Heat demand and sizing of the heat generation: the execution reference
This section is aimed at heating installers, team leaders and site foremen who deal with the sizing of heat generation. It provides concrete methods for calculating the actual heat losses without an arbitrary safety margin, including domestic hot water loads, meeting the cantonal requirements derived from the MoPEC and selecting the right hydraulic regime to avoid premature compressor wear and drifting energy consumption.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
-8 to -12
Average outdoor design temperature on the Swiss Plateau
35
Maximum flow temperature for a standard underfloor heating network
12
Recommended minimum water volume for a variable-speed heat pump
10
Minimum share of renewable energy often required on replacement
Technical scope of sizing and construction site interfaces
Sizing a heat generation system is the founding technical act of the heating installer under CFC 241. Determining the required output does not mean copying the rating plate of an old boiler or stacking up reserve factors as a precaution. The aim is to match the installed output strictly to the actual heat losses of the building envelope and the actual reheating needs, calculated in accordance with the provisions of SIA 384/1.
The calculation covers domestic hot water solely in terms of its heat exchange output or storage volume, without encroaching on the sizing of the sanitary distribution loops or the taps and fittings, which fall under the CFC 250 trade. Likewise, the air-handling aspects of air treatment installations belong to CFC 244, and fine control via field bus to the CFC 238 electrical installers.
| Component or service | Responsible trade | CFC 241 scope limit |
|---|---|---|
| Heat generator and buffer tank | CFC 241 (Heating) | Supply, hydraulic connection and thermal commissioning |
| Power supply and isolation | CFC 232 (Electrical) | Connection to the terminals of the generator control cabinet |
| Drinking water circuit and DHW recirculation | CFC 250 (Sanitary) | Connection to the flanges or primary sockets of the sanitary heat exchanger |
| Combustion air supply and forced ventilation | CFC 244 (Ventilation) / CFC 241 | Sizing of free cross-sections according to the VKF/AEAI fire safety directives |
| Floor heat-up protocol | CFC 241 (control) / CFC 281 (screed) | Management of the water temperature steps, with no responsibility for the drying of the mass |
Contractually and legally, the contractor remains responsible for the works he calculates and installs. Under art. 365 CO, if the input data supplied by the client or the historical consumption records are incomplete or clearly disproportionate, the installer is obliged to inform his principal immediately in order to be relieved of liability in the event of underperformance or a dispute over the seasonal efficiency.
Methodical path: from heat load to real-life operation
The design and execution of a high-performance heating installation require a rigorous sequential approach. The ten chapters of this section detail each operational step, from the theoretical thermal determination to checking the behaviour of the installation during the first months of heating.
- Step 1: Assessment of the fundamental loadsChapters [J1-01] to [J1-04] deal with building physics. Heat losses are calculated according to SIA 384/1, oversizing that causes short cycling is tracked down, operating temperatures are lowered to maximise heat pump efficiency, and domestic hot water preparation is included without overestimating the peak output.
- Step 2: Legal framework and spatial integrationChapters [J1-05] and [J1-06] cover the replacement of installations in accordance with the requirements of the cantonal legislation derived from the Model Energy Provisions of the Cantons (MoPEC). They also define the safety constraints for technical rooms: minimum volumes, air supplies and necessary clearances.
- Step 3: Hydraulic diagram and buffer componentsChapters [J1-07] and [J1-08] address the choice of the bivalence point for heat pumps and the integration of the buffer volume. The aim is to guarantee the minimum flow rates without creating parasitic thermal mixing that would destroy the coefficient of performance of the installation.
- Step 4: Site management and post-commissioning optimisationChapters [J1-09] and [J1-10] complete the practical implementation. Heating is maintained in occupied buildings during the winter construction site, then the heating curves are adjusted on the basis of the heat meters during the first operating season.
Rigour applied from the preliminary design stage avoids common drifts: a buffer tank connected in full decoupling without thinking about flow rates, a boiler output doubled out of habit, or factory settings never corrected. Every technical choice affects the profitability of the installation over more than twenty years.
📘 Chapters in this section 10
Calculating the required output: heat losses, design temperature and heat gains
Determine the exact heat load of the building according to the standard without applying unjustified excess output.
Heat demand and sizing of the heat generationToo big costs more: short cycling, wear and reduced comfort
Find out why an oversized generator destroys its compressor and wastes energy in the mid-season.
Heat demand and sizing of the heat generationChoosing the operating regime: flow temperature, temperature difference and the consequences for everything else
Lower the water temperatures of your networks to multiply the coefficient of performance of the installations.
Heat demand and sizing of the heat generationHot water as a load: reheat capacity, priority and storage cylinder
Manage hot water production by hydraulic priority without doubling the installed heating output.
Heat demand and sizing of the heat generationReplacing a boiler today: cantonal requirements and the file to compile
Master the cantonal energy forms and the mandatory supporting documents to validate your conversion applications.
Heat demand and sizing of the heat generationThe room: volume, air supply, clearances and exit door
Check the combustion air cross-sections, the maintenance distances and the secure access in the boiler room.
Heat demand and sizing of the heat generationBack-up heating: bivalence point, resistance heater hours and winter bill
Calculate the bivalence temperature precisely to limit the switching on of the backup electric heating elements.
Heat demand and sizing of the heat generationThe buffer volume: what it is for, when it is unnecessary, how to connect it
Select the right buffer tank connection to ensure the flow rates without degrading the temperatures.
Heat demand and sizing of the heat generationChanging the heat production in winter: temporary supply, shutdown and tenant information
Install temporary mobile boiler rooms and secure the heat supply to occupants during winter works.
Heat demand and sizing of the heat generationChecking after the event: meters, first-season readings and curve correction
Adjust the control curve slope after the first cold spells using the energy meter readings.