Skip to content
Website
🧱 CFC 282Laying, layout, joints and lippageChapter 8 of 10 in the section

Do not slip: slip resistance class per room, barefoot and cleanability

This chapter details the slip resistance criteria applicable to ceramic finishes according to standard SIA 248 and Swiss accident prevention guidelines. You will learn to differentiate the requirements for barefoot or shod areas, identify the required classes for each room, and find the essential balance between slip resistance and daily ease of maintenance on your construction sites.

Key takeaways

  • Wet barefoot areas require a specific classification separate from traffic zones with shoes.
  • Installing polished porcelain stoneware in a shower tray creates an unacceptable risk of falling.
  • High roughness guarantees grip but traps grease, limescale and greatly complicates maintenance.
  • Standard SIA 248 governs the specification of surfaces to reconcile user safety and cleanability.

Distinguish between shod and barefoot areas to determine required grip

The planning of ceramic floor coverings requires a fundamental distinction between areas walked on with shoes and surfaces intended for barefoot walking. In Switzerland, standard SIA 248 refers to technical safety requirements against falls on the same level, in harmony with the recommendations of the Swiss Accident Prevention Bureau. A common mistake is to apply industrial slip resistance ratings to residential or communal wet rooms without checking for a continuous water film.

For areas traversed with shoes, slip resistance is assessed according to classes R9 to R13. An apartment corridor or a dry living room is generally satisfied with an R9 class. On the other hand, an entrance hall exposed to rainwater or a professional kitchen requires minimum values of R10 or R11, often supplemented by a displacement volume to evacuate fluids under the sole.

Wet rooms where people walk barefoot correspond to a completely different scale, classified from A to C. Water mixed with soapy residue radically alters the dynamic friction coefficient. A rectified, polished or satin-finished porcelain tile behaves acceptably when dry, but turns into an ice rink as soon as it receives a soapy water film. Installing a smooth finish in a walk-in shower constitutes a serious technical fault that directly exposes the user to a fall.

Minimum recommended slip resistance classification by room type in Switzerland
Room designationWalking environmentMinimum required classDrainage requirement
Living room, bedrooms, dry circulation areasShodR9None
Building entrance, external access airlockShod with moistureR10Optional
Professional kitchen, sculleryShod with fatty substancesR11 to R12V4 to V6 essential
Bathroom (excluding shower area)Barefoot (dry or temporarily wet floor)Class A (or R10)None
Walk-in shower, pool bottomBarefoot (permanent water and soap)Class B (or R11)Not required if slope complies
Access stairs to a submerged poolBarefoot underwaterClass CStructured surface

Manage the technical compromise between anti-slip roughness and cleanability

Increasing the anti-slip class is achieved through physical reliefs, micro-asperities or the application of abrasive grains before firing. While these characteristics guarantee water evacuation and maintain skin contact, they proportionally increase the mechanical fouling of the tile. Limescale particles, body soap residue and cleaning sludge anchor themselves in the surface texture, making ordinary washing ineffective.

On a surface classified as R11 or Class B/C, the use of a traditional cotton mop is prohibited on site as well as during operation: the fibres fray on the mineral micro-ridges and leave stubborn lint in the recesses. The tiler must inform the site management of the maintenance constraints imposed by a slip-resistant floor, failing which the work may be deemed defective a few weeks after handover.

  1. Choice of joint gauge and jointingPrefer small-format mosaic (e.g. 5x5 cm) in showers: the tight network of cement or resin joints provides mechanical grip without requiring a rough glaze, greatly facilitating tile maintenance.
  2. Rigorous end-of-construction cleaningCompletely remove the cement film with a suitable buffered acid cleaner and a stiff nylon brush. A residual film on an R11 surface durably retains future dirt.
  3. Selection of operational cleaning productsBan film-forming detergents, waxes and over-fatty products that fill the micro-texture and annihilate the slip-resistant properties of the ceramic surface.
  4. Mechanical maintenance equipmentPrescribe washing with a soft brush or active microfiber, combined with a rubber squeegee to dry the relief without letting limescale water stagnate.

Allocation of slip resistance classes according to the destination of rooms

Standard SIA 248 governs the installation of tiled finishes and mandates compliance with operational safety requirements, supplemented by the guidelines of the Accident Prevention Bureau. The fundamental distinction is established between surfaces walked on with shoes, graded from R9 to R13 with possible discharge volumes V, and wet areas frequented barefoot, classified into groups A, B or C. A frequent assessment error on site consists of laying a textured-looking tile without checking its actual certification on an inclined lubricated plane. In a walk-in shower area, the simultaneous presence of water and surfactants such as soaps or shampoos drastically lowers the dynamic friction coefficient. Installing a polished or simply smooth porcelain stoneware tile in this volume constitutes an immediate accident risk for the user.

Grip requirements per room according to destination and mode of use
Room designationConditions of useShod feet (R)Barefoot (A-B-C)
Residential apartment building entrance hallExternal rainwater ingress, regular pedestrian trafficR10Not applicable
Rental apartment or condominium kitchenOccasional splashes of water and greaseR9 or R10Not applicable
Professional or communal kitchenContinuously greasy floors, repeated jet washingsR11 to R12 with V4Not applicable
Private bathroom (excluding shower footprint)Residual water drops, mixed trafficR10Class A
Walk-in shower and tiled receiverContinuous flow of soapy water on a sloped floorR11Class B (Class C in nursing homes)
Exposed outdoor balcony and loggiaAtmospheric humidity, driving rain, frostR11Not applicable

For level-access showers without steps, the tiler must resolve the conflict between the flatness required for drainage and mechanical grip. The use of large rectified formats at the bottom of the shower limits joints but requires a tile intrinsically certified as class B or R11, obtained by factory micro-structuring. Conversely, the use of mosaic or small ceramic modules offers mechanical grip reinforced by the tight mesh of the joints: the interlocking effect under the toes partially compensates for the lower intrinsic roughness of the tile, while facilitating the shaping of slopes towards the channel or central drain.

Implementation of joints and maintenance protocol for rough surfaces

Increasing slip resistance radically modifies the behaviour of the tile during cleaning operations. A structured tile classified as R11 or group B features microporosities, studded reliefs or protruding mineral grains that mechanically trap soil. Passing a traditional textile mop over such a surface proves counterproductive: the fibres fray on the asperities and leave textile debris in the recesses. Body oils and limescale deposits become progressively embedded in them. If users employ household detergents enriched with waxes or super-fatting agents like black soap, these products saturate the microscopic relief, creating a continuous greasy film that totally neutralises the initial grip.

Jointing constitutes the final critical step to make the work durable without degrading its cleanability. In walk-in showers and high-traffic wet rooms, the use of an improved cementitious joint mortar with high abrasion resistance and reduced water absorption, or an epoxy reactive resin-based mortar, is essential to prevent mould encrustation. The tiler must take care during the washing phase after installation: excessively hollowing out the joint creates water retention areas conducive to the formation of a slippery biofilm. Finally, any residue of cement film or dried epoxy in the reliefs of a rough tile alters its texture irreversibly and permanently traps operational dirt.

Management of slip disputes and corrective measures on completed work

When a smooth or polished finish is mistakenly laid in a walk-in shower or around a pool perimeter, the risk of slipping becomes critical from the very first use with soapy water. The tiler who identifies an insufficient grip class on execution drawings sends a written notice to the site management before any ordering or execution, referring to the requirements of standard SIA 248 and the safety guidelines of the Accident Prevention Bureau. When the work is already completed and the client or operator observes unacceptable slipperiness, opening a contradictory procedure is mandatory to record the state of the premises and verify the conformity of the installed material against the transmitted technical datasheets.

  1. Contradictory friction measurementInvolve a neutral body to quantify the slip coefficient in situ, in dry and wet conditions, in accordance with the room's usage requirements.
  2. Determination of contractual responsibilitiesAccording to the framework of standard SIA 118, analyse whether the failure stems from an architectural choice imposed despite warnings or a supply error by the tiler.
  3. Complete reconstruction of the wet areaRemove the disputed tiling, renew the waterproofing under the tiling and install structured tiling or mosaic offering the required mechanical relief.

When the dispute concerns stubborn fouling caused by a highly anti-slip surface, the expert assessment focuses on the maintenance plan. The tiler provides an operating manual detailing the use of specific alkaline detergents and appropriate brushes, ruling out cotton mops that fray on abrasive grains. If the prescribed roughness makes the use of the premises intolerable for the operator, any subsequent aesthetic modification must be the subject of a written agreement releasing the artisan from any liability related to a potential drop in floor grip.

Frequently asked questions

A client demands a glossy large format in their walk-in shower. How do I formalise my refusal?

The tiler must send a reasoned written notice to the site management and the client before starting installation. By citing standard SIA 248 and the manufacturer's technical datasheets, the artisan specifies that the selected material does not have the required grip class for a wet barefoot area. If the client maintains their choice in writing, the contractor declines any contractual liability related to personal injury caused by slipperiness.

Why is the classic mop ineffective on rough tiling laid on the floor?

Textile fringes or cotton mops tear on the mineral asperities of a highly anti-slip tile. Fibres are torn off, catch on the grains and deposit a film of lint that retains dirt instead of evacuating it. To effectively maintain these surfaces without clogging the rough texture, one must use a rigid microfiber broom or a scrubber-dryer with cylindrical brushes coupled with a wet vacuum, rinsing thoroughly with clean water.

Can a rough cement joint compensate for the slipperiness of a smooth tile in a shower tray?

Using mosaic helps increase mechanical friction thanks to the high density of the joint network under the soles of the feet. On the other hand, multiplying wide joints on a smooth large-format tile never compensates for the lack of grip inherent to the material. As soon as the foot rests on a wet slab without relief, the water film causes a sudden slip. The tile itself must possess the appropriate slip resistance class.

How to remove the cement film without altering the anti-slip properties of porcelain stoneware?

End-of-construction cleaning on structured tiles requires an acid stripper adapted to porcelain stoneware, applied after saturating the joints with clean water to prevent their degradation. The product must act for a few minutes before energetic mechanical brushing using a nylon disc or brush. Complete suction of the residual slurry and a double neutralizing rinse with clean water guarantee the clearance of the microstructures necessary for the certified anti-slip performance of the tile.

Texts and standards cited

  • SIA 248Tiled finishes and flagstones laid in accordance with the rules of the trade
  • SIA 118General conditions for the execution of construction work, management of irregularity notices and work handovers

In the same section