OLED Art. 16 / OTConst Tool 6.02 Online

Asbestos Decision Tree (<1991), PCB & Construction Waste Calculator (OLED 200 m3)

Asbestos decision tree (<1991), PCB & 200 m³ OLED threshold.

Interactive tool

Indicative information. The pollutant diagnosis is carried out by a building diagnostician, the disposal concept is reviewed by the cantonal authority and the “Green / Orange / Red” category is this tool's classification, not an official Suva scale.

A Decision tree: building pollutants and disposal concept (Art. 16 OLED)

m³

Legal verdicts

Pollutants to identify before the works

    B Skip volumes and demolition tonnages

    m³
    m³
    m³
    m³

    Bulked volume in skip, tonnage and number of skips

    Bulked volume, tonnage and number of skips by demolition material
    Waste and disposal routeIn place (m³)Bulked (m³)TonnageSkips

    Bulking factor of 1.45 to 1.60, densities and disposal routes: customary values and values from the specifications, not verified. OLED landfill types: A, B, C, D and E; the canton sets the disposal route for each waste.

    Embed this calculator on a website page

    Paste this code into the page, or write [outil code="6.02"] in the content of a page on the site.

    📄 Files and templates linked to this tool (free)

    Move from calculation to full management

    Keep your references at hand, then automate them in your quotes, bids and final statements.

    ⚡ Automate this calculation in our ERP / Soumission software (Trial)

    Technical reference guide

    Art. 16 OLED and Art. 3 OTConst: when are the asbestos diagnosis and the waste disposal concept mandatory?

    Before demolishing or renovating a building, two separate obligations follow one another: identifying hazardous substances, which protects the workers (OTConst), and the waste disposal concept, which protects the environment (waste ordinance, OLED, RS 814.600). The mandatory asbestos diagnosis before works 1991 Switzerland sums up the rule of caution the tool applies: a building constructed before 1991 is suspect until a diagnostician has established otherwise. For a 1978 building with 240 m³ of waste, the tool answers: diagnosis mandatory, disposal concept mandatory.

    Note on the text of the standard. The text of the OTConst (as at 1 January 2024) cites no year of construction. Art. 3 para. 2 requires hazards to be identified and assessed as soon as the presence of asbestos or PCB is suspected and the necessary measures to be planned; art. 32 refers to this rule, requires workers to be informed of the results of pollutant diagnoses and work to be interrupted if a hazardous substance is unexpectedly found. The "before 1991" criterion is that of the specifications (asbestos ban in Switzerland in 1990-1991): a precautionary benchmark, not a quotation from the ordinance.

    The 2 triggering criteria in Switzerland: building constructed before 1991 or waste volume above 200 m3

    The waste disposal concept OLED art 16 200 m3 must be submitted to the cantonal authority with the building permit application in two cases: when site waste exceeds 200 m³ (unbulked volume, excavation material included), or when hazardous substances such as asbestos, PCB, lead or PAHs (HAP) are to be expected. At the end of the site, proof of compliant disposal is handed to the authority. The tool combines them:

    Diagnosis and disposal concept according to the year of construction and the waste volume
    Year of constructionWaste volumePollutant diagnosisDisposal concept (Art. 16 OLED)
    Before 1991Less than 200 m³MandatoryMandatory (hazardous substances expected)
    Before 1991More than 200 m³MandatoryMandatory
    1991 or laterMore than 200 m³Not required by the yearMandatory (volume)
    1991 or laterLess than 200 m³Not required by the yearNot required by the thresholds

    The threshold of 200 m³ and the content of the concept are verified in cantonal documents (Geneva, Neuchâtel, Bern) and in the enforcement guidance of the Federal Office for the Environment (OFEV); the canton may specify the form of the concept.

    The 4 building pollutants to identify: Asbestos, PCB (joints 1955–1975), Lead and PAHs (HAP) (tars)

    Identification of the building pollutants PCB HAP lead and of asbestos is entrusted to a building pollutant diagnostician, who takes samples and has them analysed. The four families the tool asks you to identify are:

    The four building pollutants to identify before demolition or renovation
    PollutantWhere is it found?
    AsbestosTile adhesives, joints, fibre-cement, sprayed coatings, resilient floors: banned in Switzerland since 1990-1991, present in older buildings.
    PCB (joints 1955–1975)Elastic façade and expansion joints installed between 1955 and 1975.
    LeadOld paints on wood, metal and façades.
    HAP (tars)Tars, asphalts and old bituminous mixes.

    For the works themselves, see the OTConst safety plan generator: the written plan of art. 4 must take into account the hazardous substances identified.

    CFST Directive 6503 of the SUVA: difference between Green, Orange works and Red asbestos removal in a confined zone

    The SUVA directive 6503 asbestos removal CFST deals with work involving asbestos. The law sets a clear threshold: asbestos removal work that releases a significant quantity of fibres into the air may only be carried out by an asbestos removal company recognised by the Suva (art. 82 OTConst), which must notify the site at least 14 days in advance (art. 86). Art. 82 para. 2 cites in particular sprayed coatings, floor, ceiling and wall coverings, tile adhesives, lightweight boards, fire barriers and insulation containing asbestos. The tool translates fibre release into three categories:

    Asbestos intervention categories in the tool's classification
    CategoryFibre releaseWhat the tool does
    GreenLow (dust-free removal of a strongly bonded material)Low fibre release: work without a recognised asbestos removal company, with basic protection measures and compliant disposal (the tool's classification, not official).
    OrangeMedium (minor work: drilling, limited removal)Minor work carried out by a trained company, with extraction fitted with an H filter (specifications; the CFST 6503 directive deals with this work in chapter 7.7 according to the Suva).
    RedHigh (demolition, sanding, friable material)Asbestos removal in a confined zone under negative pressure by a company recognised by the Suva (art. 82 OTConst), with notification to the Suva at least 14 days before the work (art. 86 OTConst).

    Note on the text of the standard. The "Green / Orange / Red" classification of the specifications was not found in this form in the CFST 6503 directive: it is the tool's classification, which makes "Red" coincide with the significant asbestos removal of art. 82 OTConst. The specifications speak of a "Suva-certified" company for Red and a "recognised trained company" for Orange; the ordinance speaks of companies recognised by the Suva for major work only (art. 82 and 83), and the tool writes "trained company" for Orange. Fibre-cement is not named in art. 82 para. 2. The Suva and the diagnostician decide each case.

    Sorting routes on site and OLED landfill types (Recyclable mineral materials, Type B landfill, Type E and UIOM waste-to-energy plant)

    The sorting of site waste skips wood scrap metal mineral starts on site: one skip per waste family, because a mixture costs more to dispose of than sorted waste. The OLED landfill types range from A (unpolluted excavation material) to E (site waste that cannot go to a type B landfill). Routes used by the tool for a 1978 building:

    Disposal route, bulked volume, tonnage and skips by demolition material
    WasteIn placeBulkingTrackBulkedTonnage10 m³ skips
    Reinforced concrete40 m³× 1,45Recovery as recycled concrete RC concrete58,0 m³96,0 t6
    Brick masonry30 m³× 1,50Type B landfill (inert mineral materials) or recovery as aggregates45,0 m³48,0 t5
    Demolition timber8 m³× 1,60Recovery of waste wood or UIOM incineration depending on the wood class12,8 m³4,4 t2
    Plaster / plasterboard (Fermacell)5 m³× 1,55Boards and solid plaster: type E landfill (rubble mixed with plaster: type B depending on the canton)7,8 m³4,5 t1
    Total83 m³123,6 m³152,9 t14

    With skips of 20 m³ instead of 10 m³, the number of skips falls to 8. OLED landfill types:

    • Type A: Unpolluted excavation and tunnelling material.
    • Type B: Inert mineral materials (mineral demolition meeting the limit values).
    • Type C: Stabilised, metal-bearing, inorganic and poorly soluble waste.
    • Type D: Incineration bottom ash and wood ash.
    • Type E: Site waste that cannot go to type B (solid plaster, plasterboard).

    Note on the text of the standard. Landfill types A to E are those of the OLED. The classification of boards and solid plaster as type E is that of Neuchâtel, and rubble containing plaster goes to type B in that canton: the exact route depends on the canton and the landfill. The densities and bulking factors (1.45 to 1.60) are customary values and values from the specifications, not verified. ⚡ Cost the demolition and skips in Soumission

    Frequently Asked Questions about Asbestos, Pollutants and Demolition Waste (FAQ)

    1. Is the asbestos diagnosis mandatory before works, and for which buildings?

    The OTConst cites no year of construction. Its art. 3 para. 2 requires the employer to identify and assess hazards as soon as the presence of asbestos or PCB is suspected; art. 32 refers to this rule, requires workers to be informed of the results of pollutant diagnoses and provides for work to be interrupted if a hazardous substance appears unexpectedly. The tool uses the 1991 date from the specifications (asbestos ban in Switzerland in 1990-1991): for a building constructed earlier, it concludes a diagnosis is mandatory before demolition or renovation. This diagnosis covers four pollutants: asbestos, the PCB in elastic joints installed between 1955 and 1975, the lead in old paints and the PAHs (HAP) in tars and asphalts.

    For a 1978 building, the tool answers "diagnosis mandatory". The year is a precautionary benchmark: the building pollutant diagnostician decides, and the cantons may require more.

    2. What is the 200 m³ threshold of the waste disposal concept (art. 16 OLED)?

    Art. 16 of the waste ordinance (OLED, RS 814.600) requires a disposal concept, to be submitted to the cantonal authority with the building permit application, when site waste exceeds 200 m³ (unbulked volume, excavation material included) or when hazardous substances such as asbestos, PCB, lead or PAHs (HAP) are to be expected. A proof of disposal is handed over at the end of the site. For 240 m³ of waste in a 1978 building, both triggers apply: the tool answers "concept mandatory".

    The skip calculation completes the concept: for 83 m³ of concrete, brick, wood and plaster, the bulked volume is 123.6 m³, i.e. 152.9 tonnes and 14 skips of 10 m³. Densities and bulking factors are customary, unverified values.

    3. Who may remove asbestos-containing tiles?

    It depends on the quantity of fibres the work can release. Significant asbestos removal may only be entrusted to a company recognised by the Suva (art. 82 OTConst), which notifies the site at least 14 days in advance (art. 86); the list in art. 82 cites tile adhesives in particular. The tool classifies work into three categories: Green (low fibre release), Orange (minor work by a trained company, with extraction fitted with an H filter) and Red (confined zone under negative pressure, recognised company). For a tile adhesive in a 1978 building, "significant" release gives Red, "medium" Orange and "low" Green.

    This classification is the tool's own, not an official scale: the Suva's CFST 6503 directive was not found in this form. Never break tiles yourself if the adhesive is suspect: have a sample analysed.

    Indicative information prepared from the OTConst, the OLED and the tool's specifications; it replaces neither a specialist's diagnosis nor the decisions of the Suva and the cantonal authority.