KBOB Life-Cycle Assessment & Carbon Database by CFC (Excel / PDF) + Variant Comparator (SIA 2032)

Compare materials by CO2 emissions, embodied energy and UBP points.

Interactive tool: tonnes of CO₂-eq, embodied energy and UBP points saved

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

1. Understanding the 3 official indicators of the KBOB list in Switzerland (kg CO₂-eq, embodied energy and UBP points)

The KBOB list publishes three indicators per material. The values in our workbook are rounded orders of magnitude: only the KBOB list in force is authoritative.

1.1 How to read and use our KBOB Excel table classified by CFC chapters (structural work, envelope, finishing work)

Enter the quantity of each material in kilograms and the three indicators per kilogram: greenhouse-gas emissions (kg CO₂-eq), non-renewable embodied energy (kWh) and total ecological impact (UBP points). Compare variants on the same functional unit and comparable service life.

1.2 The SIA 2032 technical booklet (Embodied energy of buildings) and the new cantonal low-carbon requirements

The SIA 2032 technical booklet deals with the embodied energy of buildings; several cantons and municipalities are introducing low-carbon requirements. We have not re-read these texts: check the regulations of your municipality before relying on them.

2. How to use a quantified KBOB variant to win a public tender (AIMP) even when you are 5% more expensive

A sustainability criterion is only won if it is documented: a quantified sheet makes the variant verifiable.

2.1 The weighting of the sustainability criterion (10% to 25% of the final score) in the new Swiss public procurement

In public procurement, the importance of sustainable development depends on the contracting authority: it can range from a few points to 20% or more of the score. Read the award criteria and attach to the offer a quantified supporting sheet on the variant.

2.2 Real comparison of supply-and-install costs (ACIP indices) against the carbon gain: recycled concrete, Swiss timber and bio-based insulation

Set the supply-and-install extra cost of the variant (ACIP indices) against its CO₂-eq gain: a variant that is 5% more expensive can obtain the maximum score on the ecological criterion and win overall. Quantify both; do not promise a gain without a sheet.

3. Frequently asked questions about KBOB carbon assessments in construction (FAQ)

3.1 What do the « UBP ecological impact points » (Umweltbelastungspunkte) in the KBOB tables mean?

UBP measure the total environmental burden using the ecological scarcity method: the higher the value, the greater the impact. It adds up several pollutions (air, water, soil, resources) into a single figure.

3.2 Can a craft SME draw up a KBOB comparison sheet without specialised engineering software?

Yes for a simple comparison of variants: it is enough to multiply the quantities by the indicators of the KBOB list, with our workbook. For a full assessment of a building, call on a specialist.

3.3 What is the difference in CO₂ emissions per m³ between ordinary concrete and CEM III/B recycled concrete in Switzerland?

The KBOB list gives the exact values per type of concrete: CEM III/B cement emits clearly less than CEM I, and a recycled concrete can reduce the footprint further. We do not reproduce a figure here: consult the KBOB list in force, or enter it in our workbook.

Keywords covered: list life-cycle assessment construction materials KBOB excel pdf · carbon assessment building Switzerland SIA 2032 · emissions kg CO2-eq recycled concrete timber insulation Switzerland · ecological impact points UBP primary embodied energy · sustainability criterion tender public procurement AIMP · comparator ecological variants quote.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.