Underlay, ventilation and underlay membrane: the execution reference
Intended for team leaders, foremen and site managers working on pitched roofs, this section covers the layers hidden beneath the roof covering. Between the underlay membrane and the tiles or metal sheets, the methodical management of water vapour, the ventilated air gap and accidental water ingress determines the durability of the structure. You will find the practical execution rules in accordance with standards SIA 232/1 and SIA 180.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
2 m
Fall height from which measures at roof edges are mandatory
60°
Roof pitch above which work is carried out only from scaffolding or a platform
45 mm
Commonly recommended minimum counter-batten thickness for standard roof slopes
0.2 m
Maximum perpendicular projection beyond the roof planes for solar installations exempt from permit
Technical scope and limits of intervention
The success of a pitched roof relies on the coordinated functioning of two envelopes: the main drainage layer formed by the roof covering elements and the underlying safety layer forming the underlay. This section details the intermediate space, where the ventilation air and any leakage water circulate. The requirements covered here aim to control hygrothermal transfer and to protect the roof structure against the penetration of powder snow, night-time condensation and capillary backflow.
The treatment of water vapour requires a clear view of responsibilities on the construction site. While the underlay membrane provides protection against the weather during the temporary phase and then beneath the finished roof covering, it never compensates for a missing or poorly installed vapour barrier on the warm side. According to the requirements of standard SIA 180, the airtightness of the envelope must prevent any convective flow of warm air within the thickness of the insulation, while the counter-battening provides the continuous air circulation required by standard SIA 232/1.
| Building element | Responsible trade | Primary technical function |
|---|---|---|
| Vapour check and airtightness | Carpentry / Plastering (CFC 221) | Stopping convective flows of interior vapour |
| Thermal insulation between rafters | Shared installation according to tender | Thermal resistance and continuity without voids |
| Underlay membrane and sheets | Roofing / Plumbing (CFC 224) | Second barrier against water and wind |
| Counter-battens and wedging | Roofing (CFC 224) | Creation of the continuous ventilation air gap |
| Rodent guards and flashings | Plumbing (CFC 224) | Free air inlet without intrusion of pests |
Methodological reading path and site logic
To make the best use of this guide, the order of the chapters strictly follows the project chronology, from the design of the airflows to the final check before the tiles are closed in. One starts by sizing the ventilation openings at the eaves and the ridge, because these openings dictate the required height of the counter-battening and the dimensions of the metal flashings.
- 1. Controlling air flow and choosing membranesChapters F1-01 to F1-03 lay the physical foundations: calculation of ventilation openings, designation of membrane classes according to altitude-related loads, and fixing of the counter-battening without harmful perforation.
- 2. Managing the thermal build-up and moisture transfersChapters F1-04 to F1-06 deal with the interface between the roof structure and the insulation. They clarify the impact of roof over-insulation and provide concrete answers to thaw-related problems beneath cold metal sheets.
- 3. Handling critical situations and accepting the workChapters F1-07 to F1-10 guide specific interventions: unheated loft floors, delicate refurbishment of old buildings, snow-drift barriers and final verification using a checklist.
The contractor remains responsible for the conformity of his flexible waterproofing materials and their bonding accessories. According to CO, if the material supplied by the client or a circumstance jeopardises the proper execution of the work, the contractor must inform the client immediately. Always check the chemical compatibility of adhesive tapes and bituminous underlays with synthetic or zinc flues.
📘 Chapters in this section 10
Ventilation beneath the roof covering: opening area at the eaves, at the ridge, and what blocks it
Calculate your ventilation openings exactly, without risk of blockage by eaves or insulation.
Sarking, ventilation and underlay membraneRoofing underlay: watertightness class, laying tension and overlap
Choose the right class of flexible membrane and master the bonded laps under tension.
Sarking, ventilation and underlay membraneCounter-battens: thickness, continuity and drainage of water from the sarking
Determine the batten height to ensure water drainage without creating hollows.
Sarking, ventilation and underlay membraneInsulating between rafters or over rafters: what each solution means for the roofer
Adapt your fixings and connections according to the position of the insulation on the roof structure.
Sarking, ventilation and underlay membraneAirtightness under pitched roofs: penetrations, junctions and sequence of trades
Secure the connections of chimneys and service ducts to stop warm air leaks completely.
Sarking, ventilation and underlay membraneCondensation under a metal roof: why the metal drips and how to prevent it
Eliminate the risk of condensation beneath metal sheets thanks to felt and ventilation.
Sarking, ventilation and underlay membraneUnheated lofts: insulating the floor and ventilating the space above
Insulate lower floors effectively while ventilating the cold loft without creating draughts.
Sarking, ventilation and underlay membraneOld roof without underlay: diagnosis and remedial solutions
Diagnose ageing substrates and install a new underlay from the outside without demolition.
Sarking, ventilation and underlay membranePowder snow: where it gets in and what stops it
Block snow drifts beneath the ridge using sealing strips suited to high-altitude winds.
Sarking, ventilation and underlay membraneCheck the underlay before covering: the last chance to see
Systematically mark membrane defects before the roof covering hides the leaks.