Download the standard filing plan and folder tree for Swiss construction SMEs. Standardise your construction site files from the office to the field.

Table of contents
The 3 Major Site Risks
  1. Financial / Margin: Loss of traceability for daywork sheets and unsigned addenda, leading to billing disputes in the region of 5 % to 12 % of the contract sum under standard SIA 118.
  2. Legal / Joint Body / SUVA: Inability to produce the health and safety plan required by art. 4 OTConst during an inspection by authorities or joint labour inspectors.
  3. Administrative / Handover: Scattered technical data sheets, certificates, and joint inspection records, stalling the submission of the as-built documentation and the arrangement of the joint inspection under standard SIA 118.

This PDF filing charter template defines naming rules, a standardised digital folder tree, and an opening checklist designed for site managers, foremen, and administrative departments of Swiss construction SMEs. Structured to bridge the technical office and field tablets, it eliminates drawing duplicates and ensures every stakeholder consults the latest approved version of working drawings.

Used right from the internal handover phase, this structured template prevents contractual documents from being overlooked and secures the archiving of records of execution. It centralises mandatory notifications as well as the site register to guarantee seamless handover to installation teams, thereby protecting the company against late claims.

Downloadable document — PDF (9 ko)

Construction site filing plan

Get the document

Receive this document by email

Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.

Operational structure and deployment of the filing charter

The document comes as an eight-page technical guide in PDF format, designed to be printed out or installed on site supervisors' tablets. It formalises the document organisation protocol for Swiss Romande SMEs across four structured sections: site folder naming, standard folder tree, site opening checklist, and construction site register. Its implementation is the responsibility of the site manager as soon as the contract is awarded, under the business owner's supervision, and is then relayed by the foreman for filing field records.

Detailed instructions for the template's four sections

Each section of the template serves an administrative and operational locking function:

  • Site folder naming: This section establishes the universal syntax for the root directory using the format [YEAR]_[PROJECT-NO]_[COMMUNE]_[CFC-CODE]_[CLIENT-NAME]. It removes special characters, spaces, and accents that corrupt mobile device synchronisation. Data entry requires entering the year with four digits and the sequential project number issued by the fiduciary firm.
  • Standard folder tree: The template details the mandatory subdivision into seven subfolders numbered 01 to 07 (01_Project-Management, 02_Technical-Drawings, 03_Safety-MSST, 04_Purchasing-Suppliers, 05_Site-Execution-Monitoring, 06_Billing-Addenda, 07_As-Built-Closeout). The user verifies that each document is filed at the designated level without creating disorderly subdirectories.
  • Site opening checklist: Completed during the handover from estimating to execution, this checklist verifies the presence of the works contract, the designation of project participants, and the compliance of safety forms. The site manager checks each item and certifies completeness before committing any labour.
  • Construction site register: A summary table maintained by the technical office, this register records start dates, initial amounts in CHF, lead site managers, and administrative closeout dates. It serves as a general index for all company employees.

Document alignment matrix: poor practices vs. Swiss standards

Risky wording / frequent mistake Compliant formulation or practice Why (operational and legal rationale)
Naming a folder "Villa Dupont" on the local server. 2026_042_PULLY_CFC211_DUPONT Enables automatic chronological sorting and avoids common duplicates during multi-project searches.
Saving a file as "Earthworks_drawing_final_v2.dwg". 20260315_DWG_CFC211_REV-C_EARTHWORKS.pdf Prevents carrying out work based on an outdated revision and standardises exports to tablets.
Mixing daywork sheets with general purchasing supplier invoices. Systematic filing under 06_Billing-Addenda/Daywork/. Guarantees the traceability of quantity take-offs for monthly billing under the Code of Obligations (CO).
Storing paper safety guidelines at the back of the van. Digital archiving under 03_Safety-MSST/ accessible via QR code. Compliance with construction work ordinance requirements during unannounced inspections.
Retaining worker identification data without access controls. Site HR folder restricted according to LPD security requirements. Complies with art. 8 LPD, which requires adequate data security through appropriate measures.
Deleting the digital folder as soon as the final invoice is paid. Permanent archiving under 99_ARCHIVES/2026/ set to write-protected. Protects access to documents in the event of subsequent disputes during warranty periods.

Critical errors eliminated by the protocol

Deploying this charter halts disruptions that weigh heavily on the operations of a construction SME:

  • Working from obsolete drawings: The lack of a rigorous folder tree regularly leads to casting footings or installing joinery based on superseded revisions, resulting in remedial work and demolition costs typically ranging between 8 500,00 CHF and 25 000,00 CHF.
  • Overlooking addendum billing: Work orders signed by the site management that get lost in private messaging apps cause a straight loss estimated at around 12 000,00 CHF per average construction site.
  • Missing compliance documentation: Inability to produce permits during an inspection halts the crews' work, resulting in downtime costs of around 3 200,00 CHF per day of stoppage.

Illustrative practical cases (typical scenarios on Swiss construction sites)

The figures presented in the scenarios below are illustrative examples intended to guide operational implementation.

Scenario 1: Major renovation of an apartment building in the canton of Vaud
A masonry firm with 18 employees works on a six-storey construction site in Lausanne. Managing over 400 technical and administrative documents, the site manager rolls out the PDF charter. He sets up the folder structure 2026_018_LAUSANNE_CFC211_REGIE-BOIS and logs all site minutes under folder 05. This choice allows the foreman to access rebar details directly in the field. When unexpected piping issues arise, the signed addendum is scanned and saved into subfolder 06 in less than ten minutes, ensuring the claim is included in the monthly progress payment.

Scenario 2: Construction of three terraced houses in the canton of Fribourg
An 8-person finishing work contractor handles plastering and painting in Bulle. By applying the opening checklist as soon as the contract award is received, the technical assistant identifies that safety data sheets for the renders have not yet been approved. The documents required by CFST directive 6508 are filed in folder 03 before operations actually start. The standardised folder tree prevents the use of unapproved variants and safeguards the firm's profit margin against client demands.

Frequently asked questions

How should tablet access to site files be structured for foremen?

Assign restricted, read-only access to the execution directory. Itemised quotes, protocols, and safety data sheets remain accessible in the field, preventing accidental handling errors and protecting the firm's sensitive contractual data.

What does poor document organisation cost an SME?

For ten employees, searching for records often causes an administrative loss estimated at around 420.00 CHF per week. This non-productive time directly cuts into operating margins and delays statement submissions to the fiduciary accounting firm.

Where should safety records be filed under CFST directive 6508?

File workstation instructions and inspection reports in the dedicated occupational health and safety subfolder. This orderly structure makes it possible to present compliant documents immediately during an inspection by SUVA or the cantonal labour inspectorate.

Should a full version history of revised drawings be kept?

Yes. The site management updates drawings regularly. Archive each previous revision in a specific, dated subfolder to avoid executing outdated details on the construction site, which leads to very costly rework.

How long must the register of closed construction sites be archived?

Retain the complete register and contractual correspondence under the Code of Obligations (CO) for ten years. This rigorous traceability protects the contractor in the event of late claims relating to the warranty for defects of the completed building structure.

Document standardisation and company management

A clear naming convention eliminates wasted time on site and secures communication with the site management. For detailed take-offs and tender pricing, explore our dedicated section on /soumissions/. Joint inspection records under standard SIA 118 are handled on /portail/, while collective agreement wage grids are covered on /jobs/. For technical drafting under standard SIA 400, refer to /plans/.