SIA 271 Tool 6.09 Online

Flat Roof Waterproofing Checker (SIA 271): Upstands, Slopes & Ballast

Checker for upturn heights (120 mm), minimum slopes (1.5%) & gravel/substrate ballast.

Interactive tool

Values from the specifications. Slope of 1,5 %, upstand of 120 mm, threshold of 60 mm (or 25 mm with a drainage channel): SIA 271 not consulted; the 60 mm threshold and the exception are confirmed by a Gebäudehülle Schweiz information sheet. The area served per outlet (120 m²) is an assumption of the tool.

A The flat roof

m²
ml
%
mm
mm
m²

SIA 271 checks and quantities

Ballast to hoist onto the roof
Big bags
Rainwater outlets
Minimum upstand area

Tonnage = area × weight per m² (range in the specifications); 1,0 t big bags rounded up to the next whole number; at least 2 outlets or 1 roof outlet and 1 overflow per catchment area.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.09"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 271 (waterproofing of buildings): the 3 mandatory dimensions (slope 1,5 %, upstand 120 mm and threshold 60 mm)

The SIA 271 standard on flat roof waterproofing, upstand height 12 cm rests on three dimensions that the tool checks. The minimum flat roof slope of 1,5 % under SIA 271 is 1,5 % (15 mm per metre): below that, water stagnates and the membrane ages faster. The waterproofing upstand against a parapet or wall rises at least 120 mm (12 cm) above the protective layer or gravel. At the threshold of a French window, the upstand is at least 60 mm.

The three mandatory dimensions of a flat roof
DimensionMinimumTool example
Slope of the substrate1,5 % (15 mm/m)1,8 %: compliant
Upstand above the protection120 mm120 mm: compliant
Upstand at the French window threshold60 mm60 mm: compliant

Note on the text of the standard. These three dimensions are those of the specifications. SIA 271 (2021 edition, SN 564271:2021) is a paid standard, not consulted. A fact sheet from Gebäudehülle Schweiz confirms the 60 mm dimension at the threshold, the exception below 60 mm (SIA 271 clause 5.2) and a minimum of 1,5 % that depends on the wearing layer; the 120 mm upstand was not found in a consultable source for walls and parapets.

How to reconcile the barrier-free threshold of SIA 500 (25 mm) with the waterproofing safety of SIA 271 (drainage channel mandatory)

The French window threshold on a terrace SIA 271 SIA 500 60 mm is a known conflict: standard SIA 500 (barrier-free construction) requires a threshold of at most 25 mm so that a wheelchair can pass, whereas the waterproofing requires 60 mm against rising water. The reconciliation involves a drained grated channel in front of the door and the compensatory measures of SIA 271 (roof overhang, slope, drainage): only this arrangement permits a lowered threshold. The tool distinguishes three cases: compliant threshold (at least 60 mm), conditional lowered threshold (at most 25 mm, with channel) and non-compliant threshold (in between). For the other accessibility dimensions, see the SIA 500 standard configurator.

Calculating the weight and tonnage of the ballast of a flat roof (round gravel 16/32 vs green roof SIA 312)

The calculation of the tonnage of round gravel on a flat roof, 5 cm is the product of the area and the weight per m²: 85 to 90 kg/m² for 5 cm of washed round gravel 16/32. The extensive green roof with substrate SIA 312 (standard SIA 312 on roof greening) weighs more, because the substrate is saturated with water. For the roof in the example (180 m²):

Weight, tonnage and big bags according to the type of protection
ProtectionWeight per m²Tonnage for 180 m²1,0 t big bags
1. Washed round gravel 16/32 (min. thickness 5 cm — approx. 85 to 90 kg/m²)85 to 90 kg/m²15,3 to 16,2 t17
2. Extensive greening SIA 312 (thickness 8 to 10 cm — approx. 110 to 130 kg/m² saturated with water)110 to 130 kg/m²19,8 to 23,4 t24
3. Concrete slabs on pedestals 50x50x4 cm (~95 kg/m²)95 kg/m²17,1 t18
4. Bare roof (slate-finished bituminous membrane or synthetic FPO/EPDM, fixed/bonded)0 kg/m²——

Big bags are counted on the maximum tonnage. Before hoisting the ballast, check the load-bearing capacity of the slab with the engineer. ⚡ Price your waterproofing in Soumission

The weights per m² are those of the specifications (gravel 85 to 90, greening 110 to 130, slabs about 95 kg/m²), not verified; SIA 312 was not consulted.

Rainwater drainage on a flat roof: why the emergency overflow (scupper) is mandatory

A flat roof fills with water if the main drainage clogs: a leaf or ice in the outlet is enough. An emergency overflow (scupper) then discharges the surplus before the water load exceeds what the structure can bear. The specifications require at least 2 outlets, or one roof outlet with an overflow, per catchment area. For the roof in the example (180 m², one roof outlet per 120 m² according to the tool's assumption): 2 roof outlets and 1 overflow, i.e. 3 outlets.

Note on the text of the standard. The area served by each roof outlet (120 m²) is an assumption of the tool, aligned with the DN 100 of the specifications of tool 6.11; it is not provided by the specifications of this tool. The number and diameter of the outlets are calculated on the local rainfall intensity: the engineer's design and SN 592000 prevail.

Frequently Asked Questions about Flat Roof Waterproofing, Upstands and Ballast (FAQ)

1. What minimum slope for a flat roof under SIA 271?

The tool uses a slope of at least 1,5 % (15 mm per metre), the value in the specifications. A fact sheet from Gebäudehülle Schweiz specifies that the minimum slope depends on the wearing layer, which is consistent with a minimum of 1,5 %. A slope of 1,8 %, as in the example, meets this minimum.

A steeper slope drains water better and limits puddles. SIA 271 (2021 edition) was not consulted: the waterproofer and the engineer confirm the value for the project.

2. What waterproofing upstand height and French window threshold height must be respected?

The specifications require an upstand of at least 120 mm above the protective layer (gravel or covering), and of at least 60 mm at the threshold of a French window. A lowered threshold down to 25 mm, compatible with standard SIA 500 (barrier-free construction), is permitted only with a drained grated channel and compensatory measures. The Gebäudehülle Schweiz fact sheet confirms that, below 60 mm, the exception requirements of SIA 271 (clause 5.2) must all be met.

The 120 mm upstand is a value from the specifications: the text of SIA 271 was not consulted.

3. How much does the ballast of a flat roof weigh: gravel or green roof?

Washed round gravel 16/32 over 5 cm weighs about 85 to 90 kg/m²; an extensive greening of 8 to 10 cm 110 to 130 kg/m² saturated with water; slabs on pedestals of 50 × 50 × 4 cm about 95 kg/m². For 180 m², the gravel comes to 15,3 to 16,2 t, i.e. 17 big bags of 1,0 t, and the greening to 19,8 to 23,4 t.

Check the load-bearing capacity of the slab with the engineer before ballasting. The weights are those of the specifications.

Indicative information prepared from the tool's specifications and a professional fact sheet; it replaces neither SIA 271 nor the waterproofer's design.