Skip to content
Website
Sign in Sign up
Practical guide

Processus or Trainual / Whale: Office Procedures or Offline Construction Site Procedures?

Comparison criteria between Processus, Trainual and Whale for Swiss construction: offline use, CFST 6508 directive, LPD compliance and field reality.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: A loss of productive hours around 5 to 10 % of the monthly payroll during operational blockages or while waiting for instructions in basements with no network coverage, directly diluting the execution margin.
  2. Legal / Joint Body / SUVA: The unavailability of mandatory safety instructions during an inspection by the authorities or SUVA, engaging the employer's liability under art. 82 LAA, which requires the application of appropriate preventive measures.
  3. Administrative / Handover: The inability to prove traceability of execution checks and worker information ("Read and understood"), weakening the work record file and compliance with the MSST system of the CFST 6508 directive.

This comparative guide is intended for Swiss construction SME directors, site managers, foremen and administrative managers who need to equip their teams with reliable standard operating procedures. The choice often comes down to international business documentation platforms built for office environments, such as Trainual or Whale, versus solutions developed specifically for the demands of Swiss construction sites, like Processus. In full compliance with fair competition rules, we express no subjective judgment or unverified technical claims regarding these tools: we set out an objective operational framework—offline operation, data governance under the LPD, alignment with the CFST 6508 directive—that every business owner is encouraged to verify directly with each software vendor.

Related aspects of tender preparation and price analysis belong to the section dedicated to tenders. Likewise, joint inspection reports and reservations under the SIA 118 standard depend on the monitoring portal, while collective labour agreement minimum wages and hiring are handled in the jobs section. The analysis below focuses exclusively on the handover of working methods, offline document access and managing certifications in the Swiss field.

Technical and legal selection criteria for the field

Choosing between generalist knowledge base software and a tool dedicated to construction operations comes down to the physical environment of Swiss construction sites. A firm active in finishing work or structural work faces infrastructural constraints that office applications often overlook. The manager must evaluate each solution against six decisive criteria.

1. Full availability without network coverage (offline mode)

Work in underground car parks, service ducts, lift shafts or Alpine rural areas frequently takes place in white spots. Documentation hosted on a standard web portal becomes inaccessible as soon as the 4G or 5G signal drops. The employer must verify whether the application allows a full offline package to be stored locally on the smartphone. This feature ensures safety data sheets can be viewed and checks with photos can be recorded without an active connection, followed by automatic synchronisation once connectivity returns.

2. Instant QR code access without complex navigation

On the construction site, a plumber or formworker does not browse through a dense document tree. Displaying a physical QR code on a temporary electrical panel, a concrete batching plant or a storage area must directly open the current version of the technical directive. Direct access reduces execution errors and ensures teams apply the standard approved by technical management.

3. Compliance with the MSST system and requirements of the CFST 6508 directive

Swiss regulations require a formalised occupational safety organisation. The CFST 6508 directive specifies the obligations to call upon occupational physicians and other safety specialists (MSST specialists) as well as the implementation of safety concepts tailored to specific hazards. The Ordinance on the Prevention of Accidents and Occupational Diseases and the Federal Act on Accident Insurance require the employer to take all necessary and appropriate measures. The software must track individual "Read and understood" sign-offs per employee, archive certifications with expiry dates and formalise the safety plan required by the Construction Work Ordinance.

4. Data protection and hosting under the LPD regime

The revision of the Federal Act on Data Protection strengthens the liability of companies handling personal data. Personnel files, skills tracking, medical fitness certificates and photo records constitute protected data. The business owner must ensure that servers are located in Switzerland or in a country guaranteeing a level of protection recognised as adequate by the Federal Council, and that technical subcontractors comply with security and proportionality principles.

5. Multilingual ergonomics for production crews

Construction sites in Romandy employ a multicultural workforce. The tool must not impose a complex English interface or be restricted to pure text. Integrating visual diagrams, annotated photo steps and simple validation workflows reduces language barriers and ensures effective uptake in the field.

6. Pricing model and total cost of ownership in CHF

Price structures billed per named user penalise businesses employing production workers who only access the system occasionally. You should check the total annual cost in Swiss francs (CHF), including office licences, mobile field access and technical support fees.

