Key takeaways
- Tiles and their grout remain permeable, making a waterproof barrier directly beneath the adhesive mandatory.
- Standard SIA 248 classifies surfaces by water exposure classes to define the required waterproofing.
- In an open shower, the wall upstand rises at least two metres from the finished floor over the entire footprint.
- Waterproofing tapes ensure a flexible, tear-resistant connection between the screed and the room's perimeter partitions.
Classification of water exposure and application perimeters in accordance with SIA 248
Wall tiles, vitrified porcelain stoneware, or mosaics do not constitute a waterproof barrier under any circumstances. Even when laid with a water-repellent grouting mortar or a reactive resin, the tiled assembly exhibits intrinsic permeability: the grout network undergoes microcracking due to differential shrinkage, structural vibrations, and repeated thermal stresses. Water infiltrates by capillarity behind the cladding, impregnates the mortar-adhesive bed, and directly attacks moisture-sensitive substrates, such as plasterboard or porous mineral renders. Waterproofing under tiles is therefore not optional safety, but a continuous interception membrane placed beneath the tiles to protect the building structure.
To determine where the application of a waterproofing system under tiles is mandatory, the tiler refers to the classification of wet rooms established by standard SIA 248. Requirements vary depending on the frequency of water exposure, the presence of a floor drain, and the nature of the receiving substrate. A plasterboard partition or solid gypsum block requires a complete barrier as soon as direct or moderate splashing is foreseeable, whereas a bare concrete wall tolerates different temporary stresses before absorbing residual moisture.
| Exposure zone | Examples of typical works | Water exposure | Waterproofing system under tiles |
|---|---|---|---|
| Low exposure (A) | Separate toilets, kitchen walls outside the sink area | Occasional wet cleaning, no directed jet | Surface waterproofing not mandatory except on plaster substrates |
| Moderate exposure (B) | Communal bathroom floors, washbasin surrounds | Temporary runoff, intermittent splashing | Liquid-applied waterproofing system or sheet membrane on floor and skirting |
| High exposure (C) | Walk-in showers, shower walls, bathtub surrounds | Direct water jets, frequent splashing and stagnation | Full waterproofing under tiles on floor and exposed vertical walls |
Wall upstand heights and mechanical continuity between floor and walls
Setting out the limits of the waterproofing on walls is carried out before opening the first bucket of waterproofing resin or cutting membrane sheets. Around a shower area without a raised receiver, the wall waterproofing must rise to a minimum height of two metres above the finished floor level, or extend at least twenty centimetres above the shower head outlet in the case of an overhead installation. Laterally, the protected area extends to a minimum width of one metre beyond the axis of the hand shower, or at least thirty centimetres beyond the planned fixed glass screen. Above a bathtub equipped with a fitting with a flexible hose, the waterproof upstand is applied to all supporting faces up to this same two-metre level.
On the rest of a bathroom floor featuring an open shower or floor drain, the waterproofing must cover the entire subfloor or screed. At the foot of partitions not exposed to direct splashing, the film or membrane extends vertically as a skirting to a height of at least fifteen centimetres above the raw screed to anticipate accidental overflows and cleaning water. The corner junction between the floor and walls constitutes the critical line of the work: differential thermal movements between the screed and the walls inevitably crack internal corners.
- Preparation of the corner substrateCarefully dust the transition zone between the screed and the base of the partition. Check for the absence of sharp edges or gravel nests that could shear the membrane.
- Bonding and installation of the waterproofing tapeApply a generous coat of liquid waterproofing system or suitable tile adhesive into the corner. Smooth down a non-woven elastomeric reinforcement tape without creating folds, ensuring symmetrical overlap on the floor and the wall.
- Installation of preformed corner piecesIt is mandatory to install waterproof prefabricated internal and external corners at trirectangular junctions, observing a minimum overlap of fifty millimetres with the linear tapes.
- General overlap and continuityTotally cover the wings of the elastomeric tape during the application of the first and second coats of the liquid membrane or during the installation of the continuous sheet membrane.
Connections to sanitary appliances and waterproofing of penetrations
Tiles and their joint grout form an aesthetic wear finish, but they never constitute a waterproof barrier. Microcracks in the hydraulic binder, surface porosity, and differential movements of substrates allow moisture to migrate by capillarity. To guarantee the durability of the work in accordance with standard SIA 248, the bonded waterproofing assembly must be positioned directly beneath the adhesive and treated without interruption at each technical penetration.
Pipe penetrations for concealed fittings, mixed water supplies, and drainage outlets constitute the most vulnerable points of a wet room. Standard SIA 248 requires a watertight and elastic connection between the penetration body and the waterproofing membrane under tiles. Preformed elastomeric wall collars equipped with a textile flange are systematically used, embedded in the first coat of the liquid waterproofing system or smoothed into the tile adhesive beneath a waterproofing sheet membrane. The pipe or tap extension must emerge perpendicularly to the wall with sufficient clearance to receive the elastic ring without shear stress.
| Sanitary element | Critical infiltration zone | Waterproofing system under tiles | Application method |
|---|---|---|---|
| Walk-in shower (floor-level) | Connection between channel body or drain and screed | Waterproofing apron or collar with mechanical clamping flange | Complete smoothing in the liquid system or reactive bonding on a mortar bed |
| Raised shower tray | Perimeter edge against masonry or lightweight partition | Self-adhesive connection tape with soundproofing resilient strip | Fixing to the edge of the tray and integration of the textile section into the wall upstand |
| Built-in bathtub | Gap between bathtub lip and wall tiles | Perimeter waterproofing tape under the rim before installing the apron | Continuous upstand behind the appliance down to the raw floor or beneath the installation zone |
| Wall fitting penetration | Perimeter of rosettes and supply elbow outlets | Perforated elastic collar with flexible sealing ring | Embedded between two coats of waterproof coating without mechanical tension |
Spatial delimitation and setting out of application limits prior to work
Defining waterproofing perimeters cannot be improvised at the moment of mixing the product. It results from a rigorous reading of setting-out plans and comparison with the actual layout of sanitary fixtures determined by the plumbing installers. The areas of high water exposure, defined by standard SIA 248, extend well beyond the immediate footprint of the water jet to encompass direct splashing and rebounding on adjacent walls.
