Skip to content
Website
🧱 CFC 214Section 1 of 610 chapters

Timber as a load-bearing material: species, classes and moisture: execution guide

This section is intended for foremen, chargehands and site managers in timber framing in Switzerland. It brings together the key criteria for inspecting and accepting load-bearing timber as soon as it is unloaded: rigorous measurement of residual moisture, decoding of strength marking, identification of unacceptable defects, compliance with service classes and storage conditions on the construction site complying with the requirements of standards SIA 265 and SIA 265/1.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

norme SIA 265

12 %

Reference equilibrium moisture content in service class 1

norme SIA 265/1

20 %

Critical moisture threshold promoting fungal growth

norme SIA 265

150 mm

Minimum ground clearance for ventilated blocking of timber stacks

norme SIA 265

0.7 mm/min

Nominal charring rate assumed for softwoods

Technical scope of the load-bearing material and responsibilities upon acceptance

The acceptance of framing and structural timber represents the first critical milestone in the structural safety of a building. The carpenter accepts responsibility as soon as the packages are taken over on the construction site. According to art. 365 CO, the contractor is liable for the material provided and must notify without delay any defect that jeopardises the structure. The requirements of standards SIA 265 and SIA 265/1 require verification of the mechanical, geometric and moisture compliance of the timber before any lifting or final assembly operations.

Mandatory visual and instrumental inspections during unloading
Parameter checkedTool or verification methodUsual conformity criterion
Core residual moistureCalibrated moisture meter with insulated pinsStrict match with the defined service class
CE marking or certificate of conformityVisual examination of package stamps and labelsMinimum class C24 or GL24h according to the design
Cracking and waneSteel rule, inspection of the central thirdNo exceeding of split size tolerances
Flatness and storage deflectionSpirit level, line and packer shimsContinuous blocking 15 cm above the ground without residual camber

A batch of timber with unsuitable moisture or excessive natural defects leads to irreversible deformations once the walls are closed. The scrupulous application of standard SIA 265 prevents differential framing settlement, shearing of connections due to restrained shrinkage and serious disputes linked to structural glue debonding.

Learning pathway and operational logic of the chapters

The sequence of the ten chapters follows the chronological and technical order encountered in the field: from the arrival of the lorry to accounting for fire scenarios, through physical grading and material physics. This pragmatic approach equips the practitioner with the benchmarks required to decide on a delivery refusal in the presence of the driver or carrier.

  1. Phase 1: Immediate physical inspection on the dockChapters B1-01 to B1-03 detail measuring residual moisture with a pin moisture meter, reading strength stamps according to standard SIA 265 and searching for delamination on glued laminated timber.
  2. Phase 2: Preservation and quality sorting on siteChapters B1-04 and B1-05 establish the rules for ventilated stacking to prevent rot under impermeable tarpaulins and define the permissible geometric limits for knots, splits and wane.
  3. Phase 3: Integration into the indoor and outdoor environmentChapters B1-06 to B1-08 link the equilibrium moisture content of the structure to the service classes, determine the need for preservation treatment versus design detailing and quantify volumetric shrinkage.
  4. Phase 4: Wood-based components and accidental situationsChapters B1-09 and B1-10 clarify the selection of wood-based panels for bracing and explain the calculation of the residual load-bearing section under the effect of fire charring according to applicable standards.

📘 Chapters in this section 10

Timber as a load-bearing material: species, grades and moisture

Residual moisture of timber: measure it upon receipt and reject timber that is too wet

Master insulated pin measurement to refuse timber that is too green immediately.

Timber as a load-bearing material: species, grades and moisture

Strength grading: what the marking on a beam says and what it entails

Decode strength stamps to guarantee the load-bearing capacity specified by the engineer.

Timber as a load-bearing material: species, grades and moisture

Glulam: what to check at unloading and what causes downgrading

Spot lamella debonding and grain splits as soon as the load leaves the crane.

Timber as a load-bearing material: species, grades and moisture

Storing timber on site: blocking, ventilation, and sheeting that does not trap water

Ban impermeable tarpaulins that turn your timber stacks into destructive steaming ovens.

Timber as a load-bearing material: species, grades and moisture

Knots, splits, and wanes: permissible defects and those that cause timber rejection

Distinguish permissible seasoning checks from structural defects requiring rejection.

Timber as a load-bearing material: species, grades and moisture

Service Class: Adapting Timber to the Ambient Moisture of the Structure

Anticipate equilibrium moisture content to prevent swelling and jamming during finishing work.

Timber as a load-bearing material: species, grades and moisture

Preservative treatment: when it is needed and when design suffices

Prioritise construction detailing to eliminate superfluous and costly chemical treatments.

Timber as a load-bearing material: species, grades and moisture

Shrinkage and swelling: allowing for clearance in all three grain directions

Calculate shrinkage clearances accurately to maintain the alignment of bolted connections.

Timber as a load-bearing material: species, grades and moisture

Wood-based panels: OSB, plywood and solid wood panel, which for which use

Select the appropriate panel based on its actual structural shear wall or diaphragm capacities.

Timber as a load-bearing material: species, grades and moisture

Timber in fire: charring rate and load-bearing residual cross-section

Size the residual load-bearing section to ensure the mechanical resistance required in fire conditions.