Skip to content
Website
🧱 CFC 238Structured copper cabling: classes, installation and linksChapter 4 of 10 in the section

Terminating an RJ45 socket: untwisting, screen termination and colour code

This guide details the steps required to make up a shielded Category 6A female RJ45 connector. The installer will learn to prepare the cable end without damaging the insulation, strictly limit the untwisting of the conductors, terminate according to the T568A or T568B code and secure the 360-degree shield continuity in order to pass certification of the permanent link.

Key takeaways

  • The residual untwisting of the conductors must never exceed six millimetres at high frequencies.
  • The ISO/IEC 11801 standard requires strict pair symmetry to ensure near-end crosstalk performance.
  • 360-degree screen termination ensures equipotential bonding and blocks external electromagnetic interference.
  • The T568A or T568B scheme must be strictly identical between the patch panel and the socket.

Limit untwisting and apply the standardised termination code

In a structured communication network, RJ45 connectors are the critical point of the transmission channel. The ISO/IEC 11801 standard sets the performance requirements for copper link classes, from Class E (Category 6) to Class Ea (Category 6A, up to 500 MHz). High-speed transmission relies on common-mode noise rejection, made possible by the precise geometric twisting of the twisted pairs. Each twist pitch is calculated to cancel induced electromagnetic fields and limit inductive coupling with neighbouring pairs. Breaking this geometry immediately degrades near-end crosstalk (NEXT) and far-end crosstalk (FEXT).

The internal arrangement of the conductors demands absolute rigour when they are combed into place. According to the project specifications, the network electrician or telematics installer applies one of the two orderings defined by the T568A or T568B codes. In Switzerland, both configurations are regularly found in cantonal or private specifications, although the T568A scheme is frequently prescribed for its historical alignment with certain ISDN telephone links. The technical requirement is to keep the same assignment at both ends of the permanent link.

Pair and pin assignment according to T568A and T568B
RJ45 pinSignal roleT568A code assignmentT568B code assignment
Pin 1Pair 3 (A) / Pair 2 (B)White-GreenWhite-Orange
Pin 2Pair 3 (A) / Pair 2 (B)GreenOrange
Pin 3Pair 2 (A) / Pair 3 (B)White-OrangeWhite-Green
Pin 4Pair 1BlueBlue
Pin 5Pair 1White-BlueWhite-Blue
Pin 6Pair 2 (A) / Pair 3 (B)OrangeGreen
Pin 7Pair 4White-BrownWhite-Brown
Pin 8Pair 4BrownBrown

Accidentally mixing the two standards on the same run creates a non-functional crossover cable for Gigabit or 10GBase-T equipment, which expects a straight-through link. The contractor meets the duty of technical diligence provided for in art. 364 CO by guaranteeing work free of basic cabling defects. Checking that the colours match on the wire organiser before mechanical crimping prevents wasted time at acceptance measurement.

Perform the 360-degree screen termination and lock the module

The attenuation of electromagnetic interference and immunity to external noise (Alien Crosstalk) depend entirely on the shielding. On S/FTP structured cables (overall braided shield and individual aluminium-polyester foil shield per pair), the earth continuity must connect to the metal structure of the building without any break in the surface. Screen termination cannot rely on a simple drain wire twisted around the connector. It must be achieved by continuous circumferential contact between the earth braid and the metal shell of the RJ45 module.

  1. Precise stripping of the outer sheathUsing a rotary stripping tool with an adjusted stop, score the LSZH sheath over 40 mm without touching the strands of the outer metal braid.
  2. Folding back the shield braidFold the braid back evenly over the outer sheath of the cable. For F/UTP cables, wrap the aluminium foil with the conductive side outwards without excessive creasing.
  3. Insertion into the wire managerBring the separator or guide comb as close as possible to the point where the pair screens end. Remove the aluminium foil right up to the guide without untwisting the conductors upstream.
  4. Positioning and trimming the strandsSeat the strands in their respective slots according to the chosen colour code. Cut off excess copper flush with the plastic using a precision flush cutter without a bevel.
  5. Locking the metal shellInsert the guide into the body of the keystone-type RJ45 module and close the die-cast zinc jaws until a clear mechanical click is heard, ensuring IDC insulation displacement.

