Tool and user guide

Safety Induction Programme for New Hires and Temporary Workers (Day 1)

Safety induction protocol for permanent and temporary staff under CFST 6508 and OTConst. Day 1, Week 1 and Month 1 checklist for Swiss SMEs.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: An accident during the first week leads to team disruption, temporary replacement costs and higher accident insurance premiums representing costs in the range of 15 000 CHF to 45 000 CHF per serious loss event, reducing the item's margin under the Federal Law on Accident Insurance. For detailed pricing of line items, see our dedicated tools.
  2. Legal / Joint body / SUVA: The lack of formal induction and designation of a competent person under art. 5 OTConst exposes the firm to a work stoppage ordered by the labour inspectorate or SUVA pursuant to the Labour Act and CFST Directive 6508.
  3. Administrative / Acceptance: Failure to track skills and safety induction certificates compromises client safety audits, halting monthly payment certificates or delaying stage sign-offs governed by standard SIA 118.

SUVA statistics show that starting a new position is the critical period of exposure to accident risks on Swiss construction sites. For permanent staff as well as temporary agency workers, taking up a post requires strict formalisation from the very first hour. Pursuant to art. 82 LAA, firm management and local site management must ensure that every worker masters the vital rules, identifies danger areas and wears personal protective equipment suited to actual working conditions.

Safety induction allows no verbal improvisation: the BOSS method structures onboarding around precise chronological milestones on the first day (Day 1), at the end of the first week (Day 7) and at the end of the first month (Day 30). This online interactive tool enables site managers and foremen to assess the completeness of the instructions delivered without server data transfer, ensuring compliance with the requirements of CFST Directive 6508 before any unsupervised work starts in French-speaking Switzerland.

How the induction algorithm works and calculation method

The assessment tool structures operational onboarding around the principles of CFST Directive 6508 on the involvement of occupational physicians and other occupational safety specialists. The framework relies on strict scheduling comprising eleven checkpoints divided across three mandatory milestones: day of arrival (Day 1), end of the first week (+7 days) and end of the first month (+30 days). The overall progress indicator reflects the completion of checks as a direct ratio:

Progress rate (%) = 100 × (number of validated points ÷ total number of checkpoints on the track)

A lockout rule governs the entire procedure: the points assigned to the arrival day are critical prerequisites. As long as a single point of this initial milestone remains unvalidated, the worker may not perform any task autonomously on the construction site. For temporary workers assigned by a staff leasing agency, the initial check includes formal verification of qualification certificates sent by the agency as well as the provision of personal protective equipment meeting the specific requirements of the project.

Control milestone matrix according to contractual status

Time milestone Nature of technical inspection Weighting (%) Permanent staff Temporary staff
Day 1 (morning) Protective equipment, SUVA vital rules, emergency plan 27,27 % Mandatory Critical blocking
Day 1 (afternoon) Guided tour of walkways, storage areas, site installations 18,18 % Mandatory Mandatory
Day 7 (+7 days) Check of trade practices, power tools, buddy system 18,18 % Mandatory Mandatory
Day 14 (+14 days) Intermediate review, feedback and safety debrief 18,18 % Mandatory Depending on mission duration
Day 30 (+30 days) End-of-probation review, autonomy confirmed by supervisory staff 18,19 % Mandatory Not applicable (< 1 month)

Example calculation of internal supervisory costs for induction

Supporting a new hire requires technical supervisory time from the foreman and the SME's safety officer. The following illustrative estimate details the organisational investment required over the first month for a bricklayer in a Swiss firm, excluding equipment costs. For detailed pricing of work items, quantity take-offs and tender prices, please refer to our dedicated module at /soumissions/. Similarly, consulting collective wage rates falls under our /jobs/ platform.

