Skip to content
Website
Sign in Sign up
Guide

MSST System and Organisation of a Sheet-Metal Firm (CFC 222) in the Canton of Bern

Deploy the MSST system for a sheet-metal firm in the canton of Bern. Bilingual procedures, CFST 6508 directive, and roof safety for your teams.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An unplanned gutter rework generates an additional cost of around 4 500,00 CHF on operating margin, due to a lack of technical directives under standard SIA 118.
  2. Legal / Joint bodies / SUVA: A construction site shut down by SUVA during hot work without an operating extinguisher violates the general duty of prevention under art. 82 LAA.
  3. Administrative / Acceptance: Lacking a safety and health protection plan under art. 4 OTConst blocks access to Bernese municipal roofs and delays the joint inspection.

In the canton of Bern, managing a sheet-metal contracting firm (CFC 222) requires strict adaptation to geographical and linguistic specificities. From the French-speaking Bernese Jura to the Alpine valleys of the Oberland subject to early frost, crews face the critical risks of falls from height, fragile corrugated sheet failures, and burns during brazing. Implementing a structured MSST system ensures that both workshop and field operations comply with the requirements of directive CFST 6508.

Bernese bilingualism requires formalising work instructions and emergency protocols in both French and German. Safety sheets handed out to site foremen clarify the use of restraint equipment and post-soldering thermal monitoring. This organisation standardises occupational risk prevention while protecting the overall profitability of construction sites against regional inclement weather.

Free software, runs directly in your browser

Studio MSST: safety procedures and QR code notices

Build your MSST procedures, print workstation safety sheets and their QR codes. Everything runs locally in your browser, with no data transmitted.

Open software

Integrating sheet-metal work hazards into the Bernese MSST system

Sheet-metal work (CFC 222) concentrates critical risks tied to roof falls, stepping through fragile materials, burns or fire outbreaks during brazing, as well as harsh weather conditions. In the canton of Bern, organising the firm in line with directive CFST 6508 requires practical rollout in both official languages, French and German. In the French-speaking Bernese Jura as in the bilingual agglomeration of Biel/Bienne, operational communication must be understood unambiguously by every installer. In the Bernese Oberland, altitude and exposed slopes dictate strict management of inclement weather, morning frost, and snow.

The SME's MSST system links continuous workplace training, assessment of fall restraint systems, and formalised instructions for torch or iron brazing. Bilingual instruction sheets, accessible via workshop files or site boards, prevent language misunderstandings when welcoming new installers. For detailed pricing of sheet-metal services, quantity take-offs, and unit prices, the company uses the dedicated tenders workspace. Likewise, collective agreement wage grid aspects fall under the recruitment and wages section.

Priority procedures matrix in sheet-metal work (CFC 222)

Bernese site foremen apply standardised operational directives to lock down safety on every roof before work begins:

Work situation Identified hazard Mandatory preventive measure Hold point (STOP)
Installation of eaves gutters Fall from roof edge Inspection of façade scaffolding or installation of a sheet-metal worker bracket scaffold Absence of compliant guardrail
Installing skylights on steel cladding profiles Stepping through translucent sheets Solidly secured heavy-duty covers over fragile zones Unprotected or unverified sheet
Brazing eaves flashing strips Fire and thermal burns Flame shield and verified fire extinguisher within arm's reach Presence of oxidisers or bare insulation
Folding and cutting in the workshop Cuts and entanglement on folding machines Cut-resistant protective gloves and set backgauges Faulty emergency stop device
Roof work in winter Slips on frost or snow Prior de-icing and postponement of exposed tasks Icy slope without secured access
Copper soldering in roof spaces Air quality and toxic fumes Mechanical ventilation and respiratory protective mask Confined, unventilated roof spaces

Organisation of the typical week: preparation, briefing and monitoring

Running a Bernese sheet-metal firm relies on a weekly operational rhythm balanced between workshop and installation:

  • Friday afternoon (Preparation): Analysis of roof access for the following week's construction sites, ordering zinc or copper strips, and checking thermal equipment. Local site management signs off on interfaces with roofers.
  • Monday morning (Briefing): Ten-minute safety briefing in French for Bernese Jura crews or in German for the Oberland. Assigning fire watch duties for hot work.
  • Wednesday (Site inspection): Unannounced walk-through by the safety officer or business owner with the MSST checklist to verify anchor points and fire extinguisher readiness.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures presented in the following scenarios are illustrative examples intended to model the operational management of an SME using the BOSS method.

Scenario 1: Roof renovation in Tramelan (Bernese Jura)

A sheet-metal firm with 14 employees carries out flashing repairs on a residential apartment building. The deployed crew includes a foreman and two French-speaking sheet-metal workers. While stripping down old flashing, the crew notices deteriorated timber decking beneath the gutters, creating a risk of falling through the boarding. The site foreman immediately calls a STOP point. He logs the non-conformity in the bilingual safety sheet, alerts site management, and secures the opening with temporary decking boards. This protocol prevents physical injury and a site shutdown that would have generated an estimated 3 200,00 CHF in direct equipment downtime costs.

Scenario 2: Chalet project in Thun (Bernese Oberland)

A Bernese contractor installs copper standing seam roofing on a steep roof, employing four German-speaking installers. In November, early snowfall turns the battens slippery. Applying the internal directive on winter conditions, the owner suspends eaves work and reassigns the crew to the prefabrication workshop to shape downpipes. This proactive planning protects employee safety while keeping the week profitable; acceptance minutes and punch-list management with the client are handled separately through appropriate contract administration tools.

Frequently asked questions

How do you manage Bernese bilingualism for MSST instructions in sheet-metal work?

Directive CFST 6508 requires clear communication for all. In the Bernese Jura and Biel/Bienne, the firm issues safety sheets in French and German to remove any technical ambiguity.

Who approves fall protection measures specific to Alpine roofs in the Oberland?

Under the construction work ordinance, the employer appoints a safety specialist to specify in writing the measures adapted to frost and steep pitches on Bernese roofs.

What equipment budget should be planned to secure brazing in the shop and on site?

As an illustration, setting up hot work stations, including ventilation pursuant to the construction work ordinance, represents an estimated investment of around 4 500,00 CHF per crew.

Where can you find unit price schedules for sheet-metal work?

To prepare your itemised quantity take-offs or review reference costs without disrupting your crews' workflow, visit the dedicated /soumissions/ platform to accurately price each work item.

How do you formalise the acceptance of gutters installed according to standard practice?

To record the joint inspection of folded flashings without mixing MSST protocols and contractual tracking under standard SIA 118, produce your acceptance minutes directly through the /portail/ application.

Rigorous implementation of the MSST system in the canton of Bern guarantees the profitability of sheet-metal workshops and protects installers against climatic hazards. To take your operational and contractual processes further:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.