The 3 Major Site Risks
- Financial / Margin: Tool loss, duplicate purchases, and unscheduled trips cost roughly 12 000,00 CHF per vehicle every year, according to internal estimates.
- Legal / Joint Body / SUVA: Breach of the prevention duty set out in art. 82 LAA when transporting unsecured heavy tools, exposed to SUVA inspections.
- Administrative / Acceptance: Installation delays stalling intermediate deadlines and risking contractual penalties under art. 160 CO during work handovers.
This PDF document standardises the interior fit-out of utility vehicles and depots for firms across French-speaking Switzerland with five to fifty staff. Designed for team leaders and site managers, it formalises consumable inventories, machine securing, and weekly sorting. Applying it cuts unplanned trips to suppliers and protects productive work hours without creating administrative burdens.
Using this checklist takes fifteen timed minutes per two-person crew every Friday afternoon. It locks in minimum stocking levels before Monday morning departures, flags premature wear and tear, and prevents manual handling accidents. This protocol structures logistics between the central store and construction sites without blurring workshop responsibilities.
Receive this document by email
Enter your email address: the document will be sent to you immediately. Your data will not be shared with third parties.
Operational structure of the PDF template
The "5S Van — poster and weekly loss control" document comes as a two-page A4 PDF file, designed to be laminated on the vehicle's interior bulkhead and archived in the workshop binder. Completed by the team leader and their partner every Friday at the end of the day, it structures the inspection around four clear operational sections:
- The 5S for the van: a visual protocol broken down into sort, set in order, shine, standardise, and sustain, tailored to the confined space of a construction van.
- Standard kit (to be completed by trade): a fixed inventory grid listing power tools, personal protective equipment, and trade-critical consumables.
- Friday weekly check (15 minutes): a quick tally sheet to verify machine conditions, buffer stock levels, and cab cleanliness before the weekend.
- Estimating losses due to disorganisation: an evaluation table putting figures on time wasted searching for gear, unscheduled trips, and emergency re-purchases.
Detailed section-by-section guide
Deploying the document matches the weekly rotation cycle of assembly or finishing work crews:
1. The 5S for the van
This section sets down physical layout rules. The crew starts by getting rid of anything not needed for the coming week: rubble, empty packaging, offcuts of cable, or scrap pipe. Every remaining machine is assigned a clearly marked spot. Tie-down straps and load bars are checked to ensure heavy cases stay firmly against the partition bulkhead, in line with road accident prevention rules and the general requirements of the ordinance on occupational safety and health protection in construction work (OTConst).
2. Standard kit (to be completed by trade)
The team leader fills in the list of essential items needed to start a job without stopping by the central store. For an electrician or plumber, the grid sets baseline stock quantities: junction boxes, press fittings, common screws, sealant cartridges, and wire spools. The columns specify component names, minimum quantities required, and drawer locations.
3. Friday weekly check (15 minutes)
At 16:30 on Friday, the two-person crew spends fifteen minutes reviewing the vehicle. The tradesperson ticks off the condition of every power tool (rotary hammer, angle grinder, drill driver), checks battery charges, and flags dull blades or bits that need sharpening. Personal protective equipment (hard hats, safety glasses, hearing protection) is inspected and topped up as needed, in accordance with SUVA occupational safety directives.
4. Estimating losses due to disorganisation
The supervisor notes discrepancies observed during the past week: number of unscheduled runs to a local merchant, hours lost searching for fasteners on the construction site, and missing tools. This data puts clear figures on the cost of internal logistics hiccups.
