Skip to content
Website
🧱 CFC 238KNX home automation: topology, addressing and parameter settingChapter 3 of 10 in the section

Powering the bus: current per bus device, choke and redundancy

Sizing a KNX power supply is not merely multiplying the number of devices by ten milliamperes. You will learn how to establish the actual power budget for each bus device, anticipate simultaneous current draws during global scenarios, and follow the installation rules for the integrated choke on each bus segment.

Key takeaways

  • A standard bus device requires ten milliamperes, but certain modules draw up to fifty milliamperes at peak.
  • The morning global command triggers simultaneous acknowledgements causing a voltage collapse on an undersized bus.
  • The integrated choke separates the direct current power supply from the AC-modulated data signal.
  • Each line segment generally allows only one power supply to prevent choke interference.

Establishing the actual power budget and anticipating simultaneous peaks

In routine building practice, the reflex of allocating a uniform flat rate of 10 mA per KNX component leads to intermittent faults that are difficult to diagnose. While this figure remains accurate for a simple push-button or a passive binary input, the reality of modern equipment is quite different. Touch screens not powered by an external auxiliary source, IP gateways, routers, presence detectors with radar or ultrasonic technology, and air quality sensors with LED light rings routinely require between 20 and 60 mA on the SELV bus (safety extra-low voltage of 30 V DC).

Indicative current draws of KNX bus devices at 30 V DC
Type of bus deviceAverage nominal current drawMaximum current draw during transmissionIntegration note
2- to 4-gang push-button without active LED10 mA10 mAStable current draw on the bus
Push-button with backlit display15 mA25 mACurrent linked to programmed backlighting
Multi-sensor presence detector (CO2, lux, PIR)20 mA35 mAPeak during acoustic or infrared measurements
Line coupler or media coupler10 mA30 mASignificant current draw during intense filtering
IP gateway / IP interface without auxiliary supply40 mA60 mATo be transferred to an external power supply if bus is heavily loaded

The critical point of a home automation installation does not occur in the middle of a quiet operational day. The collapse of the bus line happens at the exact moment of massive switching. During an "All Off" sequence or upon mains voltage recovery after a network outage, all actuators simultaneously send their status telegrams, while the acknowledgement status LEDs light up in unison. This influx of frames generates a continuous series of negative or positive acknowledgements and an instantaneous consumption peak.

Mastering the integrated choke and power supply topology

A KNX power supply does not simply deliver smoothed direct current. Its primary function relies on the presence of a choke (also known as an inductor). The KNX protocol transmits its telegrams by symmetrical voltage modulation: logic zero is represented by a negative pulse that briefly discharges the bus, immediately followed by an equalising overvoltage generated by the choke. If an ordinary 30 V DC stabilised power supply were connected without this inductor, the near-zero internal resistance of the source would short-circuit the AC data pulses, making any communication impossible.

Choke
Inductive component filtering high-frequency signals while allowing direct current to pass through. In the KNX bus, it prevents the voltage regulator from short-circuiting the AC component of the digital data modulated at 9600 baud.

Most modern modular units integrate this choke into their DIN rail housing. However, the basic topology rule states that only one standard power supply must equip a given line or line segment. Connecting two sources that are not designed to operate in parallel on the same red/black pair modifies the overall impedance of the bus. Paralleling two chokes halves the apparent inductance of the circuit, which flattens the amplitude of the data pulses and corrupts telegram transmission.

  1. Sum the current draws from the technical datasheetsConsult the mA values of each device specified in the project rather than applying an arbitrary average of 10 mA.
  2. Increase to absorb diversity and peak loadsMultiply the sum obtained by a safety factor of 1.30 to handle simultaneous transmission peaks and future extensions.
  3. Select the standardised modular ratingSelect the commercially available rating immediately above from among market standards: 160 mA, 320 mA, 640 mA, or 1280 mA.
  4. Check compatibility in case of dual sourcesIf the segment requires two power supply units to cover a cable length exceeding 350 metres, ensure that the models are expressly certified for parallel operation without a minimum cable distance between them.

Dynamic line sizing: peak calculation and operational reserve

A KNX load calculation based on an arbitrary average of 10 mA per module exposes the installation to intermittent dropouts that are difficult to diagnose. Upon mains voltage recovery after a power outage or during a global command ("all off and motorized blinds down" scenario), all logic circuits, status LEDs, and transmission stages activate at the exact same moment. The cumulative current draw then exceeds the value measured in steady state. If the power source is sized to the bare minimum, the voltage collapses below the critical threshold of 21 V DC. The microcontrollers of the bus devices reset in cascade, causing immediate interference and telegram losses on the line.

Typical current draw breakdown per KNX bus component
Type of bus deviceStandby currentPeak currentDynamic impact on the line
Standard push-button (without LED)5 to 8 mA10 mALow resistive load, occasional traffic
Touch push-button with RGB LED12 to 18 mA25 to 30 mAContinuous current draw of status LEDs
Multi-sensor presence detector8 to 12 mA15 to 20 mARegular peaks during infrared scanning
Room touch screen or web server30 to 45 mA50 to 60 mAHeavy capacitive load, graphics processing
DIN rail modular actuator (bus section)10 to 15 mA20 mAInrush current during relay switching
Line coupler or IP/KNX gateway10 to 20 mA30 mASustained activity during network filtering

Operational sizing requires summing the peak currents stated on the manufacturers' technical datasheets, supplemented by an appropriate diversity factor. The installer applies a 30% uplift to absorb transient states and thermal drift in distribution boards. For a line grouping around forty bus devices totalling 610 mA at peak, choosing a 640 mA unit proves risky: summer heat build-up leads to internal safety shut-offs. Selecting a higher standardised rating of 960 mA or 1280 mA guarantees the necessary reserve and allows modules to be added without replacing the power supply equipment.

