39 filesExcel · PDF · Word
The 39 free templates and files for the Swiss construction industry
Each file has its own page: an interactive mini-tool, the « Brut de chantier » pack to download and an expert guide to Swiss law and standards.
📑 Tenders & SIA 451 1
👥 Salaries, Social Charges & HR (RH) 2
📄 DOC 01
Hourly cost of a worker
The real cost of one worker-hour: gross salary, 13th month, holidays, employer contributions, productive hours and daywork rate.
XLSXPDF
📄 DOC 26
Meals, km & travel under the CCT
Meal allowances, travel-time deductible, mileage allowance and the monthly expense report.
XLSXPDF
⚖️ Contracts, Quotes & SIA 118 21
📄 DOC 03
Daywork reports & change orders
The daily daywork sheet to print and the monthly table of pending or signed daywork, with a deadline alert.
XLSXPDF
📄 DOC 06
SIA 118 acceptance report (PV)
Complete 7-page guide (PDF) and Word template. Acceptance of the work (réception des travaux): legal basis, deadlines, start of the warranties and of the surety, three report templates (no defects, minor defects, postponed acceptance) and three letters.
PDFDOCX
📄 DOC 07
Legal mortgage kit
Complete 8-page guide (PDF) and Word template. Registering the statutory mortgage lien of craftsmen and contractors (hypothèque légale): conditions, 4-month deadline, who the owner is, letter and application templates, list of documents.
PDFDOCX
📄 DOC 09
Notice of defects & duty to notify
Complete 7-page guide (PDF) and Word template. The contractor's duty to notify (devoir d'avis) before installation, the client's notice of defects (avis de défauts) after delivery, deadlines before and after 1 January 2026, the client's rights and four letters.
DOCXPDF
⚖️ DOC 10
Bankruptcy protection on site
Complete 7-page guide (PDF) and Word template. What to do when a subcontractor, the general contractor or the client shows signs of insolvency: security, withdrawal from the contract, bankruptcy, double payment and four letter templates.
PDFDOCX
⚖️ DOC 11
Fire on site & hot-work permit
Complete 7-page guide (PDF) and Word template. Who bears the loss of the work in case of fire before the keys are handed over: insurance, a ready-to-fill hot-work permit, damage claim and letters to the insurer and the client.
PDFDOCX
⚖️ DOC 12
False self-employment & social contributions
Complete 6-page guide (PDF) and Word template. Protecting yourself when an "independent" subcontractor is reclassified as an employee or does not pay their contributions: criteria, liability, duty of care, a secured contract and letters.
PDFDOCX
⚖️ DOC 13
Cost overrun on a quote
Complete 5-page guide (PDF) and Word template. Lump-sum price, approximate quote or unit prices: who pays for the overrun, how to report it in time, notice, request for adjustment, the client's reply and a change-order form.
PDFDOCX
⚖️ DOC 14
Criminal liability & right to stop work
Complete 6-page guide (PDF) and Word template. What the owner, the site manager and the foreman risk, and how to stop dangerous work: written delegation of authority, « STOP » notice and letters.
PDFDOCX
⚖️ DOC 15
Unforeseen excavation conditions
Complete 5-page guide (PDF) and Word template. Rock, water, polluted materials, obstacles: who bears the ground risk, reservation clauses, immediate notice, written confirmation and three letters.
PDFDOCX
⚖️ DOC 16
Joint inspection report with neighbours
Complete 6-page guide (PDF) and Word template. Documenting neighbours' cracks before the works: owner's liability, invitation letter, joint inspection record, photographic survey and RC (liability) insurance.
PDFDOCX
⚖️ DOC 17
Termination & suspension for non-payment
Complete 7-page guide (PDF) and Word template. When the client cancels or does not pay: formal notice (mise en demeure) with a grace period, suspension, withdrawal from the contract, compensation spreadsheet and four letter templates.
PDFDOCX
⚖️ DOC 18
Warranty table
Complete 6-page guide (PDF) and Word template. Notice of defects (avis des défauts), warranty and limitation, before and after 1 January 2026: CO and SIA 118 table, three letters including the rejection of a late claim, evidence and procedure in case of dispute.
PDFDOCX
⚖️ DOC 19
Theft of materials & transfer of custody
Complete 8-page guide (PDF) and Word template. Materials delivered but not yet installed: who bears the theft, record of transfer of custody and storage, clause on advance payment for materials and template letters.
PDFDOCX
⚖️ DOC 20
Release for works without a permit
Complete 6-page guide (PDF) and Word template. Proving in writing that you warned the client that a permit is required: authorisation regime, duty to notify (devoir d'avis), protective clause for quotes, client's declaration and letters.
PDFDOCX
⚖️ DOC 21
Consortium agreement
Complete 6-page guide (PDF) and Word template. Bidding together as two without paying alone for the other's mistakes: full internal agreement, liability towards the client, default, exits, letters and end-of-lot report.
PDFDOCX
📄 DOC 24
Delays, penalties & bad weather
Complete 7-page guide (PDF) and Word template. Site delays, contractual penalties, bad weather, frost and heatwave: notice of impediment, extension of time, challenging a penalty, formal notice (mise en demeure) with a grace period and an Excel statement sheet.
DOCXXLSXPDF
📄 DOC 25
Subcontractors & LDet (posted workers act)
Complete 7-page guide (PDF) and Word template. A subcontracting agreement and the list of supporting documents to demand before letting a subcontractor on site: duty of care, wage-compliance clause, payment retention and letters.
DOCXPDF
📄 DOC 33
Shared-costs account (prorata) & general contractor (EG) clauses
Complete 7-page guide (PDF) and Word template. Challenging an abusive pro rata deduction and striking out the dangerous clauses of a general contractor agreement: procedure, 12 clauses to watch, letter templates and an Excel offset grid.
DOCXXLSXPDF
📄 DOC 34
Billing of price escalation
Complete 7-page guide (PDF) and Word template. Billing the cost increase between the quote and the end of the site: SIA 122, 123 and 124 methods, price variation clause, letters and a step-by-step spreadsheet.
XLSXDOCXPDF
📄 DOC 35
Joint and several surety
Complete 6-page guide (PDF) and Word template. Replacing the cash retention with a surety to recover your cash flow: amounts, comparison of retention / bank guarantee / surety insurance, content of the surety and three letters.
DOCXPDF
💼 Management, Fleet & Taxation 3
📄 DOC 04
Final statement & retention
Situations 1 to 12 cumulated, advance payments deducted, retention money Art. 150 SIA 118, pro rata and TVA (VAT) 8.1%.
XLSXPDF
📄 DOC 05
Profitability: planned vs actual
Hours sold versus hours clocked, planned materials versus invoices, subcontracting: the alert before the margin disappears.
XLSXPDF
📄 DOC 37
Costs of vans, machines & heavy-vehicle fee (RPLP)
Buy, rent or lease, and the real hourly cost of your machines.
XLSXPDF
🏗️ Engineering, Building Physics & Condominium Ownership (PPE) 7
📄 DOC 22
OTConst safety plan
The written safety plan on 2 pages, to be kept on site from day one.
DOCXPDF
📄 DOC 27
Buildings Programme subsidies
The indicative amounts by canton and the sheet to attach to the client's quote.
PDFXLSX
📄 DOC 28
U-value charts & dew point
The insulation thickness to install according to its lambda value, and the dew-point check.
PDFXLSX
📄 DOC 29
KBOB life-cycle assessment & carbon
Compare materials by CO2 emissions, embodied energy and UBP points.
XLSXPDF
📄 DOC 30
Public land & signage
The municipal application to occupy the public domain and the site signage diagrams.
PDFDOCX
📄 DOC 36
Permit or exemption by canton
Which works require a public notice procedure and which only a simple notification.
PDFXLSX
📄 DOC 38
SIA 181 acoustics & heat pump (PAC) noise
The requirements in decibels and the noise check of an outdoor heat pump.
PDFXLSX
📚 Standards by Trade (35 Chapters) 5
📄 DOC 08
SIA tolerances memo
A page to keep in the van: viewing distances, flatness under the 2 m straightedge, CM moisture of screeds.
PDF
📄 DOC 23
Asbestos/PCB & OLED waste
Which pollutants to look for before demolition and how to draw up the waste disposal plan.
PDFXLSX
📄 DOC 31
Excavation & underground utilities
The checklist for opening an excavation near buried utility lines.
PDFDOCX
📄 DOC 32
Bulking & trucks
From volume in place to tonnage and the number of trucks.
XLSXPDF
📄 DOC 39
As-built file (DOE) & maintenance instructions
Maintenance instructions to be signed at handover of the keys to protect the warranty.
DOCXPDF
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
