Skip to content
Website
Sign in Sign up
Template and resource

Downloadable Template: Payment Guarantee Request (PDF)

Download the PDF client solvency checklist and advance payment schedule for Swiss construction SMEs. Protect your cash flow and margins.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Failure of final payment or an outright loss in the region of 15 % to 30 % of the total contract sum, due to a lack of formal due dates under art. 102 CO.
  2. Legal / Joint Body / SUVA: Inability to pay social security contributions and wages mandated by cantonal joint commissions in the event of massive unpaid claims, triggering labour inspectorate audits.
  3. Administrative / Acceptance: Blocking of final acceptance of the work under standard SIA 118 and unilateral disputing of progress billings without a contractual schedule of advance payments.

This downloadable PDF template standardises the preliminary assessment procedure of clients for Swiss SME owners, site managers, and administrative officers. Used right from the bidding phase before concluding the contract for work and services, it organises commercial vetting across three steps: checking the commercial register entry via Zefix, checking the debt collection register extract, and setting up a stepped schedule of advance payments. This procedure eliminates unsecured cash flow advances for material orders and safeguards payroll coverage.

Using this checklist prevents the build-up of unrecoverable unsecured claims against shell companies or insolvent private individuals. The template establishes binding interim billing stages, giving you the legal right to suspend work before running into a critical overdraft. It provides the operational basis for Go/No-Go decisions to protect the gross margin of your trade business.

Downloadable document — PDF (9 ko)

Client solvency checklist and advance payment rule

Receive the document

Receive this document by email

Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.

Operational structure and document implementation protocol

The template comes as a two-page PDF document designed for standard administrative processing before issuing any final tender offer. It is filled in jointly by the sales manager and technical administration as soon as a quote request exceeds an internal monitoring threshold set by company management. This tool formalises the Go/No-Go decision through three standardised sections.

Section 1: Identity and registration

This section records the exact company name, registered operating address, and business identification number (UID). The administrator verifies details on the Zefix commercial register platform and checks the identity of authorised signatories holding individual or joint signature rights. The protocol confirms whether the person signing the order has the required authority to bind the debtor company, under the agency principles of art. 32 CO.

Section 2: Solvency

The administration team notes the date of receipt of an official cantonal debt collection register extract issued within the last three months. The grid details the volume of formal payment summonses served, open objections that have not been lifted, and any certificates of unpaid debts. When dealing with a newly formed public limited company (SA) or an undercapitalised limited liability company (Sàrl), this section requires an irrevocable bank guarantee payable on first demand or a joint and several guarantee from a solvent third party before committing any workforce.

Section 3: Advance payment rule (sample, customisable)

This section sets an adjustable financial schedule based on custom procurement requirements or the volume of workforce deployed. The reference schedule offers a standard breakdown: an advance payment of 30 % upon signing the contract for work and services before ordering any materials, 30 % at actual construction site setup, 30 % at a verified interim milestone, and a 10 % balance upon acceptance of the work under standard SIA 118. All figures are set in CHF and include the current Swiss VAT rate of 8,1 %.

Comparison table of contractual wordings and billing practices

Risky wording / frequent mistake Compliant formulation or practice Why
Accepting an order placed by a project manager without checking signing powers. Systematic check of the Zefix extract and signature by the registered director. Prevents the contract from being void due to a lack of legal signing authority.
Starting installation work on verbal confirmation without an initial advance payment. Condition precedent to start, tied to receiving the 30 % advance payment in the bank account. Eliminates cash flow advances on raw material purchases and removes initial non-payment risks.
Single lump-sum invoice issued only upon final delivery of the work. Staggered payment schedule based on monthly progress billings. Avoids inflated working capital requirements and curtails operating bank overdrafts.
Waiving the debt collection extract for a newly formed property developer. Requiring an extract under 3 months old backed by a bank guarantee of payment. Eliminates the insolvency risk concealed by the recent incorporation of a limited liability company.
Delivering custom materials to the construction site without prior financial cover. Advance payment upon order covering the full supplier purchase price of joinery or custom elements. Prevents the SME from carrying unusable stock in the event of contract termination.
Granting 60-day payment terms without specifying default interest. Payment terms set at net 30 days, stating the statutory annual default interest rate of 5 %. Accelerates recovery of claims and enforces Code of Obligations (CO) rules on debtor default.

