Skip to content
Website
🧱 CFC 282Laying, layout, joints and lippageChapter 2 of 10 in the section

Lipper: tolerance, straightedge measurement, and the edge that catches the foot

This chapter provides the technical and methodological benchmarks for mastering lipping between adjacent tiles in accordance with SIA 248. You will learn how to accurately check steps using a straightedge and feeler gauge, choose appropriate levelling systems for large formats, and adjust tightening without detaching the adhesive mortar bed.

Key takeaways

  • SIA 248 sets the permissible lipping between two tiles based on the joint width.
  • A one-millimetre step on a rectified tile causes chipping and a tripping hazard.
  • Inspection is carried out using a rigid metal straightedge placed bridging the joint and a set of feeler gauges.
  • Wedge- or dial-based levelling systems guarantee flatness without drying out the adhesive ribs.

SIA 248 tolerances and instrumental check of the step

On a tiled floor, lipping refers to the vertical level difference measured between the upper edges of two contiguous tiles on either side of a joint. A displacement of just one millimetre constitutes a frequent non-conformity during work handover. For users walking barefoot or in socks, this protrusion forms an uncomfortable and sharp stop. Under the rolling of hard loads or cleaning carts, the protruding edge undergoes repeated impact stresses that inevitably cause chipping and flaking of the glaze or vitrified porcelain stoneware.

Lipping
Localized level difference between two adjacent edges along an assembly joint, distinct from the general flatness of the tiled surface.

SIA 248 governs permissible tolerances based on the design of the cladding, notably joint width and the nature of the tile edges. Contemporary fine porcelain stoneware slabs are predominantly rectified, with sharp, right-angled sawn edges and laid with narrow joints of two millimetres. The thinner the joint, the more the eye perceives the shadow cast by the lipping and the more the foot catches the relief. Normative values cover only the finished result and encompass both the intrinsic curvature tolerances of the ceramic material and the precision of the tiler's work.

Indicative lipping tolerances according to SIA 248
Tile type and edge finishWidth of executed jointMaximum permissible lipping
Rectified porcelain stoneware with sharp edges2.0 to 3.0 mm joint1.0 mm (recommended strict tolerance)
Standard pressed tile with softened edges3.0 to 5.0 mm joint1.5 mm
Terracotta or artisanal split stoneJoint greater than 5.0 mm2.0 mm (according to contractual agreements)

To substantiate a claim by the site management without room for dispute, measurement cannot rely on touch. Inspection is performed on cleaned tiling, free of grout residue. The reference tool is a straight metal straightedge made of bevelled hardened steel, or a rigid straightedge at least twenty centimetres long, placed perpendicular to the joint. The straightedge rests cantilevered on the higher tile. The clearance above the lower tile is then measured using a set of calibrated feeler gauge blades. The thickness of the gauge sliding with a greasy friction defines the exact value of the lipping.

Implementing levelling systems to guarantee flush alignment

The advent of so-called XXL formats (60x120 cm, 120x120 cm slabs or larger) has made levelling by simple tapping with a white rubber mallet impossible. Deformable adhesive mortar exhibits thixotropy that makes localized sinking unpredictable and generates a drying shrinkage phenomenon. During the evaporation of the mixing water, the adhesive bed undergoes volumetric contraction that pulls the tiles downwards heterogeneously. The use of a mechanical levelling system has become mandatory on these formats to lock the laying plane throughout the chemical setting process.

  1. Preparation and buttering-floatingApply the adhesive mortar using systematic buttering-floating in accordance with SIA 248, with a half-round or inclined-notch trowel on the substrate, and butter the back of the slab flat with the trowel to ensure total transfer without air pockets.
  2. Insertion of anchor clipsSlide the plastic bases under the tile into the fresh adhesive bed, approximately five to eight centimetres from each corner, then every thirty to forty centimetres along the edges. Avoid positioning a wedge right at the intersection of joints so as not to crush the edges.
  3. Placement of the contiguous slab and tighteningFold the adjacent tile down against the spacer crosses. Insert the bevelled wedges into the slot of the clips using a clamping pliers adjusted to the force stop, or screw on the rotating dials. Tightening must bring the two surfaces onto a rigorously identical plane without forcing to the point of breaking the plastic.
  4. Immediate inspection and check for voidsCheck flush alignment by finger and straightedge immediately after tightening. Tap the slab lightly with a tiler's mallet to expel air and crush the ridges without detaching the adhesive from the underside.
  5. Mechanical breakage after hardeningWait for complete hardening of the adhesive mortar (at least twenty-four hours depending on ambient temperature). Strike the upper part of the clips sharply with a mallet or iron-shod foot, strictly in the longitudinal axis of the joint to guarantee a clean break at the predetermined break point flush with the base.

