Template and resource

Downloadable Template: Signed Safety Induction Booklet (PDF)

Download the Day 1 safety induction booklet for new hires and temporary staff in Switzerland. Compliant with CFST 6508, art. 82 LAA and art. 5 OTConst.

Table of contents
The 3 Major Site Risks
  1. Financial / Profit margin: Disorganisation on day one leads to phased shutdowns and drops in output. The cost of an uncontained accident can exceed a direct loss of 15 000 CHF to 45 000 CHF on the firm's operating margin under the accident and occupational disease prevention ordinance.
  2. Legal / Joint Body / SUVA: Under art. 82 LAA, the employer takes the necessary steps to prevent accidents and workers use their protective equipment. Art. 5 OTConst requires designating a competent person on every construction site to lead safety and remove anyone creating a hazard. A failure to provide formal instruction exposes the site management and supervisory staff to prosecution under the Swiss Criminal Code.
  3. Administrative / Acceptance: Lacking proof that instructions were acknowledged and protective gear was issued halts access to sites audited by SUVA. This paperwork gap stalls progress on contractual phases and delays the joint verification required by SIA 118.

This safety induction booklet in PDF format standardises the immediate integration of every new permanent worker, apprentice or temporary hire. Structured for French-speaking Swiss construction SMEs, it formalises checks before the first task, confirms equipment handovers and structures follow-up at day 7.

Filled in from the moment work begins, the document protects the company legally by establishing material proof of the instructions delivered. It eliminates supervisory oversights, guarantees the traceability of internal policies and protects productivity from the very first hour on site.

Document download — PDF (8 KB)

Day 1 safety induction — new hire and temporary worker

Receive the document

Receive this document by email

Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.

Operational structure of the safety induction booklet (PDF)

The document is set up as a two-page PDF form, printable or completed on a site tablet. Designed for practical use on site without red tape, it revolves around three validated sections: Before the First Task, Issued PPE, and Day 7 Follow-up. This document is completed jointly by the team leader or site supervisor and the worker, upon arrival on the site at 07:00 for the first two sections, and then followed up at the end of the first week.

Section 1: Before the first task

This section validates prerequisites before any tool is picked up. The supervisor enters the worker's identity, their employment status (permanent, apprentice, temporary) and their placement agency where applicable. Checkpoints verify that SUVA's vital rules applicable to the trade were communicated, that alcohol and drugs are strictly prohibited, and that emergency resources are visually identified: site first aid kit location, name of the designated first-aider, and emergency exits. The worker confirms having received the instruction to stop work in case of serious danger and to notify supervisors in accordance with the construction work ordinance.

Section 2: Issued PPE

The second section inventories the personal protective equipment allocated to the worker. Each line specifies the equipment handed out or checked by the firm: suitable safety helmet, high-visibility clothing in fluorescent colours with retro-reflective strips, safety shoes with puncture-resistant soles, safety glasses and hearing protection compliant with the accident and occupational disease prevention ordinance. The worker ticks each received item, confirms its working condition, and signs with the exact date and time.

Section 3: Day 7 follow-up

The third section formalises the review meeting at the end of the first week of work. The direct supervisor assesses ongoing compliance with safety rules, effective wearing of protective gear, and integration into production paces. Should any failure be observed, corrective actions are recorded: targeted reminders of rules, reissue of suitable equipment, or closer supervision alongside an experienced colleague. A second joint signature closes the process and approves independent work on the workstation.

Site practices: terms to avoid and Swiss standards

Risky wording / frequent mistakeCompliant formulation or practiceWhy
Verbal instruction: "Watch out for skips" without written proofInduction booklet signed off: plant traffic zones explained and signedA lack of documentary proof triggers management's civil liability if an accident occurs.
"The temporary worker wears his own worn-out shoes"Compliance check of equipment or immediate supply by the SMEThe host employer is responsible for the safety of temporary or dispatched staff on its site.
"Helmet available in the van if needed"Named allocation of a compliant helmet before entering work areasHard hats must be worn at all times in areas exposed to falling materials.
"Trained on the fly by colleagues"20-minute guided walkthrough with the team leader on the morning of arrivalInformal handovers consistently skip emergency stop locations and first-aid resources.
Backdated signature at month-end for the payroll fiduciaryJoint signature on Day 1 at 07:00 before any handling work on the construction siteAn accident occurring on the first morning without a signed booklet leaves the firm with no proof of training.
Skipping the status review at the end of the weekFormal 10-minute interview recorded under the Day 7 follow-upPoor posture habits and shortcuts take root during the very first days.

Critical errors locked down by the induction booklet

A lack of supervision on day one exposes the SME to severe financial and operational consequences. The first failure involves an untracked induction of a temporary worker injured during their first shift. With formal instruction missing, the site shutdown ordered by the labour inspectorate or SUVA causes an overall productivity loss in the range of 8 500,00 CHF to 25 000,00 CHF on the current phase. The second mistake is supplying unsuitable or uninspected gear, causing sick leaves that disrupt team rotations and drive up LAA insurance premiums by roughly 4 000,00 CHF to 12 000,00 CHF over the following financial year.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following data are illustrative examples developed for the application of the BOSS method and do not represent actual construction sites.

Standard scenario 1: Masonry contractor in the canton of Vaud

A Vaud SME with 24 workers is carrying out work on a residential building project in Lausanne. On Monday morning, two temporary shuttering carpenters are assigned by an agency. The team leader sets aside 25 minutes before cranes start operating to complete the PDF booklet. The workers sign for the receipt of hard hats and fluorescent vests and acknowledge the assembly point location. The following Friday, the Day 7 review notes inconsistent use of hearing protection during concrete scabbing; an immediate reminder is recorded. This protocol cleared up the issue without incident, ensuring site compliance during a spot check by the cantonal joint inspectorate.

Standard Scenario 2: Plumbing & Sanitary Installations firm in the Canton of Valais

A Valais-based firm with 12 employees brings in a new permanent sanitary installer on a refurbishment project in Sion. Right upon arrival at the workshop, the site supervisor fills in the initial section and gets the inventory signed for equipment including grinding goggles and cut-resistant gloves. The Day 7 review confirms a solid understanding of room ventilation rules required by the construction work ordinance. This written record protected the company's margin by eliminating any risk of being held liable for supervisory negligence.

Frequently asked questions

Who must sign the induction booklet when a temporary worker arrives?

The temporary worker and the competent person designated by the employer sign the document that very morning. This record proves compliance with safety rules under the construction work ordinance and protects the business.

What budget should you plan to outfit a new mason with basic gear?

For a complete, compliant set of gear including helmet, footwear, and fluorescent clothing, budget roughly 420.00 to 680.00 CHF per worker in line with directive CFST 6508. Detailed unit prices are available on our dedicated platform.

How should sign-off sheets be archived under data protection law?

Signed booklets are kept in a secure digital format for the duration of the employment relationship under the Federal Act on Data Protection. Only site management and the safety officer have access to them.

What should you do if a new worker refuses to use the issued protective gear?

Under the construction work ordinance, anyone refusing to apply safety measures must leave the construction site. The employer records the incident in writing without delay to protect the trade firm's liability.

Does the PDF booklet replace the safety plan drawn up for the site?

No, the booklet formalises the worker's individual instruction, whereas the safety plan required by the construction work ordinance coordinates all technical workstations and emergency response measures for each specific project.

Rigorous day-one onboarding protects your teams and safeguards your SME's liability during SUVA inspections. To explore practical rollout and skill development for your site supervisors, explore our dedicated resources: