Parquet Installation Checker: Underfloor Heating (Rλ), CM Moisture & SIA 253 Standard
Checker for heated-screed compatibility, thermal resistance R_lambda & CM moisture.
Interactive tool
Values from the specifications, SIA 253 not consulted. Thermal resistance of parquet floors and underlays, adhesive (1,2 kg/m²), offcuts (7 %) and skirting boards (5 %): specifications. The limit of 0,15 m²K/W for the whole floor covering, underlay included, is confirmed by manufacturers. CM moisture thresholds: those for anhydrite (0,5 / 0,3) are confirmed by a German table; those for cement under parquet (1,8 / 1,5) come from the specifications, are stricter than German sources (2,0 / 1,8), and have not been verified in Switzerland. Primer (0,15 kg/m²): assumption of the tool.
A Parquet: underfloor heating, screed moisture and quantities
Verdicts and quantities
- Total thermal resistance R
- Parquet to order
- Elastic adhesive MS polymer or PU
- Primer
- Skirting boards and perimeter gap
R total = R of the parquet + R of the underlay (0 for glued installation); at most 0,15 m²K/W on underfloor heating. Perimeter expansion gap: 10 mm. With floating installation, there is neither adhesive nor primer.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.24"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
- PDF Site Memo: Tolerances in SIA Standards A page to keep in the van: viewing distances, flatness under the 2 m straightedge, CM moisture of screeds. See the file, its mini-tool and the pack →
- DOCXPDF As-Built Documentation (DOE) & Maintenance Log Pack (SIA 469) Maintenance instructions to be signed at handover of the keys to protect the warranty. See the file, its mini-tool and the pack →
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Standard SIA 253 (Wood floor coverings): the CM moisture thresholds (1,5 % and 0,3 %) that every parquet fitter must measure in writing
The standard SIA 253 on parquet laying, moisture of anhydrite and cement screed requires checking the screed moisture before gluing or laying a parquet; the measurement is made with the carbide moisture meter and it is customary to record it in writing. The thresholds adopted by the specifications are:
| Screed | Without underfloor heating | With underfloor heating |
|---|---|---|
| Cement (CT) | 1,8 % CM | 1,5 % CM |
| Anhydrite (CAF) | 0,5 % CM | 0,3 % CM |
With the 1,4 % CM measured in the example, the substrate is fit for laying on a heated cement screed (maximum 1,5 % CM). For drying and heating up the screed, see the SIA 251 screed tool.
Note on the text of the standard. SIA 253:2024 actually covers «floor coverings in wood, plastic, textile, linoleum, elastomers, laminates and cork»: the specifications and the title of this section mention only wood. The (paid) standard was not consulted, and the «ISP guidelines» cited by the specifications could not be found. The anhydrite thresholds (0,5 and 0,3 % CM) are confirmed by a table from the German parquet association. For a cement screed, German sources give 2,0 % CM without heating and 1,8 % CM with heating, more than the 1,8 and 1,5 % CM of the specifications: the stricter values of the specifications are kept and not verified in Switzerland.
Parquet on underfloor heating: why the thermal resistance Rλ must stay below 0,15 m2K/W (glued vs floating installation)
The maximum thermal resistance of parquet on underfloor heating 0.15 m2K/W limits the insulation that the covering opposes to the heat of the floor: beyond it, the heating water must be hotter for the same surface temperature, which degrades efficiency. The limit of 0,15 m²K/W applies to the whole build-up, parquet and underlay included (Rtot = Rparquet + Runderlay).
The glued parquet vs floating installation on underfloor heating differ in the underlay: a fully glued parquet has none, whereas a floating parquet lies on an acoustic underlay whose resistance is added. For each parquet of the specifications:
| Parquet | Fully bonded | Floating on special underlay (0,02) | Floating on cork (0,055) |
|---|---|---|---|
| Engineered 2-ply parquet, special for heated floors (thickness 10–11 mm, R ≈ 0,075 m²K/W) | 0,075 (compliant) | 0,095 (compliant) | 0,130 (compliant) |
| Engineered 3-ply parquet, standard (thickness 14 mm, R ≈ 0,11 m²K/W) | 0,110 (compliant) | 0,130 (compliant) | 0,165 (too high) |
| Solid oak parquet 15 mm (R ≈ 0,09 m²K/W) | 0,090 (compliant) | 0,110 (compliant) | 0,145 (compliant) |
| Thick solid parquet 22 mm (R ≈ 0,14 m²K/W) | 0,140 (compliant) | 0,160 (too high) | 0,195 (too high) |
| Laminate 8 mm (R ≈ 0,06 m²K/W) | 0,060 (compliant) | 0,080 (compliant) | 0,115 (compliant) |
Fully glued installation is recommended on underfloor heating. To size the heat production, see the heat pump and underfloor heating tool.
Note on the values. The limit of 0,15 m²K/W for the whole covering, underlay included, is confirmed by parquet manufacturers (including Bauwerk). The thermal resistances of the parquets and underlays are those of the specifications; the manufacturer's sheet prevails. The notation «Rλ» in the title is the thermal resistance in m²K/W (the specifications' title writes it in mathematical notation).
«Lively» wood species (beech, maple) vs stable ones (oak, walnut), 10 mm perimeter gap and room climate (40–60 % HR)
All species swell with the humidity of the air and shrink with dryness, but not to the same extent: beech and maple are reputed «lively», that is, more sensitive to variations in humidity, whereas oak and walnut are more stable. The perimeter expansion gap of 10 mm for parquet lets the parquet move along the walls: it is at least 10 mm and is hidden under the skirting board. The specifications assume a room climate of 40 to 60 % relative humidity.
The consumption of MS polymer PU parquet adhesive in kg/m2 is about 1,2 kg/m² for an elastic MS polymer or polyurethane adhesive. For 75 m² of glued parquet, with 7 % cuts: 80,25 m² of parquet to order, 90,0 kg of adhesive, 11,3 kg of primer and 71,4 lm of skirting (perimeter of 68 m, with 5 % cuts).
Note on the values. The distinction between lively and stable species is a general principle of the trade, not taken from the standard; the room climate of 40 to 60 % relative humidity and the 10 mm gap are those of the specifications, not verified in SIA 253. The adhesive (1,2 kg/m²), the cuts and the skirting are from the specifications; the primer (0,15 kg/m²) is an assumption of the tool. For glued resilient floors, see the levelling and resilient floors tool. ⚡ Price your parquet floors in Soumission
Frequently Asked Questions about Parquet, Underfloor Heating and Substrate Moisture (FAQ)
1. Why limit the thermal resistance of a parquet on underfloor heating to 0,15 m²K/W?
The more the covering resists the passage of heat, the hotter the heating water must be to obtain the same surface temperature, which degrades efficiency. The total thermal resistance, parquet and underlay included, must not exceed 0,15 m²K/W: an engineered parquet special for heated floors, fully glued, reaches 0,075 m²K/W, a 22 mm solid parquet 0,140 m²K/W, but a 3-ply engineered parquet laid floating on a cork underlay reaches 0,165 m²K/W and exceeds the limit.
The limit of 0,15 m²K/W, underlay included, is confirmed by manufacturers (including Bauwerk); standard SIA 253 («Floor coverings in wood, plastic, textile, linoleum, elastomers, laminates and cork», 2024 edition, paid) was not consulted. The R values of each parquet are those of the specifications: the manufacturer's sheet prevails.
2. What moisture content (% CM) before laying a parquet?
On a cement screed, the specifications require at most 1,5 % CM with underfloor heating and 1,8 % CM without heating; on an anhydrite screed, 0,3 % CM with underfloor heating and 0,5 % CM without. With 1,4 % CM measured, the substrate is fit for laying on a heated cement screed. The measurement is made with the carbide moisture meter, in writing.
The thresholds of 0,5 and 0,3 % CM for anhydrite are confirmed by a table from the German parquet association; for a cement screed, German sources give 2,0 % without heating and 1,8 % with, more than the 1,8 and 1,5 % of the specifications. The «ISP guidelines» cited by the specifications could not be found: the stricter values of the specifications are kept and not verified in Switzerland.
3. What quantities to allow for 75 m² of glued parquet: area, adhesive, primer and skirting?
With 7 % cuts, 80,25 m² of parquet must be ordered for 75 m² laid. The elastic MS polymer or polyurethane adhesive consumes about 1,2 kg/m², i.e. 90,0 kg, and the primer 11,3 kg; for a perimeter of 68 m, the skirting amounts to 71,4 lm with 5 % cuts. The perimeter expansion gap is 10 mm, hidden by the skirting.
The adhesive (1,2 kg/m²), the cuts and the skirting are those of the specifications; the primer (0,15 kg/m²) is an assumption of the tool. With floating installation, there is neither adhesive nor primer.
Indicative information prepared from the tool's specifications; it replaces neither standard SIA 253, nor the data sheet of the parquet and adhesive manufacturer.