Using unsuitable tools, such as electrician's cutters or universal pliers, is the main cause of nicks in the inner PE insulation and intermittent short circuits. Modern RJ45 modules that need no specific tool (known as "toolless") incorporate insulation displacement contacts (IDC) that ensure calibrated pressure on the copper. Closing the metal half-shells ensures 360-degree screen termination through uniform mechanical clamping on the folded-back braid, without crushing the cable core.

Before finally clipping the module into the mounting plate (Swiss 60x60 standard or modular faceplate), a direct visual check is required: no loose braid strand that could touch a live terminal, cut wires perfectly flush with the plastic and the shielding spring fully locked. Properly fitting a metal clamp or retaining ferrule ensures the tensile strength required on the construction site.

Insertion tools and geometric control of pair separation

Compliance with the transmission tolerances defined by ISO/IEC 11801 for Class E_A (Category 6_A) links rules out makeshift insertion methods. The integrity of the lay length of each pair directly determines immunity to internal electromagnetic interference. As soon as two conductors run in parallel without twisting, mutual induction increases and degrades local crosstalk (NEXT). To ensure repeatability on the construction site, the installer uses only modular insulation displacement (IDC) connectors fitted with an intermediate ordering block, commonly called a comb or wire guide.

Using standard electrician's diagonal cutters presents a major risk: their bevelled jaws crush the copper instead of cutting it cleanly and leave strands protruding several millimetres beyond the guide. A flush cutter without a chamfer, designed for electronics, or the dedicated crimping tool supplied by the manufacturer of the modular system should be used. This tool ensures the simultaneous seating of the insulation displacement contacts and the removal of excess length flush with the plastic, preventing any short circuit against the metal shielding cover.

Effect of termination geometry on certification parameters
Workmanship defect observedDirect impact on RF measurementISO/IEC 11801 normative consequenceCorrective action required
Pairs untwisted over more than 10 mmSharp drop in NEXT and PS-NEXT marginFailure on the certification tester (Fail)Cut the cable and redo the connector completely
Incomplete screen termination (drain wire only, no foil at 360°)Degradation of coupling attenuation and alien noise (ANEXT)Non-compliance in noisy environmentsReopen the connector and refit the conductive foil
Conductors crushed by an unsuitable toolImpedance variation and return loss (RL) peakLink instability at high frequenciesReplace the wire guide and cut the conductors cleanly
Colour code crossed between ends (mixing T568A / T568B)Crossed or split pairsImmediate rejection on the wire mapRedo one end according to the site standard

Handling of the pairs within the comb follows a strict sequence: the outer sheath of the cable must go as deep as possible into the connector housing. The pairs are separated only immediately at the exit of the sheath, keeping the twists tight right up to the IDC contact blade. No sharp metal tool (cutter or electrician's blade) may be inserted between the conductors to split the sheath, in order to avoid any nick in the polyethylene insulation, which is an immediate source of capacitive leakage.

Visual inspection protocol and check before locking

Before snapping on the metal shells or folding down the locking lever, the installer carries out a methodical four-point visual check. This step, taking a few seconds, prevents failures at final acceptance with the Class E_A dynamic certifier. The first point concerns the continuity of the twist: the green, orange, blue and brown pairs must keep their original lay right up to the insertion slots. The second point confirms strict colour matching according to the scheme chosen for the whole installation, generally the T568B code in French-speaking Switzerland, or T568A when extending existing commercial networks.

  1. Checking that the conductors are trimmed flushInspect both side faces of the comb block. All eight copper conductors must be cut flush with the insulating wall. No strand may protrude by more than 0.5 mm, to rule out any risk of earth contact with the nickel-plated zamak housing.
  2. Checking the foil screen and the braidCheck that the aluminium-polyester foil is folded back with the conductive side outwards and without tears. The overall braid or the individual braids must be evenly distributed over the earthing collar to ensure 360-degree screen termination with no gap around the circumference.
  3. Penetration of the outer sheathCheck visually that the end of the halogen-free sheath (LSZH) goes beyond the mechanical cable clamp. Any tensile force applied to the cable must be taken entirely by the outer sheath and not by the terminated copper conductors.
  4. Locking and mechanical engagementClose the shield jaws by hand or with the recommended parallel pliers. Locking must produce a clear click, ensuring firm contact of the peripheral shield and full seating of the IDC blades in the copper cores.

