Fibre optics: preparation, splicing and termination: the execution standard
Intended for site foremen, foremen and CFC telematics technicians, this section details the precision operations for preparing, splicing and terminating fibre optics in Swiss buildings. From core-to-core alignment to riser management, it addresses the technical practice, safety regarding invisible radiation, and optical acceptance testing requirements according to the ISO/IEC 11801 standard and Swisscom guidelines.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
0.1 dB
Maximum permissible insertion loss per fusion splice in a single-mode link
30 mm
Standard minimum bend radius of a G.652.D single-mode fibre coiled in a cassette
15 mm
Minimum permissible bend radius for a bend-insensitive G.657.A single-mode fibre
0.75 dB
Maximum permissible insertion loss for a mated pair of connectors
Scope of application and operational boundaries on the construction site
The CFC telematics technician and network electrician trades focus on the passive infrastructure and the transmission of the optical signal within the built property. Mastering fusion splicing requires absolute rigor during the stripping of primary coatings, cleaving of the silica, and handling of ceramic ferrules. This section covers all operations required to ensure optical continuity from the service entrance to the telecommunications outlet, guaranteeing minimal attenuation and reflectance in compliance with the requirements of the ISO/IEC 11801 standard.
- What we cover: preparation of internal distribution and drop cables, coiling in optical patch panel splice cassettes, electric arc fusion splicing, cleaning of through-adapters and ferrules, as well as testing by optical time-domain reflectometry (OTDR) or photometry.
- What is excluded: heavy current power supply infrastructure for technical rooms (CFC 232), connections to HVAC control loops (CFC 241 and CFC 244), and blowing micro-cables on the public domain under direct mandate from a telecommunications operator.
- Fire-stop penetrations: sealing at the crossing of floor slabs and fire walls is the installer's responsibility for closing their own openings, in accordance with the fire protection requirements of the VKF.
Handling silica strands with a diameter of 125 micrometres requires strict application of the general prevention rules defined in art. 82 LAA. Exposure to invisible optical sources and the ingestion or dermal penetration of glass shards constitute the two major risks of the activity. Construction site rules impose methodical organisation of the splicing workbench, systematic use of cleave residue containers, and wearing suitable personal protective equipment.
Execution method and chapter structure
Training and implementation on the construction site must follow a logical progression, from the selection of physical components through to emergency maintenance during operation. The ten chapters in this section are structured to guide the site manager and site foreman step by step, preventing alignment errors or acceptance non-conformities.
- 1. Technological selection and fundamental safety (I2-01 to I2-04)First differentiate between single-mode and multi-mode fibres according to distance constraints and transmitter power budgets. Next master the critical cleaving step and the recovery of silica waste. Carry out fusion splicing while understanding the discrepancy between the loss estimated by the splicer's camera and the actual measured loss. Immediately neutralise the hazard of Class 3 and Class 4 lasers travelling on live networks.
- 2. Termination, cleanliness and mechanical management (I2-05 to I2-07)Apply the visual inspection and dry or wet cleaning method on ferrules before any mating. Organise splice cassettes to strictly observe bend radii without introducing mechanical stress. Select external-to-internal transition cables compatible with the removal of water-blocking gel and the reaction-to-fire classes required in service shafts.
- 3. Vertical deployment, acceptance testing and troubleshooting (I2-08 to I2-10)Establish the boundaries of responsibility at the building entry point (BEP) and the OTO outlet according to Swisscom guidelines. Pull the building riser in an occupied environment while managing apartment access and vertical penetrations. Pinpoint a beam break with a reflectometer and repair it while on call, proving the compliance of the recommissioning.
In accordance with the contractor's duties set out in art. 364 CO, the installer is liable for sound workmanship in accordance with recognised technical rules. In fibre optics, a pinched bend radius inside a patch panel or a trace of sebum on a connector does not always prevent the link from establishing immediately, but leads to frame errors and premature degradation as soon as the building temperature fluctuates.
📘 Chapters in this section 10
Single-mode or multimode: reach, active optics and real price
Avoid the financial trap of SFP modules by selecting the right glass type from the outset.
Optical fibre: preparation, splicing and terminationCleaving without puncturing: collecting silica shards and eye protection
Protect your eyes and fingers from invisible glass splinters during every preparation step.
Optical fibre: preparation, splicing and terminationSplicing a fibre: alignment, estimated loss and actual loss
Distinguish the estimated attenuation displayed by the splicer from the actual loss verified with an OTDR.
Optical fibre: preparation, splicing and terminationNever look into a fibre: class 3 and 4 lasers on construction sites
Prevent irreversible retinal burns caused by invisible optical sources in operation.
Optical fibre: preparation, splicing and terminationDust costs decibels: cleaning and inspecting a ferrule
Eliminate needlessly lost decibels by inspecting each ferrule before any mating.
Optical fibre: preparation, splicing and terminationAccommodating the reserve: coiling in trays, bending radius and stress
Organise your splice cassettes without pinching strands to ensure signal longevity.
Optical fibre: preparation, splicing and terminationFrom outside to inside: sheath, filling gel and fire performance
Manage the transition from outdoor water-blocking gel to fire-safety-compliant indoor risers.
Optical fibre: preparation, splicing and terminationWhere our work ends: building entry point and boundaries with the operator
Clarify the exact contractual boundary between the network operator and your indoor installation.
Optical fibre: preparation, splicing and terminationAscending in an occupied building: riser, service shafts and access to dwellings
Install your building riser in an occupied building without blocking conduits or disturbing tenants.
Optical fibre: preparation, splicing and terminationSevered live fibre: locate, repair, prove
Precisely locate the fibre break with an OTDR and restore continuity under client pressure.
