Template and resource

Downloadable Template: Phone scripts and follow-up emails (PDF)

Download the Excel workbook for following up open quotes at D+3, D+10, and D+21. Protect your Swiss construction SME margins under the Code of Obligations.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Direct cash-flow erosion from forgotten submitted quotes, resulting in lost earnings of around 40 000,00 CHF to 90 000,00 CHF in missed awards due to a lack of rigorous sales follow-up within the binding contractual period under the Code of Obligations (CO).
  2. Legal / Joint Body / SUVA: Absence of traceability of mutual commitments creating disputes over the scope of safety services required under the Construction Work Ordinance (OTConst), without prior written agreement compliant with art. 1 CO.
  3. Administrative / Acceptance: Crew scheduling bottlenecks and delayed procurements due to lack of formal confirmation, postponing the start of construction site work and the future joint inspection under standard SIA 118.

This Excel workbook standardises follow-up on open quotes for construction SMEs in French-speaking Switzerland with 5 to 50 employees. Designed for company owners, site managers, and administrative managers, it structures phone and written follow-ups at specific milestones after sending the quote. This operational tool eliminates lost tender awards caused by simple administrative oversight and secures the order book against demanding clients.

Systematic use of this template prevents late acceptance of proposals that have turned unprofitable due to rising material prices. It ensures a smooth transition to construction site preparation without committing human resources before the formal conclusion of the works contract. For initial cost estimation using unit prices or quantity surveys, see our Soumissions module, while snag management at completion is handled by our Portail platform.

Document download — XLSX (20 KB)

Follow-up tracker for open quotes D+3 / D+10 / D+21

Receive the document

Receive this document by email

Enter your address: the document is sent to you immediately. The link remains valid for 7 days. Your data is not shared with third parties.

Structure and operation of the quote follow-up workbook

The file is an operational workbook in xlsx format, structured to absorb the quote workflows of a general contractor or a craft workshop. It is managed jointly by the technical office and site managers. Every issued quote is logged as soon as it is sent to the client or site management.

The document contains five complementary sheets with strictly defined roles:

  • "Read Me" sheet: records internal operating rules, the role of each employee, and a reminder of quote validity periods set by the Code of Obligations (CO).
  • "Settings" sheet: centralises hourly time-and-materials rates, the Swiss VAT rate at 8,1 %, project managers' initials, and standard rejection reasons to populate the drop-down menus.
  • "Quotes" sheet: main log for entering open quotes, including internal reference, client details, issue date, total amount in CHF, status, and completion dates for D+3, D+10, and D+21 follow-ups.
  • "Summary" sheet: dynamic dashboard that automatically calculates the total outstanding amount, overall conversion rate, and business volume breakdown by site manager.
  • "Scripts" sheet: ready-to-use templates for follow-up phone calls and emails, tailored to each contact type (architect, property management firm, or private client).

Step-by-step operational instructions sheet by sheet

In the "Quotes" sheet, the administrative staff enters the submission date, client name, and net amount excluding tax. The workbook automatically calculates VAT at 8,1 % as well as the deadline dates for the three contact stages: D+3 to verify proper technical receipt, D+10 to address questions regarding options, and D+21 to secure a decision before the quote expires. The site manager selects the status from a drop-down list ("Pending", "Won", "Lost", "No further action") and enters the actual contact date along with a summary of up to three lines.

The "Summary" sheet consolidates these lines without manual entry. It visually alerts the business owner to quotes exceeding 21 days without a response. This data enables proactive adjustments to operational staffing schedules without unnecessarily straining cash flow.