- Inspection and cleaning of substratesCheck the flatness of the screed and partitions, remove any residual dust, and apply the primer adapted to the material (plasterboard, cement, or levelling compound).
- Marking out limits with chalk line or laserTransfer the protection dimensions onto the walls: at least 200 cm above the tray or finished floor for the shower, with a minimum lateral overhang of 20 cm beyond the curtain or glass partition.
- Installation of corner reinforcement and bridging tapesPosition the preformed waterproofing tapes on all floor-wall fillets and internal corners, smoothing them into the first layer of pure paste without forming folds.
- Cross-application of the waterproofing assemblyApply two regular coats of the liquid system using a roller or notched trowel, observing the intermediate drying time recommended in the manufacturer's technical data sheet.
Continuity between the floor and partitions requires special attention at the connection heel. The floating screed undergoes vertical settlement under the effect of operating loads and slow deformations of the underlying acoustic insulation. The incorporated peripheral waterproofing tape must feature a central unbonded extension zone, often provided with an elastic bellows. This configuration allows differential movements to be absorbed without tearing the waterproof membrane, thereby preventing hydraulic failure at the lowest point of the wet room.
Management of non-conformities, setting-out omissions, and repair of the waterproof assembly
When a defect appears on the waterproofing under tiles — absence of floor-wall waterproofing tape, forgotten waterproofing collar around a pipe penetration, or insufficient wall upstand height —, the tiler must interrupt their laying operations. Laying tiles on a deficient membrane defers the damage to the building's operational phase. Since the tiles and their joint grout in no way form a waterproof assembly, each infiltration will pass through the porous mineral joint and degrade the screed, acoustic insulation, or backing board.
Faced with a disputed perimeter, a plan conflict, or a damaged composite assembly, the intervention method on the construction site is structured into rigorous technical steps in order to preserve the structural strength:
- Joint inspection record and work stoppageDocument non-compliant water exposure areas with precise photographs. Send a written notice to the site management pointing out the surfaces where waterproofing is missing prior to any ceramic cladding bonding.
- Stripping and mechanical substrate preparationRemove contaminated or poorly adhered areas. If tiles have been laid on a punctured membrane, remove the ceramics and then grind away the mortar-adhesive residues without weakening the underlying substrate.
- Connection with standardized overlapApply a new sheet membrane or liquid waterproofing perfectly compatible with the existing system. Respect an overlap of at least fifty millimetres on the stripped old assembly and smooth the corner waterproofing tape into the fresh material.
- Treatment of penetrations and wall upstandInstall waterproof elastic collars on each plumbing sleeve, embedded in the waterproofing layer. Ensure that the vertical upstand reaches the dimension prescribed by standard SIA 248 for the relevant wet area.
The careful repair of waterproofing under tiles engages the contractor's liability until the acceptance of the work in accordance with standard SIA 118. Continuous waterproofing, delineated from the preparatory phase and rigorously connected to door openings and technical penetrations, avoids costly disputes related to underside water damage.
Frequently asked questions
Why is it not sufficient to rely on tile grout to ensure the waterproofing of a walk-in shower?
Cement tile grouts are porous materials that absorb water by capillarity. Under the effect of thermal stresses, microcracks inevitably appear between the grout and the tile edge. Water infiltrates beneath the ceramic cladding from the very first uses. Without continuous waterproofing under tiles, moisture accumulates in the screed and passes through the floors. The waterproofing located on the underside therefore constitutes the only hermetic barrier against infiltrations towards the structure.
What is the minimum height the wall waterproofing must reach around a bathtub equipped with a hand shower?
According to the rules of the art and standard SIA 248, the perimeter of a bathtub used for showering falls under a moderate to high exposure zone. The wall waterproofing must rise at least twenty centimetres above the highest shower head, or at least two metres above the bottom of the tub. The side walls receive waterproofing to a minimum width of twenty centimetres beyond the edge of the sanitary fixture.
Is it necessary to waterproof the entire floor of a private bathroom without a floor drain?
In sanitary rooms without a floor drain, standard SIA 248 does not require waterproofing across the entire surface of the room. However, waterproofing remains mandatory within the footprint of water splashes, particularly under the shower and in the immediate vicinity of the bathtub. On the other hand, the client may contractually require full floor protection. In this case, a peripheral upstand of at least one hundred millimetres is applied to all walls.
How should a liquid waterproofing be correctly connected to a plumbing pipe emerging from a partition?
The wall penetration represents a critical point of the under-tile assembly. The tiler installs an elastic waterproofing collar adjusted to the outer diameter of the sleeve. This preformed piece is smoothed into the first fresh coat of liquid waterproofing product. The second coat completely covers the reinforcement mesh up to the watertight collar. This process ensures perfect continuity with the wall plane and prevents splash water from penetrating the core of the partition.
Texts and standards cited
- norme SIA 248Bonded tile and slab finishes
- norme SIA 118General conditions for the execution of construction work