Two major technologies are shared across construction sites in western Switzerland: bevelled flat wedge systems pushed by a notched pliers and systems with screwed dials or knurled nuts. The flat wedge device offers superior and linear vertical pulling force, ideal for straightening the slight bow of thick rectified slabs. The screw-on model is perfectly suited for large wall tiles and delicate or polished surfaces, as it applies axial downward pressure without risk of scratching the visible surface. In all cases, the wedges and dials are reusable, only the disposable clips remain embedded under the joint.

Inherent curvature of porcelain stoneware and bonding pattern: preventing lipping

Lipping between tiles does not solely stem from the substrate or a lack of care. Large porcelain stoneware formats exhibit an industrial manufacturing bow linked to thermal shrinkage during firing. The center of the slab thus frequently exhibits a camber relative to its edges. If the setting plan imposes offset joints at the middle of the contiguous tile, the tiler confronts the high point of this bow with the end edges of the neighbouring piece. On rectified tiles with sharp edges without chamfers, the slightest displacement of one millimetre becomes aggressive under the bare foot, bumps against soles, and exposes the ceramic to premature chipping during impacts.

To respect SIA 248 tolerances, the tiler adapts the bonding pattern from the setting plan study. Fifty percent offset laying, or running bond, must be excluded on extra-long tiles, especially wood-effect planks exceeding sixty centimetres. The technique requires straight-joint laying or an offset limited to a third, or even a quarter of the slab. This choice keeps the central bow away from the low points of the adjacent element, reducing the structural height difference even before the self-levelling wedges intervene.

Sensitivity to lipping according to bonding pattern
Bonding patternTypical formatsStep riskPreventive measure
Straight joint laying60 × 60 to 120 × 120 cmLowIntersection control with gauge and cross blocking
1/3 or 1/4 offset laying20 × 120 cm planksModerateBow distancing, careful buttering-floating
Half-tile laying (to be excluded)Lengths > 60 cmCriticalDiscouraged pattern: cumulative curvature tolerances
Unrectified pressed edgesStandard formatsLowFactory rounding softens the step and absorbs the relief

Instrumental verification and management of sharp edges before setting

Levelling inspection is carried out continuously during the open time of the adhesive. Visual assessment alone is misleading: grazing light from a large bay window or spotlights creates shadows that accentuate or conceal steps between tiles. The tiler checks the edges with a rigid bevelled metal straightedge placed bridging the joint, combined with a calibrated feeler gauge. Any abnormal friction under the straightedge signals an out-of-tolerance step that must be corrected immediately on fresh mortar, as long as the laying bed retains its plasticity.

  1. Tactile and instrumental inspectionAs soon as the tile is inserted, pass the pad of the finger and the straightedge over the joint line to detect any obstruction before locking the wedges.
  2. Adjustment on fresh mortarIf the lipping measured with the gauge exceeds the SIA 248 tolerance, lift the tile, correct the adhesive combing, and re-beat the slab.
  3. Controlled wedge tensionAdjust the clamping pliers to align the edges without exerting excessive tension that risks breaking the ceramic or lifting the neighbouring tile.
  4. Disassembly after hardeningWait for complete setting of the adhesive before removing the plastic bases with a white rubber mallet, with a sharp blow in the axis of the joint.

Once the adhesive mortar has hardened, any attempt to catch up with a prominent edge by grinding or surfacing is prohibited on glazed porcelain stoneware. Abrasion destroys the vitrified surface layer, opens the porosity of the body, and produces an indelible matte stain that traps dirt. On natural stone or full-body stoneware, local sanding distorts optical reflection and modifies the slip-resistant texture. In the presence of non-compliant lipping observed during handover according to SIA 118, the only permissible intervention consists of cutting the joints with a diamond blade under extraction, removing the slab with a gouge without touching neighbouring edges, and redoing the bonding. This rigor ensures a flat, durable floor that is safe against tripping.

Management of non-conformities: joint inspection record, limits of sanding, and tile replacement

When the adhesive mortar has hardened and an edge catches the foot, disputes often arise during the joint inspection before work handover. To move beyond subjective assessment, the team leader or site manager carries out a rigorous check. According to SIA 248, checking lipping requires setting up a rigid straight straightedge placed bridging the joint and inserting a set of calibrated feeler wedges or gauges. If the measured step exceeds the limit set by the standard for the executed joint width, the lipping constitutes a proven execution defect.

Faced with the finding of a protruding edge, the classic mistake is to attempt localized sanding. On porcelain stoneware, whether glazed or full-body, any attempt at diamond disk grinding irremediably destroys the original surface structure, alters the color, opens microporosities to dirt, and modifies the gloss under grazing light on the floor. This empirical practice is to be avoided. Only unpolished natural stone or honed limestone allows smoothing by sanding and reprofiling with fine grit, provided the homogeneous appearance of the batch is maintained.

  1. Joint routingEmpty the grouting mortar over the entire thickness of the incriminated tile using a diamond oscillating blade, ensuring never to chip the intact peripheral edges.
  2. Decompression and removalMake diagonal cuts with the diamond disk in the center of the tile with integrated extraction, then detach the ceramic fragments with a fine chisel, always working from the center towards the joint.
  3. Base renovationChisel out the old hardened adhesive mortar down to the clean substrate, preserving the integrity of the screed and any waterproofing applied beneath the tiling.
  4. Re-laying under levellingRe-apply a deformable adhesive mortar in double-gluing, re-insert the new tile, and tighten levelling wedges resting on adjacent tiles to guarantee perfect flush alignment before hardening.

To prevent any dispute during handover according to SIA 118, record each disputed measurement on a joint inspection record form. Since replacing a sealed tile requires disproportionate intervention time compared to the initial laying time, the meticulous adjustment of self-levelling dials and systematic finger and gauge checks during laying remain the only economic guarantees.

Frequently asked questions

What is the maximum permissible lipping value according to SIA 248?

SIA 248 defines permissible tolerances based on joint width and the nature of the tile edges. For rectified tiles laid with fine joints of less than three millimetres, the flush tolerance between two adjacent edges is generally limited to one millimetre, to which the intrinsic flatness tolerance of the product is added. Beyond that, the edge creates an abnormal step, exposing the material to chipping and tripping.

How to precisely measure lipping during a site dispute?

The official method relies on using a rectified metal straightedge placed bridging the incriminated joint. The operator inserts calibrated feeler gauges under the straightedge, directly at the recessed edge, to record the deviation to the tenth of a millimetre. This instrumental check is conducted jointly with the site management to record objective values in the minutes, in accordance with the rules of SIA 118.

Do spacer and wedge levelling systems prevent all lipping?

These mechanical systems effectively correct height differences and keep slabs coplanar during the setting of the adhesive mortar. However, they do not eliminate the original warping of porcelain stoneware tiles or substrate flatness defects. Excessive tightening can also empty the adhesive bed under the edges. The device must always be combined with careful buttering-floating and methodical beating.

Why is sanding a protruding edge prohibited on porcelain stoneware?

Diamond grinding definitively alters the glaze layer or surface vitrification of the body. This abrasion destroys stain resistance, opens porosities that blacken with use, and creates a matte zone highly visible in grazing light. Unlike certain massive natural stones, porcelain stoneware cannot be rectified after laying. In case of proven non-conformity, dismantling and replacing the tile is necessary.

Texts and standards cited

  • SIA 248Laying of tiles and natural and artificial stone coverings, execution requirements and tolerances
  • SIA 118General conditions for the execution of construction work, inspection of the work, and notice of defects

In the same section