Comparison table of sales follow-up practices

The table below compares informal habits with structured follow-up methods recommended to safeguard the margins of a Swiss SME:

Risky wording / frequent mistakeCompliant formulation or practiceWhy
Following up without a script: "Have you had a chance to look at our quote?""I am contacting you to ensure our technical variants and options are entirely clear."Showcases trade expertise and initiates a constructive technical dialogue with the architect.
Leaving a quote without an explicit validity period.Specifying a precise validity period (e.g. 30 calendar days).Art. 6 CO governs the absence of an acceptance notice; without a deadline, the quote exposes the contractor to material price increases.
Waiting 6 weeks before making initial phone contact.Formal receipt confirmation at D+3, followed by a technical review at D+10.Prevents the project from being awarded to a more responsive competitor by the local site management.
Granting a discount over the phone as soon as the client hesitates.Proposing an adjustment of deliverables or execution variants.Preserves net margin without eroding the perceived value of craft trades.
Failing to track rejections and their actual causes.Entering the reason for loss in the "Quotes" sheet (price, lead time, competitor).Enables the business owner to analyse estimating variances during periodic financial reviews with the fiduciary.
Treating a verbal confirmation as a final agreement.Requiring the return of the initialled quote or a written purchase order.Legally secures the mutual commitment before placing binding procurement orders.

Critical mistakes eliminated by this tool

The first risk eliminated is the late award of an obsolete quote. If a client accepts a proposal after six months of inflation without the firm having formalised its expiry, the purchasing cost overrun can lead to a loss of around 15 000,00 CHF on an exterior joinery package. The second pitfall is a scheduling gap in the order book: a lack of visibility over outstanding quotes prevents anticipating schedule dips, causing uncovered fixed overheads of around 25 000,00 CHF per month for a crew of ten installers.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures presented in the scenarios below are purely illustrative examples intended to demonstrate the use of the file.

Sample scenario: Rental renovation in the Canton of Vaud

A plastering and painting contractor with 12 employees tenders for the refurbishment of a residential building in Lausanne, for an amount of 84 240,00 CHF incl. VAT (8,1 % VAT included). The office logs the quote into the "Quotes" sheet. At D+3, the site manager calls the property management company to confirm that the quantities are clear. At D+10, a standardised email from the "Scripts" sheet specifies available lead times. This responsiveness secures the contract against two competitors who conducted no follow-up, locking in crew scheduling two months in advance.

Sample scenario: Construction of a detached house in Valais

A timber framing workshop with 8 workers submits a quote for 118 800,00 CHF incl. VAT in Sion. At D+21, the architect informs the contractor that the quote exceeds the preliminary budget by 5 000,00 CHF. Using the options provided in the "Scripts" tab, the workshop manager proposes an alternative for the secondary structure instead of granting an outright discount. The contract is finalised at 113 400,00 CHF incl. VAT, preserving profitability.

Frequently asked questions

What validity period should be stated on a quote to facilitate follow-ups?

Contractually set a validity period of thirty calendar days. Under the Code of Obligations (CO), this timeframe allows you to pace reminders at D+3, D+10, and D+21 without appearing pushy, thereby protecting your purchase prices against unforeseen increases.

Should you lower your price during the final closing call at D+21?

No, never offer an unsolicited discount. Stand behind the quality of your services and offer instead to adjust technical variants or phasing. For any unit price or quantity survey calculations, refer to the dedicated tools at /soumissions/.

How do you follow up with site management without damaging site relations?

Adopt a technical, coordination-oriented approach. Confirm receipt of the documents, confirm your crews' scheduling availability, and ask if any execution details require clarification. For handling works acceptance under standard SIA 118, visit /portail/.

How should you archive an open quote that receives no reply after the sequence?

Mark the status as lost due to lack of response in your tracking sheet once the validity period has expired. This frees up crew planning capacity and lets you adjust cash flow projections without skewing the order book.

Who should handle follow-up phone calls in a construction SME?

The site manager or project estimator who priced the project handles the technical call to address implementation questions. Administrative staff takes care of written transmission confirmations and spreadsheet updates.

Rigorous sales follow-up safeguards your operating margin and solidifies work schedules across your construction business. To explore these methods further and integrate our management tools, check out our dedicated resources: