🧱 CFC 238Patch racks, power supply and earthingChapter 8 of 10 in the section

Surges on data: outgoing links, surge arresters, and common earth

This chapter guides you through the treatment of communication links crossing the boundaries of a building. You will learn how to identify breakdown risks on through copper cables, size and connect data surge arresters at rack entry, and specify all-dielectric fibre-optic cables to guarantee total galvanic isolation between two distinct sites.

Key takeaways

  • Any outdoor copper link exposes active equipment to destructive surges through inductive coupling or potential differences.
  • Replacing copper with dielectric fibre optics permanently eliminates inter-building surge transfers.
  • Surge arrester cartridges for twisted pairs must be connected as close as possible to the cable entry point.
  • Rack equipotential bonding requires a short earthing conductor connected directly to the technical room's main earthing bar.

Inter-building copper link: lightning strike mechanism and protection at rack entry

As soon as a cable with metallic conductors links two distinct structures, it creates an unintentional bridge between two independent earth electrodes. During a lightning strike on one of the buildings or a direct strike to the surrounding ground, the shockwave generates a sudden rise in local ground potential. The current then seeks to balance out towards the second building: the cable screen and its internal conductors become the preferential discharge path. This equalisation current passes directly through Ethernet switches, KNX controllers, or intercom equipment, pulverising line input stages (differential stages, isolation transformers, and PHY chips).

Earth potential difference (ground potential rise)
Extremely high transient voltage, potentially reaching several tens of kilovolts, measured between two distant earth electrodes during the discharge of a lightning current into the ground.

On an existing copper infrastructure that cannot be decommissioned, installing a barrier of low-current surge arresters immediately at the entry to the patch rack constitutes the sole defence. The disconnecting components must absorb the surge energy without degrading the bandwidth required for the link category.

Selecting surge protection according to the type of outdoor copper link
Signal typeSurge arrester technologyContinuity requirement
Gigabit Ethernet / Cat 6AGas discharge tube combined with fast bidirectional diodesMaintaining 100-ohm differential impedance and PoE+ support
Building automation bus (e.g. KNX, RS-485)Fine 2- or 4-wire protection with peak voltage limitationResidual voltage below transceiver withstand threshold
Analogue telephony / DSLPlug-in modular unit for LSA-PLUS type disconnection stripCommon-mode discharge with three-pole gas discharge tube
  1. Physical location point of the surge arresterInstall the protective cartridges immediately after the cable enters through the external wall or at the head of the first 19-inch patch panel, without routing the unprotected cable across the server room.
  2. Diversion to reference earthConnect the earthing terminal of the surge arrester to the rack earthing bar using a tinned copper flat braid or a conductor with a minimum cross-section of 6 mm², routed taut and never exceeding 30 cm in length.
  3. Screen connectionBond the copper cable screen via a 360-degree earthing clamp onto the dedicated terminal block of the protection module, ensuring no impedance mismatch.

Replacement with an optical link and implementation of rack equipotential bonding

To radically eliminate any risk of flashover or fire caused by an inter-building surge, accepted practice requires replacing copper links with fibre-optic cables. As glass is a perfect electrical insulator, no transient wave can travel from one building to the other via the communication channel. To achieve flawless galvanic isolation, the optical cable must be free of any conductive components. Metallic armatures made of corrugated steel or conductive tape must be excluded, or reinforcements made of fibre-reinforced plastic (FRP/GRP) should be selected instead.

If an outdoor cable with metallic armoured sheathing for rodent protection is nonetheless deployed, its armouring must imperatively be connected to earth at the building entry point before entering the rack, or interrupted in a waterproof external junction box so that only the sealed dielectric tubes containing the optical fibres enter the rack.

In the patch rack, the common earth constitutes the last line of defence. All passive components must form a homogeneous equipotential cage to direct electrostatic and residual charges to the network room's main earthing bar.

  • Fit a vertical or horizontal copper equipotential bonding bar screwed directly onto the bare framework of the 19-inch rack.
  • Bond the vertical uprights, doors, and removable side panels using flexible tinned copper earthing braids.
  • Discharge the rack bar to the main telecom earthing bar (BTE) with a mechanically protected multi-strand copper green/yellow conductor.
  • Systematically scrape the powder-coated paint off at the contact surfaces of serrated washers and cage nuts to ensure flawless metal-to-metal contact.

Connecting data surge arresters and rack earthing mesh

The effectiveness of a data surge arrester at the rack head depends exclusively on the impedance of its discharge path to the reference earth. During an indirect lightning strike or an earth potential rise between two buildings connected by copper, the wavefront exhibits an extremely steep rise time, on the order of a microsecond. At these transient frequencies, the slightest parasitic inductance from an excessively long or bent conductor generates a destructive residual surge for Ethernet interfaces, network switches, or PLC motherboards.

To maintain an effective protection level consistent with the ratings of the semiconductor components through which the signal passes, the modular surge arrester for twisted pairs must be mounted directly onto a dedicated metallic DIN rail, which is itself connected to the rack's main equipotential bonding bar via an extra-flexible tinned copper braid. Vertical insulated conductors of 16 mm² stranded copper must not contain any sharp bends or slack coils. The minimum bending radius must remain greater than 100 mm to channel the surge wave without side flashover.