The contractor is liable for the conformity of the work with the recognised rules of the trade, which means carrying it out in line with the technical standards for structured cabling under the general obligations of art. 364 CO. Once locking is complete, the shielded RJ45 module is fitted into its flush-box faceplate or into the patch panel, respecting a minimum cable bend radius of 4 times the outer diameter at rest, and 8 times during pulling. Any pinching or sharp-angle bending at the back of the socket cancels the benefit of a careful termination by creating a local impedance mismatch measurable with the link tester.

Rectifying non-conformities and clearing certification reservations

During acceptance testing with cabling certifiers according to ISO/IEC 11801, non-conformities show up mainly as a drop in near-end crosstalk (NEXT) margin or a degradation of the shielding. When a permanent link fails on a Class EA or Category 6A link, the fault almost always comes from the connector termination rather than from the cable itself. Untwisting beyond the permitted tolerance or a partial screen contact is enough to downgrade the link. Art. 364 CO requires the contractor to carry out the work with care and in accordance with established professional rules.

Diagnosing measurement failures and remedial actions
Certifier faultMechanical origin on the moduleCorrective action
NEXT / PS-NEXT failurePairs untwisted over more than 13 mm or pairs separated too far back in the combCut off the termination, strip the sheath again and keep the twist up to 3 mm from the insulation displacement contacts.
Return Loss failurePair geometry crushed or bend radius below the minimumLoosen the entry clamp, reform the bends without kinking and reclip without compressing the insulation.
Open shield continuityFoil or braid poorly clamped, 360-degree screen termination incompleteReopen the shielded cover, readjust the braid on the metal ring and make sure the metal clamping is complete.
Scheme inversion (Wiremap)Occasional mix-up between T568A and T568B code at one of the endsIdentify the standard chosen on the patch panel and rewire the female socket according to the same code.

When the link has a fault, the rework must be methodical so as not to use up the spare loop coiled in the flush-mounting box. It is forbidden to try to reinsert an already nicked conductor into an insulation displacement contact without cutting it back: the metal blade has lost some of its elasticity and the strand is weakened. The installer cuts off the faulty end cleanly with a precision cutter, strips 40 mm of outer sheath again with the rotary cable stripper and rebuilds the termination. The visual check before final clipping of the shield flap verifies that there are no crossed wires and that the peripheral screen termination is even. A new self-test measurement is carried out after reassembly to validate the integrity of the link before the acceptance report is signed.

Frequently asked questions

What is the maximum permitted untwisting length according to ISO/IEC 11801?

According to the requirements of ISO/IEC 11801, the maximum permitted untwisting length on twisted-pair cables must not exceed 13 millimetres for common categories, and ideally less than 5 millimetres for Category 6A links. Beyond this tolerance, inductive and capacitive coupling between conductors rises sharply, which generates near-end crosstalk at high frequencies and causes the link to be rejected during acceptance tests.

How do you make a compliant 360-degree screen termination on a Keystone module?

To guarantee 360-degree screen termination, the installer folds the overall shield braid back evenly around the outer sheath, without forming a twisted braid or pigtail. When the cable is seated in the connector, the metal ring or die-cast zinc foil of the frame must encircle the full circumference of the shield. This contact surface provides a very low transfer impedance, essential for the electromagnetic immunity of the system.

What are the consequences of unintentionally mixing the T568A code and the T568B code?

Mixing the T568A scheme at one end and T568B at the other produces a crossover cable on the orange and green pairs (pins 1-2 and 3-6). Although modern active interfaces often correct this crossover in software through the auto MDI-X function, the certification instrument rejects the link at the wire map test. On a Swiss construction site, the client requires strict compliance with the standard specified in the technical tender specification.

Can a female RJ45 connector be reused after a failed test?

Most toolless Category 6A RJ45 modules allow several reopening cycles, generally between five and ten reinsertions depending on the manufacturer. However, when reworking, the conductors must be cut back to remove the portion of copper previously scored by the insulation displacement contacts. If the guide comb or the metal tabs of the shield body are deformed, complete replacement of the connector remains essential to guarantee the link.

Texts and standards cited

  • ISO/IEC 11801Information technology - Generic cabling for customer premises
  • CO art. 364Obligations of the contractor: liability subject to the same rules as that of the employee; careful execution of the work

In the same section