Fatal cash flow mistakes prevented by the checklist

Neglecting these checks exposes your SME to three common operational losses:

  • Ordering custom prefabricated units for around 45 000,00 CHF that remain unpaid following the client's bankruptcy.
  • Assigning five workers for a month without progress billing, leading to an outright loss of roughly 32 000,00 CHF in direct wages.
  • Indefinite postponement of final payment due to a lack of fixed calendar milestones, locking up an estimated net margin of 18 500,00 CHF during year-end fiduciary closing.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The cases presented below are illustrative examples created for technical analysis and do not represent actual construction sites.

Scenario A: Renovation of an apartment building in the canton of Vaud

A plastering and painting contractor with 12 employees receives specifications for refurbishing flats in Lausanne, quoted at 86 400,00 CHF. The client is a property company incorporated the previous year. Applying Section 1 reveals that the signatory only has joint signing authority. The debt collection office extract lists two open collection proceedings totaling 14 200,00 CHF. The SME applies Section 3, refusing to proceed on standard 30-day invoice terms: it conditions its tender on a 40 % advance payment before mobilizing equipment, backed by a bank guarantee covering the remaining balance. When the client refuses the guarantee, the Go/No-Go review rejects the order, protecting the firm against insolvency.

Scenario B: Conversion of a commercial hall in the canton of Fribourg

An industrial joinery firm with 25 employees is invited to build fire-rated partition walls for 125 500,00 CHF in Bulle. The Zefix check confirms solvency and directors' signing powers, and the debt collection register extract is clean. However, procuring the panels requires an outlay of 52 000,00 CHF to suppliers. The administration customises Section 3 of the template: a 35 % advance payment at order placement to cover factory purchasing costs, 35 % upon unloading at the construction site, 20 % following installation approved by site management, and 10 % following joint verification under standard SIA 118. This schedule preserves working capital without straining shop liquidity.

Frequently asked questions

Which debt collection register extract should you request before starting a project?

Request an original extract from the debt collection office dated within the last three months. A clean extract reduces financial exposure on orders around 45 000,00 CHF, in line with the due diligence rules of the Code of Obligations (CO).

How do you verify a client company's signing powers on Zefix?

Check the cantonal commercial register via Zefix to verify whether the director holds sole or joint signature rights. Any contract involving, for instance, 85 000,00 CHF requires approval by registered signatories under federal law.

What initial advance payment should be set to fund workshop supplies?

Set an initial advance payment of 30 % upon placing the order, representing around 24 000,00 CHF on an 80 000,00 CHF contract, before committing to purchases. Fabrication must remain subject to actual receipt of funds.

How should you respond if the client refuses to provide the requested guarantees?

Use your Go/No-Go assessment to suspend the job before dispatching crews. Faced with an unjustified refusal on a 50 000,00 CHF volume, halting work protects your cash flow under general Code of Obligations (CO) principles.

Does standard SIA 118 regulate periodic advance payments against progress statements?

Standard SIA 118 provides for monthly advance payments based on actual, verified project progress. For a 60 000,00 CHF progress bill, site management has a contractual review window before funds are released.

Protecting the financial health of a construction company relies on systematic administrative checks and a strict schedule of advance payments before setting foot on site. To cost your tenders at going market rates, use our dedicated module on /soumissions/. For acceptance reports under standard SIA 118, visit /portail/. For collective labour agreement wage grids, go to /jobs/. For technical drafting, head to /plans/. Strengthen your operational setup with these essential resources:

Art Construction is an independent company: it is not affiliated with the SIA, CRB, SUVA, or KBOB. Referenced norms and standards point to publications from these bodies; only official versions are legally binding.