Diagrams, sizing and protection: the execution reference
Intended for team leaders, site foremen and safety officers in the electrical trade, this section brings together the decisive criteria for checking and validating engineering choices on the construction site. From the earthing system diagram to the thermal and magnetic sizing of protective devices, it provides concrete benchmarks for verifying the compliance of switchboards and cable routes according to the recognised rules of the art, ahead of final inspections and the acceptance of installations.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 5
30 mA
Maximum sensitivity of the residual-current device for socket-outlet circuits up to 32 A
4 %
Maximum permissible voltage drop between the service entrance and the load
0.4 s
Maximum disconnection time in a TN system for 230 V final circuits
16 A
Minimum rated current of a dedicated circuit for vehicle charging
5 years
Statutory limitation period for defects in a building work
Technical scope and boundaries of intervention
Sizing low-voltage power installations requires a rigorous reading of the execution diagrams and calculation notes. The installation electrician is responsible for the physical implementation and for checking the parameters of automatic disconnection of supply. The verification covers the match between the breaking capacity of the devices, the prospective short-circuit current at the point of installation, the permissible voltage drop and the thermal stress withstood by the insulation.
From a legal and contractual standpoint, monitoring compliance with the recognised rules of the art applies at every stage of executing the switchboard and pulling the conductors. Deliberate failure to observe these basic safety rules directly engages the liability of those involved in the event of an accident or fire, in accordance with the provisions of the Criminal Code on the rules of the art of construction set out in art. 229 CP.
- Checking the continuity of protective conductors and of the main equipotential bonding.
- Verification of the maximum permitted line lengths with respect to magnetic tripping.
- Suitability of residual-current devices with regard to leakage currents with a DC component.
- Coordination of ratings and tripping curves to guarantee continuity of service for the non-faulty outgoing circuits.
Methodological path for analysis and checking
The analysis of an execution file follows a logical progression from the energy source to the final use. It is essential to first characterise the earthing system imposed by the local distribution network, because this choice immediately dictates the conditions of protection against indirect contact, the distribution of the neutral conductor and the strict separation of exposed conductive parts.
- Earthing system and supply structureIdentify the transition point between the neutral and the protective conductor, taking care to prohibit any recombination downstream so as to preserve the integrity of the TN-S network.
- Cable routes and thermal constraintsCalculate the nominal cross-section by cross-checking the installation method, the ambient temperature, the grouping of circuits and the permissible voltage-drop limit.
- Modular protective switchgearDefine the magnetic tripping curve according to the inrush load and verify the systematic inclusion of the residual-current devices required for personal protection.
- Coordination, overvoltages and specific loadsOrganise upstream-downstream selectivity, install surge protective devices of the appropriate type and size the charging circuits and the photovoltaic injection circuits.
Rigorous switchboard documentation is the guarantee of safe operation. Perfect agreement between the physical markings on the terminal blocks, the circuit-breaker labels and the updated single-line diagrams helps avoid erroneous switching operations during future troubleshooting or extensions.
📘 Chapters in this section 10
Earthing system: recognising a TN-S and what it requires of the installation
Master the PE-N separation point to eliminate destructive stray currents in shields.
Schematics, sizing and circuit protectionConductor cross-section: permissible current, voltage drop and line length
Validate the thermal withstand of the copper and prevent excessive voltage drops over long distances.
Schematics, sizing and circuit protectionCircuit-breaker curve: B, C or D depending on what is supplied
Select the correct magnetic curve to avoid nuisance tripping on motor inrush peaks.
Schematics, sizing and circuit protection30 mA RCD: which circuits it must protect and why
Identify without fail the outgoing circuits requiring protection of persons against accidental direct contact.
Schematics, sizing and circuit protectionSelectivity: making the right protective device trip, not the one upstream
Ensure that only the terminal circuit breaker trips, so as to maintain continuity of service of the main switchboard.
Schematics, sizing and circuit protectionConnection capacity: assessing the requirement and submitting the application to the distribution network operator
Assess the connection power precisely to avoid administrative refusals from the network operator.
Schematics, sizing and circuit protectionSurge protector: when it is needed, where it goes and what it does not protect
Install surge protective devices with very short connections to guarantee the real effectiveness of voltage clamping.
Schematics, sizing and circuit protectionDistribution board diagram: circuit identification, updating and documents left on site
Structure the switchboard labelling to ensure a clear handover that complies with OIBT inspectors' requirements.
Schematics, sizing and circuit protectionEV charging point: available power, load management and dedicated circuit
Integrate dynamic load management to connect charging stations without overloading the building's connection.
Schematics, sizing and circuit protectionConnecting a photovoltaic installation: decoupling protection and firefighters' disconnection
Secure the photovoltaic coupling by configuring the decoupling relay and the firefighters' emergency disconnection.