Air requirements, flow rates and sizing: the execution reference

Intended for site foremen, supervisors and ventilation technicians, this section brings together the calculation methods for hygienic and functional air flow rates in housing, commercial buildings and car parks. It sets the parameters for velocity, pressure drop and energy recovery according to SIA 382/1, in order to guarantee a quiet, balanced and economical installation, free of excess flow that penalises operation.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

norme SIA 382/1

30 m³/h

Recommended minimum fresh-air flow rate per occupant in office spaces

norme SIA 382/1

0.7 to 1.0

Reference hourly air change rate for wet rooms in housing

norme SIA 382/1

2 m/s to 3 m/s

Maximum recommended air velocity in terminal ducts to avoid noise

norme SIA 382/1

80 %

Usual minimum heat recovery efficiency required of the balanced mechanical ventilation exchanger

Technical scope of air-flow sizing

Air-flow sizing is the operational foundation of the balanced mechanical ventilation installer's work. Under CFC 244, the trade is involved from the determination of the volume flow rates needed to ensure indoor air quality, protection of the building fabric and acoustic comfort for occupants. This work is based on the requirements of SIA 382/1. The approach consists of setting the hygienic fresh-air volume per occupant or per surface area, determining the extract air from wet or polluted rooms, and then strictly balancing the overall flows to avoid any uncontrolled over-pressure or under-pressure in the airtight envelope.

The responsibility of the fitter and the project manager stops precisely at the boundaries of the other finishing work trades. Assessing the building's overall thermal needs, choosing the generators and sizing the heat pumps fall to the heating engineer (CFC 241). For the ventilation fitter, a pre-heating or post-treatment coil is merely an air-side heat exchanger inserted in the duct, characterised by an air-side pressure drop and a geometric footprint. Likewise, condensate drainage stops at the water seal of the air-handling unit's trap; connection to the waste-water drainage network is the responsibility of the plumber (CFC 250). Bringing the supply cable to the local isolator is the electrician's responsibility (CFC 232), while programming the building management system belongs to the automation specialist (CFC 238).

From a contractual standpoint, the installer checks the consistency between the tender drawings and the actual conditions on the construction site. If the specified flow rates lead to excessive air velocities or to an air-flow imbalance incompatible with the performance of the building, the contractor immediately reports the defect to the site management in accordance with the duty of care defined by the Code of Obligations (CO). Carrying out a poorly calculated network directly engages the company's liability during acceptance measurements.

Reading method and progression of the chapters

The progression through the ten chapters of this section follows the chronological logic of a project, from the definition of the raw requirements to the final regulatory justifications. Learning begins with the basic flow rates for housing (K1-01), where cascade ventilation transfers fresh air from bedrooms and living rooms towards the wet extract rooms. The next chapter (K1-02) details the physical and health consequences of oversizing, demonstrating the value of strictly limiting the volumes of air moved.

  1. Defining requirements according to useChapters K1-01 to K1-04 deal with the assessment of air volumes in housing and commercial buildings. Chapter K1-03 sets out the modulation of office flow rates using carbon dioxide sensors, while chapter K1-04 resolves the delicate integration of kitchen extract hoods so as to preserve the overall air-flow balance.
  2. Air flow and pressure-drop calculationChapter K1-05 provides the method for identifying the most unfavourable branch, summing linear and local pressure drops, and sizing the fans without unnecessary over-pressure. Chapter K1-06 then secures the external positioning of fresh-air intakes and discharges on the roof or facade.
  3. Specific applications and energy constraintsChapters K1-07 to K1-10 address special structures and regulatory constraints: controlled ventilation of underground car parks, pressure control in airtight buildings, routing of networks in major renovation, and justification of the heat recovery efficiency according to SIA 382/1.

To make the best use of this guide, the site foreman will systematically compare the theoretical data with the anemometer and manometer readings taken on site. The compliance of an installation is not judged on paper, but at the balancing damper, the differential pressure across the filters and the sound level as heard by the occupant in each living room.

📘 Chapters in this section 10

Air requirements, flow rates and sizing

How much air per room: living room, bedrooms, kitchen and wet room

Master the fresh-air and extract ratios for each room to balance multi-occupancy housing perfectly.

Air requirements, flow rates and sizing

Too much air is costly: noise, draughts and air that is too dry in winter

Avoid complaints about whistling and dry throats by eliminating excess air flow in winter.

Air requirements, flow rates and sizing

Offices and rooms: airflow per person, variable occupancy and air quality sensor

Adjust the fresh-air supply in real time according to actual occupancy and CO2 measurements.

Air requirements, flow rates and sizing

The extractor hood: extraction, make-up air and interaction with ventilation

Effectively compensate for peak kitchen extract flow rates without unbalancing the balanced mechanical ventilation unit.

Air requirements, flow rates and sizing

Calculating pressure loss: the most unfavourable branch, fittings and margin

Identify the most unfavourable air circuit in order to select a perfectly suited fan without over-consumption.

Air requirements, flow rates and sizing

Air intake and discharge: distance, height, prevailing wind and short-circuiting

Position your facade and roof grilles to prevent any re-entry of stale air into the building.

Air requirements, flow rates and sizing

Underground garage: base flow rate, peak flow rate and carbon monoxide interlocking

Link the air renewal of underground car parks to carbon monoxide thresholds to reduce the energy bill.

Air requirements, flow rates and sizing

An airtight building requires ventilation: flow balance and residual negative pressure

Control the airtightness of the envelope to guarantee rigorous balancing of internal pressures.

Air requirements, flow rates and sizing

Ventilating an existing building: available routes, lost heights and compromises

Fit high-performance ducts in existing suspended ceilings using compact, quiet solutions.

Air requirements, flow rates and sizing

What energy rules require: recovery efficiency, fan power and compliance proof

Validate the efficiencies of the exchangers and the specific fan power according to cantonal requirements.