Implementation criteria for low-voltage data surge arrester modules
Signal typeDischarge technologyResidual clamping levelEarth connection method
Gigabit Ethernet (PoE / PoE+)Combined stage: gas discharge tube + bidirectional suppression diodesLess than 60 V wire-to-wire, less than 600 V wire-to-earthMetallic chassis clipped onto DIN rail bonded to the rack bar
Building automation bus (shielded pairs)Fast clamping diodes (TVS) with decoupling chokesLess than 45 V peak in common modeShort earthing braid with a cross-section of 6 mm² or greater
Analogue loop or serial linkThree-pole gas discharge tube and metal oxide varistorsAdjusted to nominal operating voltage (12 V to 48 V)Local copper earthing strip without loop connection

Total galvanic isolation: installing dielectric optical links

When geometric separation, the absence of foundation interconnection, or the potential difference between two structures cannot guarantee absolute equipotentiality, completely eliminating the metallic medium remains the only definitive countermeasure. Replacing a copper riser or inter-building link with a fibre-optic patch lead or cable containing no conductive elements eliminates all galvanic coupling, removing the need for data surge arresters at rack entry.

  1. Selecting an all-dielectric armoured cableSelect a loose-tube outdoor cable whose rodent protection is provided by water-blocking glass yarns and a polyethylene sheath, without any steel tape or metallic strength member.
  2. Entry into the technical room and breakoutBring the outer sheath into the patch cabinet via a waterproof cable gland. Terminate the dielectric strength member on the optical breakout tray bracket without connecting it to any earthing terminal.
  3. Optoelectronic connection to active chassisSplice the single-mode or multi-mode fibres onto pre-connectorised pigtails, coil them in the splice cassette, then insert the locally powered SFP transceiver modules or media converters.
  4. Shield isolation conformity inspectionIn the residual scenario where an optical cable with metallic armouring must be used, the steel armouring must imperatively be connected to earth at one end of the run only, or severed at an insulated external junction box to prevent any inter-building earth loop.

For building management or building automation field buses linking distinct pavilions, using gateways and repeaters with integrated optocoupled galvanic isolation physically segments the communication circuits. These devices create a dielectric isolation barrier withstanding several kilovolts between input and output segments, preventing the destructive propagation of a lightning strike affecting the adjacent building towards the core of the main data network.

Procedure in the event of link breakdown and transition to optical isolation

When a storm front destroys switch ports or damages surge cartridges at rack entry, the technician must isolate the physical cause before replacing any network equipment. The presence of an inter-building copper link subjected to a sharp ground potential rise generates destructive circulating currents in the screens and on the twisted pairs. The intervention begins with the complete physical disconnection of RJ45 patch leads and bus conductors linking the two remote structures, in order to preserve all active equipment that remains operational in the distribution frames.

  1. Diagnostics of cartridges and protection componentsVisually inspect the condition of the surge arrester modules installed on the patch panel or on the rack DIN rail. A mechanical indicator that has turned red or a break in ohmic continuity indicates the discharge of a major surge to earth. Destroyed modular surge arrester cartridges must be replaced before considering repowering the connected terminal equipment.
  2. Measurement of screen and equipotential currentsUsing a current clamp meter, measure the permanent residual current flowing through the screen of the inter-building copper cable. If a DC or AC voltage is detected between the metallic chassis of the rack and the disconnected screen, a critical potential difference remains between the earthing systems of the two structures.
  3. Definitive isolation and temporary optical connectionPhysically isolate and lock out the faulty copper connectors. Pull a pre-connectorised optical link immune to electromagnetic interference through a spare conduit, then connect media converters or optical SFP transceiver modules directly to the switches to restore network communication without galvanic continuity.

When the client hesitates to replace a damaged copper bundle with a fibre-optic backbone, the contractor notifies them of the technical risks in writing, in accordance with accepted practice and the Code of Obligations (CO). Retaining outdoor copper cables constitutes a permanent structural vulnerability to repeated atmospheric disturbances, which no data surge arrester can completely neutralise during a direct lightning strike on the site. Laying an all-dielectric fibre-optic cable permanently eliminates common earth failures.

Frequently asked questions

How do you test the operational condition of a data surge arrester after a storm event?

Surge arrester cartridges for data networks generally incorporate a mechanical status indicator that turns red when the clamping component is destroyed. For modules without an indicator, testing is carried out de-energised with a multimeter: the resistance between active conductor and earth terminal must be infinite. If the component shows a short circuit or abnormal impedance, the module has diverted an excessive surge and must be replaced without delay.

Why is it prohibited to leave the screen of an inter-building network cable floating?

Disconnecting the screen at one end removes the 50-hertz loop current, but leaves a dangerous electrostatic potential floating along the link. In the event of a nearby lightning strike, the shockwave creates a potential difference of several thousand volts between the floating screen and the rack earth. An electric arc then flashes over to neighbouring electronic components, causing a distribution frame fire or destroying the connected active equipment.

What type of optical cable should be laid outdoors to ensure total immunity?

Only all-dielectric fibre-optic cables should be installed, completely free of any steel armouring or metallic rodent protection tape. Cables with rodent protection based on glass yarns or non-conductive armouring made of glass-fibre reinforced plastic must be selected. These cables eliminate any risk of propagating a lightning surge or introducing an earth loop between the two connected buildings.

What conductor cross-section should be used to connect the rack earth bar to the equipotential bonding network?

The IT rack earthing bar must be connected to the main equipotential bonding conductor with a green/yellow copper cable having a minimum cross-section of 16 square millimetres. This conductor must be as straight and short as possible to minimise the self-inductance of the cable under steep-front discharge currents. This link ensures direct discharge of the surge currents diverted by the data surge arresters towards the building earth electrode.