Tool and user guide

Follow-Up Sequence Planner for Open Quotes (D+3, D+10, D+21)

Schedule follow-ups on your quotes in Switzerland. Calculate your weighted order book and safeguard building firm margins without wasting time.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Order book drift and unforeseen cash flow shortfalls exceeding 85 000,00 CHF in downtime over a quarter due to a lack of sales anticipation, in conflict with the management diligence dictated by the Code of Obligations (CO).
  2. Legal / Joint Body / SUVA: Rushing into contracts without prior review of the safety measures required by the construction work ordinance (OTConst), exposing crews to technical and organisational planning flaws as soon as the site opens.
  3. Administrative / Acceptance: Contractual ambiguity regarding scope of work and tacit acceptance of conflicting client requirements, triggering major disputes during the inspection of the work under norm SIA 118 for lack of a clear initial agreement governed by art. 1 CO.

In the French-speaking Swiss construction sector, submitting a quote without methodical follow-up is a dead loss of engineering and costing resources. Site management teams and clients systematically compare several competing quotes. Without a formalised contact process at D+3, D+10, and D+21, the building contractor remains at the mercy of third-party schedules rather than steering its own workload. This structured pacing swiftly yields a firm decision, resolves any technical discrepancies in the specifications, and verifies the prospect's genuine interest without tying up the technical office needlessly.

This planner turns your sales follow-up into a reliable forecasting metric for your order book, weighted by award probabilities. All calculations run directly in your browser, without transferring or hosting confidential data on remote servers. To prepare your quantity take-offs or check unit prices, visit the Soumissions section; for practical hand-over formalities governed by norm SIA 118, visit the Portail area.

How the follow-up algorithm works and calculation of the weighted order book

The planner relies on arithmetic of scheduling and sales probability. The algorithm computes contact milestones from the quote issue date using configured intervals: Follow-up 1 at D+3 to confirm proper technical receipt, Follow-up 2 at D+10 to address questions from site management, and Follow-up 3 at D+21 to secure the contract award or close the file. The tool identifies the next required action by comparing today's date against theoretical follow-up dates, factoring in the number of follow-ups already completed.

The weighted order book calculation multiplies the net amount (excl. VAT) of each tender by its closing probability using the following formula: Weighted Amount = Amount (CHF excl. VAT) × Probability (%) ÷ 100. This approach enables SME managers to forecast the actual workload of installation crews without distorting cash flow projections with uncertain quotes. Unit prices and itemised bills of quantities stem from an initial costing study, whereas commercial scheduling ensures a consistent capacity plan.

Sales pipeline tracking metrics

The tool singles out quotes requiring urgent action using an overdue indicator: any uncompleted follow-up whose computed due date is prior to the current date increments the alert counter. This safeguard prevents administrative stall when dealing with public or private clients.

Tender fileAmount excl. VAT (CHF)ProbabilityWeighted amount excl. VAT (CHF)Active milestoneFollow-up status
Detached house (Canton of Vaud)48 500,0080 %38 800,00D+3Initial telephone contact
Residential rental building (Geneva)162 000,0050 %81 000,00D+10Technical explanation of variant
Light-industrial warehouse (Fribourg)74 200,0030 %22 260,00D+21Final decision expected
Roof renovation (Neuchâtel)31 800,0090 %28 620,00D+3File receipt confirmed
Office conversion (Valais)115 000,0040 %46 000,00D+10Site access schedule adjustment

The cumulative volume of this sample represents 431 500,00 CHF excl. VAT in face value, but reflects a realistic weighted order book of 216 680,00 CHF excl. VAT. This uncertainty-adjusted figure serves as a benchmark for hiring decisions or material procurement.