  • Day 1 induction by the safety officer: 2,50 hours valued for example at 95,00 CHF excl. VAT = 237,50 CHF excl. VAT
  • On-site mentoring by the foreman in week 1: 6,00 hours valued at 85,00 CHF excl. VAT = 510,00 CHF excl. VAT
  • Follow-up interviews at Day 7 and Day 30 by site management: 2,00 hours at 110,00 CHF excl. VAT = 220,00 CHF excl. VAT
  • Internal administrative costs and company register updates: estimated flat rate of 120,00 CHF excl. VAT
  • Total supervisory expenses excluding tax: 1 087,50 CHF excl. VAT
  • Value-added tax (VAT 8,1 %): 88,10 CHF
  • Overall total induction investment incl. VAT: 1 175,60 CHF incl. VAT (rounded to 0,05 CHF)

This organisational investment, in the order of 1 000 CHF to 1 500 CHF per worker, safeguards production and prevents unscheduled work stoppages.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following situations represent sample scenarios drafted as examples, illustrating how the induction tool operates in practice within companies subject to Swiss law.

Sample scenario 1: Induction of a temporary bricklayer on structural work (Canton of Vaud)

A structural work SME in Vaud employing 24 workers uses a temporary worker to reinforce its formwork teams on a multi-family housing construction site in Lausanne. The worker arrives on site on Monday morning.

  • Configuration: Entry of identity, selection of the "Temporary worker" option, arrival date configured. The track locks access to formwork panels as long as milestone Day 1 does not show 100 % compliance.
  • Resolution: The foreman checks the qualifications declared by the temporary work agency, issues the helmet with chin strap, goggles and suitable footwear, then provides instruction on the site safety plan. Three out of the eleven checkpoints on the overall track are ticked that very morning, representing 27,27 % progress. The tool confirms that the critical prerequisites are met. The worker is paired strictly with a qualified permanent worker for seven days, prohibiting any lone work on open edge areas.

Sample scenario 2: Permanent hiring of a plumbing and sanitary installations fitter (Canton of Geneva)

A Geneva building services finishing work firm recruits a permanent sanitary installer within a team of 12 fitters working on the extensive refurbishment of an office building.

  • Configuration: Selection of the "Permanent employee" profile, initialisation of the 30-day schedule to cover the entire contractual probation period.
  • Resolution: On Day 1, sign-off of emergency procedures, verification of power tool authorisations and identification of utility shut-offs (45,45 % progress at the end of the day). At the end of week 1 (Day 7), the site manager conducts the intermediate check covering ergonomics, the use of collective protective equipment and workstation housekeeping (progress raised to 63,64 %). On Day 30, the final interview validates autonomous operation of specialised equipment and closes the record at 100 %. The induction file is archived in the firm's documentation system in accordance with CFST Directive 6508.

00:00 - 00:15 AI Avatar: Letting a new arrival climb onto scaffolding without formal induction exposes your SME to serious work stoppages from their very first hours on site.

00:15 - 01:10 Screen and Diagrams: View the sequential Day 1, Day 7 and Day 30 track. The tool locks each step of equipment issue, tool checks and safety directives prior to any authorisation for unsupervised work.

01:10 - 01:30 AI Avatar: Download the on-site checklist immediately and onboard your permanent or temporary workers in full compliance with trade standards.

Frequently asked questions

Who must conduct safety induction for temporary workers?

The hiring firm conducts the induction at the workstation. The foreman checks personal protective equipment in accordance with the Construction Work Ordinance before any work starts.

Can a temporary worker work alone on the first day?

No, total autonomy is out of the question on the first day. The worker remains under direct supervision until emergency procedures and vital rules are signed off on the induction sheet.

How do you formalise induction under CFST Directive 6508?

The employer records workstation instruction, identified hazards and preventive measures in writing. The signed induction sheet provides proof of the practical implementation of the firm's safety organisation.

What is the cost of missing an induction if a site is shut down?

A stoppage ordered by the labour inspectorate represents a loss in the region of 2 400,00 CHF per day for a four-person crew, not including project delivery delays.

Where should pay issues for new hires be addressed?

Wage scales and provisions of the applicable collective agreement are matters of contract management. These administrative hiring components are handled separately on the dedicated jobs platform.

When should checks be carried out at milestones Day+7 and Day+30?

The foreman reviews progress on the seventh day to consolidate trade skills, and at thirty days to sign off the end of the probation period under the Code of Obligations (CO).

Written tracking of inductions directly protects crew health and stabilises the SME's operational workflow. To structure your internal protocols and train site management, consult our complementary resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.