Interior doors: installation, clearances and adjustment: the execution reference
For joinery team leaders and foremen, this section brings together the methods for installing and adjusting hinged and sliding interior doors. The technical objective is to ensure smooth closing from the first installation and to keep perimeter clearances even after the building heating is switched on. You will find the plumb tolerances, opening checks, humidity constraints and hardware adjustments that meet Swiss professional requirements.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
3 to 4 mm
Usual perimeter clearance in the rebate between the leaf edge and the frame
5 to 7 mm
Minimum gap under the leaf above the finished floor without mechanical ventilation
47 N
Maximum recommended manual force to operate an accessible door
2 mm/m
Maximum out-of-plumb tolerance permitted for installing a frame
Technical scope of the joiner and limits of intervention
The interior joiner's field (CFC 273) begins on receipt of the masonry opening or dry-wall framing and ends on handover of the adjusted and protected work. This section deals exclusively with communicating door sets, partition leaves and solid or glazed interior doors mounted on frames, door linings or sub-frames. All geometric requirements, operating clearances and permissible deformations are based on SIA 343, which defines the usual tolerances between the leaf and its frame.
On the construction site, the joiner's responsibility is directly engaged when they accept a substrate without a written reservation. Under art. 365 CO, the contractor must notify the client without delay of any circumstance jeopardising the proper execution of the work, in particular structural work outside tolerance or an out-of-plumb partition that would prevent the frame from being aligned without breaking the plane of the leaf.
- Operating clearance
- Free gap measured between the edge of a leaf and the rebate bottom or the finished floor, ensuring freedom of rotation and passage of the hardware without friction under climatic variations.
Progression method on the construction site and chapter logic
To ensure that a door works perfectly first time without repeated call-backs after occupancy, the work follows a rigorous logical sequence, reflected in our ten technical chapters.
- Phase 1: Preliminary check and rough installationEverything starts with the visible geometry and nominal gaps (chapter 1), which require careful checking of the structural opening, the level line and the plumb of the openings before any plugging (chapter 2). For pocket sliding systems (chapter 4), the cassette must be integrated into the dry-wall partition before the cladding is fitted, to avoid any later rubbing of the panel.
- Phase 2: Mechanical adjustment and rotating componentsOnce the frame is wedged and fixed, three-axis adjustment on concealed hinges or screw-in pivots (chapter 3) balances the perimeter clearances and ensures even compression of the acoustic seal. The right choice of hardware, faceplate and lock cases (chapter 5) then ensures smooth latching without slamming. Adding an overhead or concealed door closer (chapter 6) requires fine adjustment of the spring force to combine full closing with easy passage for people with reduced mobility.
- Phase 3: Specific environments, stability and acceptanceThe humidity loads in wet rooms require perfect sealing of the cut lower edges to prevent fibre swelling (chapter 7). Full-height leaves from floor to ceiling (chapter 8) require a stabilised core with integrated stiffeners to neutralise warping during the heating season. Finally, preserving the finishes with rigid protection against construction-site impacts (chapter 9) and the precise fitting of a new panel in a deformed old frame (chapter 10) complete the installation task before the acceptance report drawn up in accordance with SIA 118.
This sequence gives the site manager a robust, durable and stable result, able to absorb thermal cycles between the dry winter and the humid summer without mechanical binding.
📘 Chapters in this section 10
Door clearances: perimeter, bottom of leaf and visible consistency
Control the perimeter gaps in the rebate to avoid mechanical friction and air leaks.
Interior doors: installation, clearances and adjustmentAccepting the opening: dimensions, plumb, squareness and reasoned refusal
Check the level line and formally reject a non-compliant opening before any fixing.
Interior doors: installation, clearances and adjustmentAdjusting in three axes: height, lateral and gasket pressure, and a door leaf that will not stay put
Correct the alignment in height, depth and overlap for even compression on every joint.
Interior doors: installation, clearances and adjustmentPocket sliding door: frame in the partition, level of the rail and door that rubs
Install a square cassette to permanently eliminate hidden friction in the double partition.
Interior doors: installation, clearances and adjustmentDoor hardware: lock, cylinder, lever handle, and how use dictates the choice
Combine strike plate, magnetic lock and cylinder to ensure soft latching without rattle play.
Interior doors: installation, clearances and adjustmentThe door closer: closing force, opening effort and accessibility
Balance the push force and closing speed to reconcile accessibility and automatic latching.
Interior doors: installation, clearances and adjustmentMoisture attacks the bottom: bathroom door, lower edge and swelling core
Durably protect the cut lower edge against rising water and edge-banding detachment.
Interior doors: installation, clearances and adjustmentExtra-tall doors: warping, stabilised core and number of hinges
Adjust the integrated tie rods and size the hinges to keep a slender leaf perfectly straight.
Interior doors: installation, clearances and adjustmentProtect until handover: film, corners, doors used as thoroughfares
Fit impact-resistant sleeves to preserve the lacquers until final delivery.
Interior doors: installation, clearances and adjustmentReplacement in existing buildings: surveying the frame, a distorted frame and a made-to-measure leaf
Record the out-of-square condition of an old frame and plane to size with a constant clearance.
