Cost per Kilometre Calculator for 3.5 t Vans, Trailers & RPLP Fee
Calculate the cost per kilometre of your 3.5 t vans and trailers, including the RPLP heavy vehicle fee.
Interactive tool
A Your vehicle
1 Type of vehicle
B Use and annual costs
C Legal check: licence and tachograph
6 Where do you drive?
Vehicle cost
- Cost price per kilometre
- Total annual cost
- Monthly cost
- Daily cost (based on 220 working days)
| Line item | Type | Annual amount (CHF) | Share of the total |
|---|
Interest on tied-up capital at 3.5% on the average value ((price + residual value) / 2). The daily cost divides the annual cost by 220 working days: an idle vehicle costs as much as a vehicle in use.
Legal verdict
- Driving licence
Texts applied: Drivers' Ordinance (OTR 1, RS 822.221, status as at 1 October 2026) art. 3 and 4; OAC art. 3 for the BE licence; RPLP tariff of the OFDF. Indicative information: the cantonal road traffic authority and the OFDF prevail.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="4.1"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
- XLSXPDF Equipment Fleet Cost Catalogue: 3.5 t Vans, Machines (SSE) & RPLP Buy, rent or lease, and the real hourly cost of your machines. See the file, its mini-tool and the pack →
- XLSXPDF Worker Expenses Reference: Meals, Kilometres & Travel by CCT Meal allowances, travel-time deductible, mileage allowance and the monthly expense report. See the file, its mini-tool and the pack →
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Why a 3.5-tonne site van really costs between 0.85 and 1.35 CHF per kilometre in Switzerland
The cost per kilometre site van Switzerland is not just fuel: a van that covers few kilometres costs more per kilometre than one that covers many, because depreciation, interest on capital and insurance keep running even when it stays at the depot. With the calculator's default values (CHF 52'000, 25'000 km per year), the cost price is 0.81 CHF per kilometre, i.e. CHF 20'168.75 per year. The range of 0.85 to 1.35 CHF per kilometre corresponds to a van covering about 13'100 to 23'300 km per year, which is the reality for many tradesmen's vehicles.
Complete breakdown of the fixed and variable costs of a company utility vehicle
The calculator adds up five annual items. The depreciation utility vehicle construction is straight-line: (purchase price − residual value) divided by the duration. Interest on tied-up capital is 3.5% of the average value, i.e. ((price + residual value) / 2) × 3.5%. Fuel is (kilometres / 100) × consumption × price per litre. To these are added liability (RC) / comprehensive insurance with the plate tax, and maintenance. For a truck over 3.5 t, the heavy vehicle fee (RPLP) is added as a sixth item.
| Line item | Type | Annual amount | Share of the total |
|---|---|---|---|
| Annual depreciation | Fixed | 8'800.00 CHF | 43,6 % |
| Interest on tied-up capital (3,5 %) | Fixed | 1'050.00 CHF | 5,2 % |
| Liability (RC) / comprehensive insurance and plate tax | Fixed | 2'800.00 CHF | 13,9 % |
| Fuel | Variable | 5'118.75 CHF | 25,4 % |
| Maintenance, tyres, servicing | Variable | 2'400.00 CHF | 11,9 % |
| Total annual cost | — | 20'168.75 CHF | 100 % |
Fixed costs (depreciation, interest, insurance: CHF 12'650.00) do not depend on mileage; variable costs (fuel, maintenance: CHF 7'518.75) follow it. Result: the lower the mileage, the higher the cost per kilometre.
| Annual mileage | Total annual cost | Cost per kilometre | Daily cost (220 days) |
|---|---|---|---|
| 10'000 km | 17'097.50 CHF | 1.71 CHF/km | 77.72 CHF |
| 12'000 km | 17'507.00 CHF | 1.46 CHF/km | 79.58 CHF |
| 15'000 km | 18'121.25 CHF | 1.21 CHF/km | 82.37 CHF |
| 20'000 km | 19'145.00 CHF | 0.96 CHF/km | 87.02 CHF |
| 25'000 km | 20'168.75 CHF | 0.81 CHF/km | 91.68 CHF |
| 30'000 km | 21'192.50 CHF | 0.71 CHF/km | 96.33 CHF |
| 40'000 km | 23'240.00 CHF | 0.58 CHF/km | 105.64 CHF |
Common mistake: forgetting depreciation and downtime in overheads
The most expensive mistake is to count only fuel, maintenance and insurance. At default values, these "out-of-pocket" costs amount to 0.41 CHF per kilometre, whereas the real cost is 0.81 CHF: forgetting depreciation and interest on capital underestimates the cost by almost half. Yet the van is bought again every five years, with the money that should have been set aside.
Downtime counts just as much: a vehicle costs 91.68 CHF per working day (220-day basis), whether it works or stays at the depot. This daily cost must be found in the price of your daywork jobs and in your overheads, just like the cost of a worker, which the worker real-cost simulator lets you calculate.
3.5 t van with site trailer: the Swiss rules on the BE licence and the tachograph (OTR 1)
The BE licence site trailer is compulsory as soon as the total weight of the van + trailer combination exceeds 3'500 kg (art. 3 OAC). A 3.5 t van towing a 2 t trailer therefore forms a 5.5 t combination that requires the BE licence, issued after a practical test; category BE thus covers a 7.0 t combination (3.5 t + 3.5 t). Below 3'500 kg, a trailer of more than 750 kg may moreover be hitched in category B only if it does not exceed the unladen weight of the towing vehicle.
Note on the text of the standard. The trailer rule 3.5t tachograph OTR 2 is often presented as a rule of the OTR 2. However, the OTR 2 (RS 822.222) covers drivers of light vehicles used to carry passengers. The tachograph of goods vehicles comes under the Drivers' Ordinance, the OTR 1 (RS 822.221, status as at 1 October 2026): this is what the tool applies, with its articles 3 and 4.
The vital craftsman exception: the 7.5-tonne rule and the 100 km radius (Art. 4 OTR 1)
The tachograph exemption 100 km radius craftsman is provided for in article 4 paragraph 1 letter k of the OTR 1, in force since 1 July 2026 (and not in the OTR 2). The ordinance does not apply to drivers of vehicles or vehicle combinations whose total weight does not exceed 7.5 t and which are used to deliver goods made by craft methods or to carry equipment or material that the driver uses in the exercise of his trade, under four cumulative conditions:
- the vehicle or combination weighs 7.5 t at most (permissible gross weight);
- it is used within a radius of 100 kilometres around the company's place of establishment;
- driving takes up no more than half of working time, on a weekly average;
- the transport is not carried out on behalf of others: only your own equipment, your own machines or your own goods are carried.
The calculator applies these four conditions: the "own equipment within a radius ≤ 100 km" box and the "driving at most half the time" box must be ticked, and the weight must not exceed 7.5 t.
When does the digital tachograph become strictly compulsory with a trailer?
Three rules fit in one sentence each. In Swiss traffic, the OTR 1 does not apply to a combination whose towing vehicle does not exceed 3.5 t (art. 4 para. 2 let. b): a 3.5 t van with its trailer therefore has no tachograph. A truck whose total weight exceeds 3.5 t is subject to it (art. 3 para. 1 let. a), except under the craftsman exception. And as soon as the van drives abroad with a trailer that brings the combination above 3.5 t, the digital tachograph becomes compulsory; since 1 July 2026, it is also compulsory in international transport for a vehicle of more than 2.5 t (art. 3 para. 1 let. abis).
| Situation | Licence | Tachograph |
|---|---|---|
| 3,5 t van on its own, trips in Switzerland | B | Not mandatory |
| 3.5 t van + trailer (5.5 t combination), journeys in Switzerland | BE | Not mandatory |
| Van + trailer (5.5 t), journey abroad, no exception | BE | Mandatory |
| Van + trailer (5.5 t), abroad, own equipment, 100 km, driving ≤ half the time | BE | Exempt (Art. 4 para. 1 let. k) |
| 7.5 t truck, own equipment, 100 km, driving ≤ half the time | C1 | Exempt (Art. 4 para. 1 let. k) |
| 7,5 t truck, full-time driving | C1 | Mandatory |
| 18 t truck, trips in Switzerland | C | Mandatory |
Indicative information prepared from the OTR 1 (RS 822.221) and the OAC. The cantonal road traffic authority remains competent to say whether a specific vehicle is subject to the tachograph.
Calculating the Performance-Related Heavy Vehicle Fee (RPLP 2026)
The calculation RPLP fee truck Switzerland 2026 follows a simple formula: kilometres driven × permissible gross weight in tonnes × rate per tonne-kilometre. The fee applies to motor vehicles and trailers of more than 3.5 t permissible gross weight that carry goods; for a combination, the permissible gross weights of the truck and the trailer are added together. A 3.5 t van with a trailer of 3.5 t or less is therefore not subject to the RPLP, since neither vehicle exceeds 3.5 t.
