Drinking water: service entry, protection and meter: the execution standard

Intended for foremen, plumbing installers and site managers, this section brings together the rules of good practice for bringing drinking water into the building, protecting the public network against polluted backflow and organising metering. Based on the SSIGE guidelines and standard SIA 385/1, it details the technical sizing from the water service entry to the start of the risers, with no compromise on sanitary quality.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

SSIGE W3 guidelines

5.0 bar

Recommended maximum static pressure at sanitary draw-off points

SSIGE W3/E1 guidelines

100 mm

Minimum air gap width for total overflow on the rainwater network

Norme SIA 385/1

50 °C

Minimum hot water distribution temperature at the loop outlet

SSIGE W3 guidelines

1.5 times

Minimum pressure for the leak-tightness test relative to the service pressure

Scope of plumbing work and boundaries of works

The responsibility of the CFC 250 plumbing installer begins exactly at the point where the supply pipe penetrates the foundation slab or the basement wall, immediately after the watertight sleeve. Opening the trench on private land, shoring the trench walls and supplying the compacted backfill fall under the earthworks and masonry work of CFC 201 and CFC 411. As soon as the pipe passes through the external wall, the plumbing installer takes charge of the main stop valve, the protective filter, the pressure reducer, the metering assembly and all the backflow-prevention devices required by the municipal water suppliers and the SSIGE guidelines.

Technical interface boundaries at the water service entry
Installation elementResponsible tradeScope limit
Watertight sleeve and external core openingStructural work (CFC 201)Fitting of the wall-penetration sealing gasket
Supply pipe after the façade wallPlumbing installer (CFC 250)From the general isolation valve to the internal network
230 V supply for backflow preventer/water softenerElectrician (CFC 232)Dedicated line up to the socket or junction box
Discharge drain of the BA backflow preventerPlumbing installer (CFC 250)Standard air gap and trap to the wastewater network
Water heater: hydraulic drinking-water connectionPlumbing installer (CFC 250)Stop valve, non-return valve and safety valve
Water heater: charging circuit and heat pump controlHeating installer (CFC 241)Primary heating flow and return

On renovation construction sites, the transition between existing networks and new pipes demands absolute rigour. The installer applies the duty to notify provided for in art. 365 CO para. 3 as soon as they identify old sections of scaled galvanised steel or lead pipework, materials incompatible with current hygiene requirements and sources of destructive galvanic couples.

Organising the technical route: from the manifold to the distribution

To guarantee a durable, quiet installation compliant with SSIGE rules, the work must follow a logical sequence of design and assembly. Neglecting the mechanical treatment of the water at the head of the installation immediately exposes the sensitive mechanisms of pressure reducers and backflow preventers to severe blockages.

  1. Physical securing and metering in the plant roomPosition the service entry point in a frost-free room accessible to the utility services. Install the lockable general stop valve, the spacer piece for the water meter, then the mechanical backwash filter preventing sand from the public network from entering.
  2. Hydraulic control and sanitary backflow preventionStabilise the service pressure with a calibrated pressure reducer to eliminate water hammer. Install the backflow-prevention devices immediately afterwards: a testable reduced-pressure-zone backflow preventer (type BA) for high-risk fluids or a testable check valve (type EA).
  3. Distribution, possible treatment and sub-meteringIf necessary, fit the water softener on the domestic hot water circuit according to the local hardness criteria. Install the distribution manifolds on each floor and equip each dwelling with sub-meters mounted horizontally or vertically according to their metrological class.
  4. Strict separation of secondary and external networksHydraulically isolate the outdoor watering circuits with drainable frost-proof taps and prohibit any direct connection with rainwater harvesting installations, which require a total overflow without mechanical contact.

📘 Chapters in this section 10

Drinking water: introduction, protection and meter

Bringing in the water: entry point, meter room and accessibility

Master the dimensions of the technical room and the installation heights required by the water suppliers.

Drinking water: introduction, protection and meter

Preventing backflow: risk class, check valve, disconnector and total separation

Select the right check valve or backflow preventer according to the hazard class of the fluid to avoid contamination.

Drinking water: introduction, protection and meter

Controlling pressure: pressure reducer, static pressure and water hammer

Set the static pressure precisely to eliminate water hammer and protect the fittings.

Drinking water: introduction, protection and meter

Choosing materials: copper, stainless steel, multilayer and prohibited pairings

Avoid fatal galvanic corrosion by mastering the rule of copper placed downstream of steel.

Drinking water: introduction, protection and meter

Treating water: filter, water softener, regulatory limits and maintenance

Size the filter and the water softener according to the water hardness without breaching the legal thresholds.

Drinking water: introduction, protection and meter

Metering per dwelling: meter positions, accessibility and initial reading

Position the sub-meters in the service shafts to guarantee readings free of tenancy disputes.

Drinking water: introduction, protection and meter

The outdoor tap: draining, frost protection and backflow protection

Install a watering point protected against winter frost with a reliable built-in backflow-prevention device.

Drinking water: introduction, protection and meter

Rainwater: separate network, mandatory marking and ban on mixing

Arrange a disconnection by absolute air gap between the rainwater network and the drinking-water pipe.

Drinking water: introduction, protection and meter

Taking over the old: lead, corroded galvanised steel and what we refuse to extend

Identify degraded lead or steel pipes and refuse non-durable connections.

Drinking water: introduction, protection and meter

Shutting off the water: notice, duration, temporary water point and restoration of supply

Coordinate the general water shut-offs and apply the repressurisation procedure without incident.