Aller au contenu
Website
🎓 Trade guides 21 guides 5 sections

CFC trade training

Training and upskilling your teams, trade by trade: 21 Swiss construction CFC pathways, from structural work to finishes.

  • 21guides
  • 5sections
  • 562pages in other sections
  • 78hub tools

🧱 Structural work and building envelope 8

Structural work and building envelope

Masonry, Special Civil Works & Excavation: Certified CFC Training in Switzerland (6-Lesson Programme)

Master masonry & excavations (CFC 201). Swiss certified programme: SIA 118, OTConst, accepted codes of practice, and SUVA site safety.

Structural work and building envelope

Reinforced Concrete & Structural Construction: Swiss Certified CFC Training (6-Lesson Programme)

Master reinforced concrete and structural works with our Swiss CFC training. SIA 262 standards, SUVA safety rules, and real case studies.

Structural work and building envelope

Facade Scaffolding & Temporary Works: CFC Certified Training in Switzerland (6-Lesson Programme)

Master facade scaffolding erection with the CFC 212 course. SIA standards, OTConst, SUVA directives and safety on Swiss construction sites.

Structural work and building envelope

Timber Framing, Structures & Stud Framing (CLT): Certified CFC Training in Switzerland (6-Lesson Programme)

Master timber framing and CLT structures in Switzerland. Certified CFC 214 training: SIA 265 standards, OTConst safety, and exam prep.

Structural work and building envelope

Steel Construction & Composite Facades: Swiss CFC Certified Training (6-Lesson Programme)

Master CFC 215 steel construction and composite facades in Switzerland. Certified course: SIA 263 norms, SUVA safety and accepted codes of practice.

Structural work and building envelope

Lightweight Facades, Cladding & External Joinery: Swiss CFC Certified Training (6-Lesson Programme)

Master the installation of lightweight facades and joinery (CFC 221). Swiss certified training: SIA 331 norms, safety and best building practice.

Structural work and building envelope

Sheet-Metal Work, Roofing & Pitched Roofs: CFC Certified Training in Switzerland (6-Lesson Programme)

CFC 224 certified sheet-metal work and roofing training: 6 lessons to master SIA 232 standards, SUVA safety rules and the OTConst on Swiss sites.

Structural work and building envelope

Waterproofing Flat Roofs, Terraces & Underground Structures: Swiss CFC Certification (6-Lesson Programme)

Swiss CFC 226 waterproofing certification. Master SIA 271, SIA 272 standards and SUVA safety for flat roofs and tanking.

⚡ Electricity and low voltage 2

🌡️ Heating, ventilation and sanitary 3

🎨 Interior fittings and finishes 7

Interior fittings and finishes

Plastering, Suspended Ceilings & Drywalling: Swiss CFC Certification Course (6-Lesson Syllabus)

Swiss CFC 271 certified drywall and partition wall training. Master SIA 242 and SIA 181, the SEFRI ordinance, and OTConst site safety rules.

Interior fittings and finishes

Painting, Surface Treatments & Wall Coverings: Certified CFC Training in Switzerland (6-Lesson Programme)

Certified CFC 272 painting and coatings training in Switzerland: SIA 257 and SIA 118 standards, CLA, SUVA safety, and site management.

Interior fittings and finishes

Interior Joinery, EI30 Fire Doors & Fittings: Certified Swiss CFC Course (6-Lesson Syllabus)

CFC 273 certification programme in interior joinery, EI30 door sets and fittings. Master SIA 343, SIA 181 and Swiss VKF/AEAI fire protection rules.

Interior fittings and finishes

Building Metalwork, SIA 358 Guardrails & Light Metal Construction: Certified CFC Training in Switzerland (6-Lesson Programme)

Swiss CFC 274 certified programme in 6 lessons: SIA 358 guardrails, fine metalwork, ETA Option 1 anchors, health & safety, and Metalworking CLA.

Interior fittings and finishes

Floating Screeds, Heating Protocols & CM Testing (SIA 251): CFC Certification Course in Switzerland (6-Lesson Programme)

Swiss CFC 281 certification course: floating screed installation, CM moisture measurement per SIA 251, SIA 181 acoustic insulation, and SUVA safety.

Interior fittings and finishes

Tiling, SPEC Waterproofing & Natural Stone: CFC Certificate Training in Switzerland (6-Lesson Programme)

CFC 282 certificate training: SPEC waterproofing, SIA 248 standard, natural stone laying, SUVA safety and remediation management under SIA 118.

Interior fittings and finishes

Parquet, Wood Flooring, Moisture & Finishes: Swiss CFC Certification (6-Lesson Programme)

CFC 283 parquet installer certification in Switzerland: SIA 253, SIA 181, SUVA safety, finishing work CLA, and rework management.

🌳 Exterior fittings and landscaping 1

Other guide sections

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.