| Determining weight | Euro VI (2,39 ct./t-km) | Euro IV/V (3,26 ct./t-km) |
|---|---|---|
| 12 t | 7'170.00 CHF | 9'780.00 CHF |
| 18 t | 10'755.00 CHF | 14'670.00 CHF |
| 26 t | 15'535.00 CHF | 21'190.00 CHF |
| 40 t | 23'900.00 CHF | 32'600.00 CHF |
Official OFDF (Customs) rate per tonne-kilometre depending on the Euro standard
The RPLP is levied by the Federal Office for Customs and Border Security (OFDF) according to the vehicle's fee category. The rate was raised by about 5% on 1 January 2025 to compensate for inflation and applies for 2026:
| Euro standard | Fee category | Rate 2025 and 2026 | Until 31.12.2024 |
|---|---|---|---|
| Euro VI | 3 | 2,39 ct. | 2,28 ct. |
| Euro 0 to V (Euro 0-III and Euro IV/V) | 1 | 3,26 ct. | 3,1 ct. |
| Intermediate category (not used) | 2 | 2,82 ct. | 2,69 ct. |
| Electric / hydrogen | — | Exempt | Exempt |
Note on the figures. The rates of 2.28 ct. (Euro VI) and 3.10 ct. (Euro 0 to V) are those from before 1 January 2025; the official tariff has no rate of 2.60 ct.: Euro IV and V trucks are classed with Euro 0 to III in category 1. The tool applies the 2025 and 2026 rates. Electric vehicles remain exempt (the OFDF provides for the exemption probably until the end of 2028, as part of the development of the RPLP under discussion in Parliament): check the up-to-date situation on the OFDF website.
Frequently Asked Questions on the Cost of a Site Van, the Tachograph and the RPLP (FAQ)
1. What is the real cost per kilometre of a site van in Switzerland?
With the tool's default values (a van at CHF 52'000 depreciated over 5 years with CHF 8'000 residual value, 25'000 km per year, 10.5 L per 100 km at 1.95 CHF per litre, CHF 2'800 for insurance and plate tax and CHF 2'400 for maintenance), the annual cost reaches CHF 20'168.75: CHF 1'680.73 per month, 91.68 CHF per working day (220-day basis) and 0.81 CHF per kilometre.
The cost per kilometre depends mainly on mileage, because depreciation, interest on capital and insurance are spread over fewer kilometres when the van drives little. With the same parameters: 1.46 CHF/km at 12'000 km per year, 1.21 CHF/km at 15'000 km, 0.96 CHF/km at 20'000 km and 0.71 CHF/km at 30'000 km. The range of 0.85 to 1.35 CHF/km thus corresponds to a van covering about 13'100 to 23'300 km per year.
2. Do you need a tachograph and which licence for a 3.5 t van with a site trailer?
The BE licence is compulsory as soon as the total weight of the combination exceeds 3'500 kg (art. 3 OAC): a 3.5 t van towing a 2 t trailer is in this case. For the tachograph, the applicable text is the Drivers' Ordinance (OTR 1, RS 822.221), and not the OTR 2, which covers drivers of light vehicles used to carry passengers. In Swiss traffic, the OTR 1 does not apply to a combination whose towing vehicle does not exceed 3.5 t (art. 4 para. 2 let. b): no tachograph for a 3.5 t van with its trailer.
Outside Switzerland, a combination of more than 3.5 t is subject to it; a truck of more than 3.5 t is also subject to it in Switzerland. In both cases, the craftsman exception (art. 4 para. 1 let. k OTR 1, in force since 1 July 2026) exempts the vehicle or combination of 7.5 t at most that carries your own equipment or trade equipment, within a radius of 100 km around the company's head office, if driving takes up no more than half of the average weekly working time and if the transport is not carried out on behalf of others.
3. How is the RPLP calculated for a truck or a site trailer?
The RPLP is calculated as follows: kilometres driven × permissible gross weight of the combination in tonnes (the weights of the truck and the trailer are added together) × rate per tonne-kilometre. In 2026 the rate is 2.39 ct. for a Euro VI truck and 3.26 ct. for a Euro 0 to V truck; electric vehicles are exempt. Example for 25'000 km per year: an 18 t combination pays CHF 10'755.00 in Euro VI and CHF 14'670.00 in Euro IV/V; at 40 t, CHF 23'900.00 and CHF 32'600.00.
The RPLP applies to motor vehicles and trailers of more than 3.5 t permissible gross weight. A 3.5 t van with a trailer of 3.5 t or less is therefore not subject to it, whereas a trailer of more than 3.5 t is. The rates of 2.28 and 3.10 ct. still found in many documents are those from before 2025: the fee rose by about 5% on 1 January 2025.
Indicative information prepared from the Drivers' Ordinance (OTR 1), the OAC and the RPLP tariff of the OFDF; it replaces neither the opinion of the road traffic authority nor that of the OFDF.