Decision criteria comparison table

Operational and normative criterionOffice documentation tool (e.g. Trainual, Whale)Site-specific trade application (e.g. Processus)Recommended verification checkpoint for the manager
Offline operationFrequent reliance on the browser and 4G/5G coverage.Offline package stored locally on the mobile device.Test opening an operating procedure in flight mode in a basement.
Access point on the workstationText search via internal engine or hyperlink.Physical QR code placed on equipment, panel or test area.Check whether scanning directly opens the latest approved version.
Safety traceability (CFST 6508 / MSST)Generic quizzes, reading tracking tailored to office onboarding.Field inspection sheets, "Read and understood" sign-off, licence alerts.Check alignment with the 10 points of the MSST system.
Field anomaly reportingGeneral forms or third-party modules requiring integration.Forms to complete with time-stamped photos and immediate sign-off.Measure the time required to log a non-conformity report on mobile.
Data protection (LPD)Often international hosting subject to standard clauses.Dedicated hosting, often in Switzerland, compliant with the LPD.Request the exact geographical location of the storage servers.
Organisational structureContinuous procedural manuals oriented towards business processes.Structured breakdown: Management, Standardise, Site, Team.Check alignment with the real workflows of a construction SME.

Common rollout errors and financial impacts

Choosing a tool unsuitable for the realities of construction sites creates recurring disruptions:

  • Abandonment of the tool by field personnel: Imposing an office interface on assemblers or bricklayers leads to system rejection. Instructions remain unused at the warehouse, fostering assembly errors whose rework costs frequently run between 4 500,00 CHF and 12 000,00 CHF in non-billable labour per construction site.
  • Documentation gaps during joint committee audits: Inability to produce the training certificate or assembly procedure on the construction site exposes the firm to liability before cantonal inspectors or SUVA representatives, potentially resulting in immediate work stop orders.
  • Proliferation of obsolete versions: Distributing printed documents or unsynchronised PDF files leads to defects whenever technical adjustments occur during the project.

For quantity takeoffs and unit price breakdowns, firms should look to tender tools. Likewise, handover reports under the SIA 118 standard fall under the contract management portal, while wage agreements are handled on dedicated platforms.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The following scenarios are illustrative examples designed to examine selection criteria in representative contexts across Romandy.

Scenario 1: Heavy basement refurbishment in Geneva (GE)

A Geneva-based structural work firm (22 employees) is working on the conversion of three private underground car park levels. Reinforced concrete walls completely block mobile networks. The teams must apply a strict propping and cutting procedure compliant with the safety directives of the Construction Work Ordinance. Using a traditional documentation system without offline mode, workers had to walk back outside to check instructions or worked from memory, creating accident risks and task stoppages. Choosing a solution that includes a complete offline package and inspection forms on smartphones allows the foreman to approve propping steps directly at the work face, maintaining the work pace.

Scenario 2: HVAC installation SME in Lausanne (VD)

A Vaud-based building services firm (35 employees) installs ventilation and heating networks in tight service ducts. Faced with the requirements of the CFST 6508 directive and acoustic installation rules, management finds that procedures sent by email go unread. The company decides to place QR code labels on distribution boxes and air handling units. Every installer scans the code to view the installation diagram and confirms the "Read and understood" prompt. This formal step reduces reservations during technical audits and ensures traceability of internal competencies required for live electrical or welding work.

Frequently asked questions

How can you prove safety compliance to SUVA without network coverage?

The employer fulfills the prevention duty under art. 82 LAA via an offline mobile package. Storing the time-stamped "Read and understood" confirmation locally synchronises documentary proof as soon as an internet connection is restored.

What requirements does the LPD impose for team records?

The Federal Act on Data Protection requires restricting access to qualifications and absences strictly to authorised individuals. Field intervention forms must be logged without transferring personal data to non-compliant servers.

What budget should be planned to digitise processes for a 15-person SME?

For fifteen employees in Switzerland, a procedural software subscription represents an indicative cost of roughly 90,00 CHF to 240,00 CHF per month, excluding internal setup fees. Production unit prices are estimated on /soumissions/.

Does a QR code on a construction site guarantee MSST compliance?

A QR code attached to a site cabinet provides access to the latest version of a safety rule. This method standardises technical dissemination under the CFST 6508 directive, but still requires effective on-site verification by supervisors.

How should execution reservations or work handovers be handled?

Process tools handle only the internal organisation of the trade firm. Joint inspection reports, formal handovers and client notice of defects under the SIA 118 standard are managed exclusively via the dedicated portal at /portail/.

How should mandatory professional qualifications be scheduled?

The skills register links each worker to their plant operator licences or safety certificates, complete with expiry reminders. For CLA wage scales and hiring contracts for construction site staff, refer to the templates available on /jobs/.

Summary of selection criteria for your SME

Choosing between an office-oriented SOP tool and an organisation system tailored to construction sites comes down to Swiss operational realities: offline functionality, QR-code traceability, compliance with CFST 6508, and field-level skills management. For tender pricing and quantity take-offs, visit /soumissions/. For working drawings compliant with the SIA 400 standard, use /plans/. Continue structuring your operations with our dedicated resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.