Comparison table: vehicle management practices
The following table shows common organisation pitfalls alongside the method recommended by this standardisation process:
| Risky wording / frequent mistake | Compliant formulation or practice | Why |
|---|---|---|
| "Restock only when the drawer is empty" | Set a minimum reorder point per clearly marked bin | Avoids running out of parts on the construction site and making unplanned morning runs to the supplier. |
| "Drop the grinder right onto the floor" | Keep tools secured in racks using certified lashing straps | Prevents equipment damage and stops heavy items from flying forward under sudden braking. |
| "Clean out the vehicle once a month" | Fifteen-minute weekly review blocked out every Friday at 16:30 | Keeps the vehicle consistently clean and stops bulky waste from piling up. |
| "Buy another set of drill bits to get by" | Cross-check inventory with the depot before buying outside | Eliminates duplicate tools sitting idle across several vans. |
| "Leave dirty PPE loose in the cab" | Dedicated storage for hard hats and masks, paired with wear checks | Ensures usable, compliant equipment is always ready, in line with SUVA rules. |
| "Jot missing items down on a scrap of cardboard" | Standardised check-off directly on the posted PDF checklist | Allows the storekeeper to prepare restocks without part number errors. |
Direct errors and avoided losses on the ground
Lacking a standardised protocol creates recurring hidden costs for trade SMEs:
- Unscheduled runs to the merchant: a 45-minute unplanned round trip for two workers costs roughly 160,00 CHF in lost productivity per run. Three runs a week add up to around 1 920,00 CHF a month for a single vehicle.
- Buying duplicate power tools: buying a second core drill or laser level because the first one is buried under tarpaulins means an unnecessary expense of roughly 650,00 CHF to 1 400,00 CHF.
- Breakages from unsecured loads: an industrial vacuum cleaner or crate of fittings falling over in transit causes damage averaging around 350,00 CHF per incident.
To calculate overall margins and draft contract prices for tenders based on standardised item catalogues, companies rely on dedicated tender management modules.
Illustrative practical cases (typical scenarios on Swiss construction sites)
The figures and scenarios below are realistic examples to help you assess the impact of this inspection sheet:
Typical scenario: Plumbing & Sanitary Installations and Sheet-metal Work firm (Canton of Vaud)
A Vaud SME with twelve employees working on a residential refurbishment in Morges notices repeated installation delays on Tuesday mornings. Checking work orders reveals that installers often drive back to the Écublens warehouse for missing copper elbows and sealant cartridges.
The managing director puts the PDF checklist in all four company vans. Each pair runs the weekly inspection on Friday at 16:45 sharp. The standard kit fixes the exact quantities of standard fittings, while the Friday tally sheet triggers a consolidated order for the warehouseman for Monday at 07:00. After eight weeks, unplanned trips drop from five to zero per month, protecting an estimated direct labour margin of roughly 1 200,00 CHF per van.
Frequently asked questions
Who should carry out the van inspection on Friday?
The team leader or lead installer runs this 15-minute operational check. The employer ensures it takes place in line with the federal accident insurance act, avoiding material losses of around 450,00 CHF a month.
How do you integrate vehicle organisation into the MSST system?
The 5S checklist formalises the load-securing and hygiene rules required under directive CFST 6508. Stored inventory sheets prevent flying-tool hazards and make your internal shop floor logistics dependable.
What should be done with leftover materials and offcuts returned to the depot?
Recovered consumables go straight into designated bins following the internal sorting protocol. Custom items that cannot be reused are disposed of, preventing clutter worth over 1 200,00 CHF in dead stock.
Does vehicle inspection time count as working hours?
Yes, this quarter of an hour of inventory is an integral part of paid professional duties under the Labour Act. The task is carried out during working hours before closing the working week.
Where should material pricing and installation disputes be handled?
Calculating unit prices is handled through our tenders tools. Formal site acceptance records fall under the portal in accordance with SIA 118, while hiring relies on collective labour agreement workflows.
Standardising utility van and depot storage transforms the daily profitability of a Swiss trade contractor. By cutting out unexpected supply runs and duplicate hardware purchases, every crew protects project margins and improves operational safety. To build on this approach, strengthen your workshop processes, and measure productivity gains across your firm, explore these practical resources: