Heat Pump, Underfloor Heating & Geothermal Probe Sizing Tool (SIA 384)
Heat pump (PAC) output sizing tool (W/m²), underfloor heating pipe spacing & probes.
Interactive tool
Values from the specifications, SIA 384 not consulted. Specific heat loads (25 to 80 W/m²), 0,25 kW per occupant for hot water, pipe lengths (9,5 / 6,5 / 4,8 ml/m²), loops of 90 to 100 ml, extraction rates of 35 / 45 / 55 W/m and seasonal COP: specifications (SIA 384/1 and 384/6, paid standards). The heated area is treated as equal to the SRE entered.
A Heat pump, underfloor heating and geothermal probe
Sizing
- Required nominal output of the PAC
- Underfloor heating pipe
- Recommended manifold loops
- Cooling capacity extracted from the ground
- Geothermal probe drilling
Output = SRE × load / 1000 + occupants × 0.25 kW. Pipe = SRE × metres per m². Loops limited to 90 to 100 lm to avoid pressure losses. Extracted output = output × (1 − 1 / COP); drilling = extracted output / ground extraction.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.16"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
SIA 384/1 standard: how to size the output in kW of a heat pump in Switzerland without oversizing it
The specification's heat pump output calculation m2 SIA 384 standard multiplies the energy reference area (SRE) by a specific heat load in W/m², taken at the design temperature of -8 to -10 °C, then adds an allowance of 0.25 kW per occupant for domestic hot water: P = SRE × load / 1000 + occupants × 0.25. For 180 m² and 4 people:
| Thermal standard | Load | PAC output |
|---|---|---|
| New building Minergie / CECB A (25 W/m²) | 25 W/m² | 5,50 kW |
| Standard new building SIA 380/1 / MoPEC (32 W/m²) | 32 W/m² | 6,76 kW |
| Renovated insulated building or 2000–2015 (45 W/m²) | 45 W/m² | 9,10 kW |
| Older, partially renovated building (60 W/m²) | 60 W/m² | 11,80 kW |
| Older uninsulated building before 1980 (80 W/m²) | 80 W/m² | 15,40 kW |
Oversizing a heat pump makes it switch on and off too often and degrades its efficiency: the load must therefore match the real building. The buffer tank volume domestic hot water PAC depends on the type of heat pump, the number of occupants and the controls; the specification gives no numerical rule for these volumes and the tool does not calculate any: the PAC (heat pump) manufacturer and the heating designer size them. The tool only includes the hot water production output, at 0.25 kW per occupant (1.00 kW for 4 people).
Note on the text of the standard. The specific loads, the hot water allowance and the design temperature are those of the specification; the SIA 384/1 standard (paid) was not consulted. The title of this section reproduces the specification word for word; the exact calculation of heat losses, room by room, is the job of the heating designer. For the building's insulation, see the U-value calculator; for the outdoor noise of a heat pump, the SIA 181 standard tool.
Specific output per m2 (from 25 W/m2 in Minergie to 75 W/m2 in existing buildings) and flow temperature (35 °C vs 55 °C)
The better the building is insulated, the lower the specific load: from 25 W/m² for a new Minergie building to 60 W/m² for a partly renovated existing building and 80 W/m² for an uninsulated existing building. The underfloor heating flow temperature 35°C is the usual water temperature of underfloor heating in a well-insulated building, whereas an existing building fitted with radiators often needs 55 °C; the lower the flow temperature, the better the heat pump's efficiency, which is an argument for insulating before replacing the heating.
Note on the text of the standard. The title of this subsection announces “25 to 75 W/m²” whereas the specification's list of standards goes up to 80 W/m² (uninsulated existing building before 1980): the title is kept as it is, and the tool uses 80 W/m². The flow temperatures of 35 °C and 55 °C are orders of magnitude from the specification, not verified in SIA 384/1.