Step-by-step calculation example for a quote file

Consider an exterior joinery quote sent on 1 October for an amount of 54 000,00 CHF excl. VAT, estimated at a 60 % closing probability:

  • Amount excluding VAT: 54 000,00 CHF
  • Probability rate: 60 %
  • Weighted value in pipeline: 54 000,00 × 0,60 = 32 400,00 CHF excl. VAT
  • Applicable Swiss VAT (8,1 %): 54 000,00 × 0,081 = 4 374,00 CHF
  • Total quote amount submitted to client: 58 374,00 CHF incl. VAT

The tool schedules the initial check on 4 October (D+3), the quote follow-up on 11 October (D+10), and the closing milestone on 22 October (D+21). Under art. 6 CO, where the offeror was not bound to expect an express acceptance due to the circumstances, the absence of refusal within a reasonable timeframe may constitute conclusion of the contract; however, in construction contracts subject to standard rules, silence from the client does not constitute acceptance, requiring formal approval prior to ordering any materials.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following scenarios are illustrative examples developed to assess follow-up planning within representative regional contexts.

Scenario 1: Masonry firm in the Gros-de-Vaud (18 employees)

A Vaud SME issues three simultaneous quotes for adjoining villas, totaling 285 000,00 CHF excl. VAT. The files go unanswered for seventy days due to a lack of time on the owner's part. By adopting the planner, the technical assistant schedules follow-ups at D+3, D+10, and D+21. At the D+10 mark, the architect points out that an access variant was unclear in the itemised quote. The company supplies the technical clarification without modifying its prices, securing two out of three lots for a total of 190 000,00 CHF excl. VAT (8,1 % VAT: 15 390,00 CHF, or 205 390,00 CHF incl. VAT), preventing a late-winter production slump.

Scenario 2: Plumbing & Sanitary Installations firm in Geneva (9 employees)

Faced with tight competition on apartment building renovations managed by professional agents, this Geneva-based outfit suffered unanticipated decision postponements. Introducing the tool allowed them to assign a strict probability to every open tender. On a pipe renewal quote priced at 88 500,00 CHF excl. VAT, the D+21 follow-up revealed that the property management firm was awaiting a specific certification before awarding the contract. The document was provided that very day, unlocking the order of 88 500,00 CHF excl. VAT (8,1 % VAT: 7 168,50 CHF, or 95 668,50 CHF incl. VAT) ahead of a passive competitor.

00:00 - 00:15 AI Avatar: A quote without a follow-up vanishes into thin air. Without a clear procedure, your quotes linger on the adjudicator's desk while your margins erode.

00:15 - 01:10 Screen and Diagrams: View of the planner: enter the amount of 48 500,00 CHF, configure the stages at 3, 10, and 21 days. The alerts flag priority follow-ups and recalculate the projected pipeline without remote storage.

01:10 - 01:30 AI Avatar: Adopt this routine today. Download our email templates and safeguard your order book on the Swiss craft trade campus.

Frequently asked questions

What validity period should be stated in a quote to facilitate follow-ups?

Contractually stipulate a validity period of thirty days. Beyond this term, your unit prices lapse, justifying a courtesy call before updating your planned crew bookings.

Should the sequence dates be adjusted depending on quote size?

For a 12 500,00 CHF repair job, stick to the standard schedule. For contracts exceeding 150 000,00 CHF, adjust the intervals to five, fifteen, and thirty days to accommodate the formal decision-making process.

How should a public tender subject to procurement rules be handled?

Public procurement rules prohibit direct follow-ups during tender evaluation. Use the tool solely to log the expected results publication date, without interfering with the cantonal awarding authority's formal procedure.

What should you do when a client fails to reply after the third follow-up?

Change the quote status to closed to clear the weighted order book. Send a polite notice confirming that the file is archived and that the reserved schedule slot has been released.

Why apply a declining win probability in the calculations?

A lack of response weakens budget forecasts. Halving the conversion probability after each unanswered contact keeps your cash flow projection sound without artificially inflating future revenue.

Where should the bid opening and contract award minutes be recorded?

Record the final decision in your project file. For everything related to quantity take-offs or detailed schedule of rates, refer to dedicated tender tools for price breakdown.

To give your sales workflows lasting structure and bolster your firm's profitability, make use of our complementary trade resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.