Key takeaways
- Outdoor sealing gel constitutes a liquid combustible that propagates flames during a fire.
- The penetration of a building entry cable without fire classification is strictly limited after entry into the building.
- The transition splice box provides the mandatory changeover to a halogen-free indoor cable.
- Fire compartment penetrations require suitable conduits and certified sealing compliant with standards.
Stop the gel-filled cable right at the building entry to eliminate the fire risk
Outdoor optical fibre cable is designed to withstand the harshest environmental stresses: standing moisture, freeze-thaw cycles, mechanical tension during pulling in trenches, and rodent attacks. To ensure longitudinal watertightness, manufacturers inject a hydrophobic synthetic grease or petroleum gel around the optical fibre buffer tubes. While this technical fluid perfectly fulfils its sealing role underground, it represents a hazardous fire load and a major thermal accelerator inside a building.
- Outdoor gel-filled cable
- Telecommunications cable whose interstices and fibre-retaining tubes are filled with a hydrophobic grease or silicone compound to block water ingress, but whose combustion produces flaming droplets and toxic gases.
In the event of an incident in a service riser or stairwell, the polyethylene outer sheath of a building entry cable melts rapidly. The filling gel liquefies under the effect of heat, begins to run down the risers, and ignites spontaneously, creating a veritable liquid wick that spreads the fire from one storey to another. Furthermore, these plastics release dense opaque smoke as well as halogenated vapours that are highly toxic and corrosive to the respiratory tract and electronic equipment.
Swiss fire protection regulations require that outdoor cables without a reaction to fire classification be terminated as close as possible to the point of entry into the structural work. The maximum permissible length indoors does not exceed a few metres, provided it is routed within a fire-rated technical room or inside a protective, unperforated metal conduit.
Install the transition splice box and distribute using halogen-free indoor cable
The separation between the building entry and the internal network is realised by a transition splice box, commonly designated as a building entry point or breakout box. This dust-tight, wall-mounted enclosure receives the outdoor incoming cable, enables thorough degreasing of the optical fibres, and accommodates fusion splicing onto a cable specifically certified for internal building cabling.
| Technical characteristic | Outdoor network cable | Indoor building cable |
|---|---|---|
| Sheath material | Watertight high-density polyethylene | Flame-retardant halogen-free thermoplastic |
| Internal watertightness | Synthetic gel or hydrophobic grease | Dry swellable yarns or threads |
| Heat release | Very high calorific value | Certified low heat release |
| Smoke in the event of fire | Dense black smoke and acidic gases | Light, non-corrosive, non-toxic smoke |
| Authorised installation | In trench, PE ducting and foundation slab | On indoor cable tray and in risers |
- Opening and degreasing with dielectric solventStrip the outer sheath over the length recommended for the enclosure, slit the tubes, and meticulously remove all traces of gel from each strand using a lint-free technical wipe impregnated with a special optical-grease solvent.
- Mechanical securing of strength membersSecure the outer sheath firmly and clamp the central strength member or aramid yarns onto the frame mounting brackets to prevent any mechanical movement towards the splice trays.
- Fusion splicing to the indoor cableSplice the fibres to pigtails or directly to the strands of the halogen-free cable, then coil the spare lengths in the trays while respecting the minimum bending radius.
- Tube identification and labellingRecord the allocation of tubes and fibres on the rack chart and mark the origin of the building entry on the enclosure cover to ensure full traceability of the optical links.
Once splicing is completed, the secondary network is routed towards the main IT rack using cables equipped with a sheath featuring controlled fire performance. These indoor sheaths incorporate mineral fillers that release water vapour under the effect of an intense heat source, delaying ignition and limiting ambient smoke opacity to keep emergency escape routes passable.
Maximum permissible length of outdoor cable and break location
Introducing an outdoor feeder or drop optical fibre cable into a building creates a major physical incompatibility. Cable intended for civil engineering comprises a robust polyethylene (PE) sheath and a water-repellent hydrocarbon-based gel, essential for sealing micro-cracks against underground moisture. This gel and this PE jacket exhibit a high fire load, a low flash point, and a tendency to release dense, toxic smoke as soon as flames reach them. Extending this material deeply inside the building envelope is equivalent to inserting a continuous flammable wick across fire compartments.
Recognised best practice for communications networks limits the indoor run of an outdoor cable not classified for fire resistance to 5 metres, provided it terminates directly inside an enclosed technical room or a basement not accessible to the public. As soon as such a cable must cross an escape route, a distribution corridor or a stairwell, this allowance immediately drops to zero: the gel-filled sheath must stop at the fire-rated wall penetration or be enclosed in a tight casing offering fire resistance equivalent to the compartment crossed.