Underfloor heating: calculating the pipe length per m2 by laying pitch (10 cm, 15 cm, 20 cm) and the number of circuits
The pipe laying pitch underfloor heating linear metre per m2 sets the quantity of pipe needed: the tighter the pitch, the more metres are needed. The specification uses about 9.5 lm per m² at 10 cm (bathrooms, cold zones), 6.5 lm at 15 cm (standard comfort pitch) and 4.8 lm at 20 cm. Each loop of the manifold is limited to 90 to 100 lm to avoid pressure losses.
| Pipe spacing | Pipe per m² | Pipe for 180 m² | Loops of 100 ml at most | Loops of 90 ml at most |
|---|---|---|---|---|
| Tight pitch 10 cm (bathrooms, cold zones: ~9.5 lm of pipe per m²) | 9,5 ml | 1'710 ml | 18 | 19 |
| Standard comfort pitch 15 cm (~6.5 lm of pipe per m²) | 6,5 ml | 1'170 ml | 12 | 13 |
| Wide pitch 20 cm (~4.8 lm of pipe per m²) | 4,8 ml | 864 ml | 9 | 10 |
The number of circuits is the total length divided by the maximum length of one loop, rounded up; it determines the size of the manifold. The tool applies these metre counts to the area entered, treated as the heated area: in practice only the area actually fitted with underfloor heating counts, and the passage zones of the supply pipes are added to it.
Note on the values. The metre counts per m² and the loop lengths are those of the specification, not verified in a standard; the manufacturer of the underfloor heating system sets the maximum lengths of its pipes. To estimate the financial aid for a heat pump, see the Buildings Programme simulator.
SIA 384/6 standard (Geothermal probes): calculating the drilling depth in metres according to the geology (35 to 55 W/m)
The geothermal probe depth extraction output W/m SIA 384/6 is deduced from the output the ground must supply. The heat pump draws from the ground only its cooling output, i.e. the heating output minus the electrical power: Pground = P × (1 − 1 / COP). For a 6.76 kW PAC and a seasonal COP of 4.2, the ground supplies 5.15 kW. Divided by the extraction output of the subsoil in W per metre, this output gives the total drilling length:
| Ground | Extraction | Total drilling |
|---|---|---|
| Standard Plateau / molasse: 45 W/m | 45 W/m | 114,5 m |
| Limestone / wet granite: 55 W/m | 55 W/m | 93,6 m |
| Unfavourable dry sediments: 35 W/m | 35 W/m | 147,2 m |
The total drilling may be split into one or more probes, according to the geologist's decision. As a rule, a geothermal probe is subject to a cantonal permit linked to water protection: ask the competent cantonal office before planning the drilling.
Note on the text of the standard. The extraction values of 35, 45 and 55 W/m are those of the specification; the SIA 384/6 standard (paid) was not consulted. The geologist or the driller sets the actual extraction output from the geological section of the site and the running time.
Frequently Asked Questions on Heat Pumps, Underfloor Heating and Geothermal Probes (FAQ)
1. How to calculate the output of a heat pump without oversizing it?
The specification multiplies the energy reference area (SRE) by a specific heat load in W/m², then adds 0.25 kW per occupant for domestic hot water. For 180 m² and 4 people, a standard new building (32 W/m²) needs 6.76 kW; a Minergie building (25 W/m²), 5.50 kW; an uninsulated existing building (80 W/m²), 15.40 kW. The specific load therefore depends strongly on insulation: a PAC chosen on the value of an existing building will be oversized in an insulated building.
These loads and the hot water allowance are those of the specification; the SIA 384/1 standard was not consulted. Only a heat-loss calculation by the heating designer prevails.
2. How many metres of pipe are needed for underfloor heating and how many loops?
The length depends on the laying pitch: about 9.5 lm of pipe per m² at 10 cm, 6.5 lm at 15 cm and 4.8 lm at 20 cm. For 180 m², this gives 1'710 lm at 10 cm, 1'170 lm at 15 cm and 864 lm at 20 cm. Limiting each loop to 100 lm, 18, 12 or 9 loops are needed; limiting to 90 lm to be safe, 19, 13 or 10 loops.
The tool applies these metre counts to the area entered, treated as the heated area: in practice only the area actually fitted with underfloor heating counts. The metre counts and the loop length limit are those of the specification.
3. What drilling depth is needed for a geothermal probe?
The output extracted from the ground is the heat pump's output multiplied by (1 − 1 / COP): with a seasonal COP of 4.2, it is 5.15 kW for a 6.76 kW PAC. Divided by the extraction output of the subsoil, it gives the total drilling: 114.5 m at 45 W/m (plateau, molasse), 93.6 m at 55 W/m (limestone rock or wet granite) and 147.2 m at 35 W/m (unfavourable dry sediments).
The total drilling may be split into one or more probes, according to the geologist's decision and cantonal rules. The extraction values of 35, 45 and 55 W/m are those of the specification; the SIA 384/6 standard was not consulted.
Indicative information drawn up from the tool's specification; it replaces neither the SIA 384/1 and 384/6 standards, nor the heating designer's heat-loss calculation, nor the geologist's study.