Power supply topology, choke, and validation under load

Powering a KNX bus is not merely injecting ordinary direct current onto two conductors. Each certified unit includes an integrated choke. This inductor presents negligible resistance to direct current (30 V DC) but opposes very high impedance to high frequencies. It thus prevents the source's filtering capacitors from flattening the 9600 baud differential AC signals superimposed on the red and black twisted pair. Connecting a standard DC source without a dedicated inductor instantly smothers the frames, making any communication impossible on the segment.

The cabling topology increases the risk of voltage sag. On a certified KNX JY(St)Y 2x2x0.8 mm cable, the loop resistance reaches approximately 75 Ω per kilometre. While the power supply nominally provides 29 to 30 V DC, the voltage measured at the terminals of the furthest bus device must never be lower than 21 V DC, the floor threshold set by the protocol. A cable run reaching the permissible limit of 350 metres between the source and the last bus device, combined with poorly distributed loads, causes a detrimental ohmic voltage drop during collective switching.

  1. No-load voltage measurement at the distribution boardCheck the DC voltage across the bus terminals at the power supply output using a multimeter. The value must settle stably between 29 and 31 V DC.
  2. Triggering maximum simultaneous loadInitiate a collective command via the ETS diagnostic tool, simultaneously activating all actuator relays, status LEDs, and screens on the segment.
  3. Reading at the most disadvantaged bus deviceMeasure the voltage on the KNX connector of the component located at the furthest physical end. Check that it remains strictly above 21 V DC during the current surge.
  4. Verification of the power reserveCheck on the status LEDs or via the diagnostic telegram that the peak current does not exceed 80% of the unit's rated capacity.

Diagnostic procedure and corrective actions during bus overload

When the power supply cuts out upon triggering an "all off" scene or a departure scenario, the internal voltage drop causes a cyclic reset of the bus devices. Actuators switch erratically, touch screens reboot, and couplers reject frames. On the power supply terminal block, the overload LED turns red or switches to safety pulse mode. This behaviour points to sizing calculated too tightly, which worked during piecemeal testing but fails under actual simultaneous load. Under art. 364 CO, the contractor is liable for the work under rules similar to those governing an employee, which engages their liability for the conformity of the installation.

  1. Measure the residual voltage under loadMeasure the DC voltage across the terminals of the most distant bus device using a calibrated digital multimeter. A value below 21 V DC during a burst of commands confirms excessive loop impedance or power supply saturation.
  2. Isolate branches and track excess consumptionMethodically disconnect the outgoing circuits at the distribution terminal blocks to split the network. Identify high-consumption devices, such as IP interfaces, couplers, or detectors with auxiliary relays, whose current draw per bus device exceeds the nominal average estimate of 10 mA.
  3. Restructure the power supply without multiplying sourcesNever add a second source at random. If the line proves too heavily loaded, replace the existing unit with a 640 mA or 1280 mA model featuring an integrated choke. If the bus device limit is reached, divide the line using a KNX line coupler.

A reliable installation requires a complete recalculation of the load balance before handover of the work. Document the actual value measured at rest and then at peak on the commissioning protocol. Integrating a power reserve of at least twenty percent remains the only safeguard against warranty claims during winter operating peaks.

Frequently asked questions

Why does the KNX bus power supply trip when a global command is activated?

When a centralized command triggers all actuators at once, each component simultaneously activates its controller and its indication LEDs. This peak current draw per bus device generates a surge that exceeds the maximum capacity of the source. The integrated choke does not compensate for the lack of amperage: the voltage collapses below the critical threshold, triggering the thermal or electronic safety cutout of the power supply unit.

Can two separate power supplies be installed on the same KNX bus line?

This configuration is generally prohibited: the fundamental rule requires only one power supply per line to avoid potential imbalances. Some manufacturers only permit it if their models are designed to operate in parallel or if they are separated by a minimum bus length of two hundred metres. When in doubt, replace the device instead with a higher-capacity unit of 640 or 1280 mA with an integrated choke.

What minimum DC voltage must be measured at the furthest bus device?

The KNX system standard mandates a nominal bus voltage of 29 to 30 V DC at the power supply output. At the terminals of the most disadvantaged bus device, the voltage must never drop below 21 V DC under full load. A lower value indicates excessive loop resistance, an unsuitable cable cross-section, or saturation of the power supply module, leading to random telegram loss.

What safety margin should be allowed when calculating a KNX power supply line?

Although most buttons and sensors consume approximately 10 mA, other equipment such as touch screens or gateways require up to 30 to 60 mA on the bus. It is essential to apply a safety reserve of at least twenty percent beyond the calculated theoretical sum. This margin absorbs simultaneous inrush currents and allows a few bus devices to be added later without having to restructure the existing topology.

Texts and standards cited

  • CO art. 364obligations of the contractor: liability subject to the same rules as that of an employee; they execute the work in person or under their personal supervision; unless customary or agreed otherwise, they provide at their own expense the necessary resources, equipment, and tools.

In the same section