To eliminate this risk, the network electrician strictly implements a transition splice point as close as possible to the service introduction point (BEP or building entry box). This wall-mounted enclosure, fixed in the basement or building entry room, receives the incoming outdoor cable. The buffer tubes are stripped there, cleaned with a suitable degreasing solvent to remove all traces of petroleum jelly or thixotropic gel, and the individual fibres are then fusion spliced to a gel-free indoor distribution cable.
Fire performance of indoor sheaths and selection of Euroclasses
The rest of the vertical and horizontal network strictly requires indoor cable with controlled behaviour in fire conditions. Swiss specifications call for halogen-free materials (LSZH / FRNC), whose combustion by-products generate neither toxic acidic vapours such as chlorine or fluorine, nor sudden darkening of escape routes. In the vertical risers of multi-occupancy residential or commercial buildings, optical cables must also comply with the reaction to fire classes defined under the European Construction Products Regulation (CPR), widely applied by planners and cantonal fire inspectors.
| Installation area | Required cable type | Minimum CPR classification | Supplementary criteria (smoke, droplets) |
|---|---|---|---|
| Outdoor routing and buried trench | Watertight gel-filled PE cable | Fca (unclassified for fire) | Not applicable (indoor use > 5 m prohibited) |
| Building entry technical room (basement) | Indoor LSZH cable or outdoor in metal conduit | Eca | No droplet requirement |
| Enclosed vertical service riser | Indoor LSZH riser cable | Dca | s2, d2, a2 |
| Escape routes, walkways and stairwells | Indoor halogen-free safety cable | Cca or B2ca | s1, d0, a1 (low emission, zero flaming droplets) |
The behaviour of flaming droplets (sub-class d) is a critical factor often underestimated when selecting patch cords and optical distribution cables. A standard thermoplastic material that melts and drips under flame action will ignite secondary fires several storeys below along guiding brackets or vertical cable trays. The d0 rating ensures the complete absence of flaming debris during regulatory combustion testing.
Managing non-conformities and remedying illicit gel-filled runs
Discovering during construction that an outdoor gel-filled cable has been run continuously from the building entry to the technical room across escape routes is a serious non-conformity. This combustible product introduces a prohibited fire load into vertical circulations and spreads dense smoke during a fire. Under art. 229 CP, anyone who violates recognised building standards during the direction or execution of a construction project and knowingly endangers the life or physical integrity of persons is subject to criminal penalties.
- Observation and halting of cable pullingAs soon as you identify that the outdoor cable extends beyond the permitted boundary, suspend the connection work. Measure the exact distance between the point of entry through the thermal envelope and the observed stopping point.
- Formal notice to site managementSubmit written notice documenting the non-conformity of the gel-filled cable with respect to VKF fire protection regulations. Under art. 365 CO, the contractor must immediately notify the client of any circumstance that compromises the proper execution of the works.
- Location of the breakout boxIdentify a location in the building entry room or basement technical room to install a transition splice enclosure. This physical break must imperatively be located within the allowable entry perimeter before any run into vertical risers.
- Severing and degreasing of bundlesCut the polyethylene sheath of the outdoor cable using a suitable tube cutter. Thoroughly degrease the tubes and strands with a suitable solvent to eliminate all filling gel residue before entering the splice tray.
- Jointing onto halogen-free indoor cableSplice the fibres onto an indoor distribution cable meeting the reaction to fire requirements, then resume the vertical run up to the patch rack.
Frequently asked questions
What is the maximum distance permitted for a gel-filled cable inside a building?
Fire protection directives and telecom best practice limit the indoor run of an outdoor gel-filled cable to a few metres past its penetration point into the building. This section must imperatively terminate in the initial technical room or basement entry room. Extending into a riser, a stairwell, or crossing multiple fire compartments with this type of conductor constitutes a major breach of recognised fire safety rules.
Why does sealing gel represent a major hazard during an indoor fire?
The petroleum gel protecting optical fibres against outdoor moisture has a low flash point and a very high fire load. Under the heat of an incipient fire, this compound liquefies, escapes the sheath, and actively fuels the blaze. Its combustion produces thick, toxic, and corrosive smoke that rapidly fills the building's vertical escape routes.
Is there an alternative to splice jointing to enter a rack directly?
Yes, it is possible to choose a dual-sheath universal indoor/outdoor cable, without liquid gel but equipped with swellable yarns for longitudinal watertightness. This cable features a tear-off outer jacket and a halogen-free inner sheath with a reaction to fire classification compliant with VKF requirements. One simply strips the black outer jacket at the building entry point to continue the indoor run in full compliance up to the cabinet.
How do you effectively clean gel-filled strands before making the transition splice?
After stripping the outer sheath and slitting the buffer tubes, first wipe off the mechanical sealing gel dry using lint-free wipes. Then apply a degreasing solvent specifically formulated for optical cables to completely dissolve greasy residues on each fibre. Always finish with a meticulous wipe using isopropyl alcohol before cleaving and inserting into the fusion splicer.
Texts and standards cited
- CP art. 229violation of recognised building standards
- CO art. 365materials and site