms supplemented by QR codes under directive CFST 6508, giving multilingual crews direct access to handling rules.

Does high-level window cleaning in the Vaud Jura require a written plan?

Yes, the construction work ordinance requires planning preventive fall protection measures whenever cleaning takes place from work platforms or scaffolding exposed to bad weather.

Where should safety checks be recorded before handing over cleaned premises?

Self-inspections for cleanliness and safety are logged on a traceable digital tool, while the final joint walkthrough with the site management is run directly via /portail/.

Rigorous organisation in line with directive CFST 6508 ensures operational safety and profitability for a Vaud CFC 287 cleaning firm. To refine your procedures, explore our dedicated resources: