Excel Catalogue of Equipment Fleet Costs: Machine Depreciation (SSE Type), 3.5 t Vans & RPLP Calculation

Buy, rent or lease, and the real hourly cost of your machines.

Interactive tool: Swiss road obligations and minimum daily rate for re-invoicing

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

XLSXPDF

Equipment Fleet Cost Catalogue: 3.5 t Vans, Machines (SSE) & RPLP

Buy, rent or lease, and the real hourly cost of your machines.

  • Comparison of buying, leasing and renting a van
  • RPLP calculation
  • Depreciation and internal hire grid for the fleet

Excel workbook (.xlsx) with formulas · Printable PDF document

1. The 5 components of the real cost of a site machine in Switzerland (SSE catalogue-type method)

The cost of a machine is not limited to its purchase price: it adds up depreciation, interest, repairs, insurance and the hours actually worked.

1.1 Why depreciation must be calculated on the real annual hours of use (400 to 800 h/year) and never on 2'000 theoretical hours

Depreciating a machine over 2'000 theoretical hours suggests an hourly cost that is too low. If the machine works only 400 to 800 hours a year, the annual cost (depreciation, interest on the capital tied up, repairs, insurance) is spread over far fewer hours. The workbook uses the real hours.

1.2 Grid of daily and monthly internal re-invoicing rates (mini-excavators, plate compactors, core drills, lasers, concrete mixers, work platforms, containers)

Our grid covers twelve machines (mini-excavator, excavator, dumper, plate compactor, roller, quick-assembly crane, telehandler, compressor, work platform, floor saw, laser) with value, depreciation period, annual days and hours, annual cost and daywork rate marked up by 15%. The values are orders of magnitude to be adapted to your fleet.

2. Managing the fleet of utility vans (3.5 t), site trailers and heavy-vehicle fee (RPLP)

A 3.5 t van with a trailer changes category as soon as the combination exceeds 3.5 t: licence, inspection and fee follow.

2.1 The trap of police checks on a 3.5 t Van + Trailer combination: axle load, BE licence and tachograph above 3.5 tonnes

The BE licence is required as soon as the total weight of the combination exceeds 3'500 kg (Art. 3 OAC). According to our sheets, a combination whose towing vehicle does not exceed 3.5 t has no tachograph in Swiss traffic; the craftsman's exception is governed by OTR 1. Check the text in force before setting off.

2.2 Calculation of the RPLP (performance-related heavy-vehicle fee) according to the OFDF emission category

The RPLP applies to vehicles over 3.5 t: kilometres driven × total weight × rate per tonne-kilometre according to emission category (for example 2.39 centimes for a Euro VI in our sheets). An 18 t truck driving 40'000 km thus pays about 17'208 CHF a year. Rates change: confirm them with the OFDF.

3. Frequently asked questions about invoicing equipment and the vehicle fleet (FAQ)

3.1 How do you invoice the wear of diamond bits and blades when core drilling or sawing on a daywork basis?

Diamond consumables are not included in the machine's hourly rate: invoice them in addition, per metre drilled or sawn, or as a percentage of the cost, and state this in the offer.

3.2 Is it better to buy outright, lease or rent by the day a machine that runs fewer than 60 days a year?

For a machine that works little, renting is often cheaper than buying, whose tied-up capital weighs on cash flow. Compare using the workbook: annual cost of buying versus daily rental × number of days.

3.3 In which case is a 3.5 t van towing a site trailer exempt from a tachograph in Switzerland?

According to our sheets, in Swiss traffic a combination whose towing vehicle weighs at most 3.5 t is exempt, and the craftsman's exception (strict conditions, including driving for at most half of the time) may apply. Check the current state of OTR 1 before deciding.

Keywords covered: calculation hourly cost site machine Switzerland excel · internal hire rate card site equipment SSE · depreciation mini-excavator work platform core drill plate compactor · mileage cost utility van 3.5t site Switzerland · rule trailer 3.5 tonnes tachograph BE licence · calculation RPLP fee construction truck OFDF.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.