End-of-Site Cleaning Calculator (Price per m², Hours) & SIA 118 Acceptance
Calculator for the price per m² of floor (intermediate vs end-of-site cleaning) & acceptance checklist.
Interactive tool
Rates, productivity and hourly rate from the specifications, not verified. The prices per m² in the specifications are not consistent with their rate of 68 CHF/h and their productivity (68 CHF/h at 30 m²/h gives 2,27 CHF/m², whereas the specifications state 2,50 to 4,00): the tool calculates hours × rate and compares it with the specifications' range. The CCT (collective labour agreement) for cleaning in French-speaking Switzerland sets minimum wages, not a billing rate. Assumptions of the tool: 0,06 h per m² of glazing and 1 h per bathroom or kitchen (levels 2 and 3), 8 h per day per person. For glass cleaning, the reference guideline is SIGAB 102 'Glasreinigung'.
A Hours, duration and cost of cleaning
Hours, duration and cost
- Labour hours
- Duration of work
- Estimated cost
- Average cost price
Hours = area / average output of the level + surcharges (levels 2 and 3); cost = hours × rate; incl. TVA (TTC) with 8,1 % TVA. The range of hours follows the low and high outputs of the specifications.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.35"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
- DOCXPDF As-Built Documentation (DOE) & Maintenance Log Pack (SIA 469) Maintenance instructions to be signed at handover of the keys to protect the warranty. See the file, its mini-tool and the pack →
- PDFDOCX Works Acceptance Report (PV) (SIA 118 compliant) Complete 7-page guide (PDF) and Word template. Acceptance of the work (réception des travaux): legal basis, deadlines, start of the warranties and of the surety, three report templates (no defects, minor defects, postponed acceptance) and three letters. See the file, its mini-tool and the pack →
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Price per m2 and hourly outputs of an end-of-construction cleaning in Switzerland (rough cleaning vs key handover)
The end-of-construction cleaning rate per m2 in Switzerland under SIA 118 in the specifications is calculated from the end-of-construction cleaning output in m2 per hour: hours = area / average output, plus surcharges for glazing and wet rooms; cost = hours × hourly rate. The difference between intermediate rough cleaning and key handover is that of three service levels. For 180 m² of floor, 35 m² of glazing, 3 wet rooms or kitchens and 68,00 CHF/h:
| Level | Productivity rate | Specification price | Hours | Cost excl. TVA (HT) | Calculated price |
|---|---|---|---|---|---|
| Intermediate or rough site cleaning | 25 to 35 m²/h | 2,50 to 4,00 CHF/m² | 6,0 h | 408.00 CHF | 2,27 CHF/m² |
| Complete cleaning «ready to move in / key handover» | 8 to 12 m²/h | 7,50 to 12,50 CHF/m² | 23,1 h | 1'570.80 CHF | 8,73 CHF/m² |
| Cleaning after heavy renovation or heavy soiling | 6 to 8 m²/h | 11,00 to 16,00 CHF/m² | 30,8 h | 2'095.37 CHF | 11,64 CHF/m² |
For complete cleaning: 18,0 h of floors (average output of 10 m²/h) + 2,1 h of glazing + 3,0 h of bathrooms and kitchens = 23,1 h, i.e. 1'570.80 CHF excl. TVA (HT) and 1'698.03 CHF incl. TVA (TTC) (TVA of 8,1 %), or 1,4 days for a team of 2, 1,0 for a team of 3 and 0,7 for a team of 4, at 8 h per day.
Note on the values. Rates, outputs and the rate of 68 CHF/h are those of the specifications, not verified (a weak source cites 4 to 9 CHF/m²). They are not consistent with each other: 68 CHF/h at 30 m²/h gives 2,27 CHF/m², not 2,50 to 4,00; the price per m² in the specifications probably includes equipment, products and margin. The CCT (collective labour agreement) for cleaning in French-speaking Switzerland sets minimum wages (21,40 CHF/h from 2026 for maintenance cleaning, according to a Unia leaflet), not a billing rate. The surcharges of 0,06 h per m² of glazing and 1,0 h per wet room are assumptions of the tool, editable.
Why acceptance of the work (Art. 157 to 160 SIA 118) requires perfectly clean surfaces and glazing to check for defects
The acceptance of the work in clean condition under SIA 118 art. 157 follows a two-step procedure. According to practical guides (the text of SIA 118 was not consulted), the contractor announces completion of the work to the site management (art. 158), the joint inspection takes place within the following month, the defects found and the deadline to correct them are recorded in the minutes, and the work is deemed accepted at the end of the inspection (art. 159 and 160); defects not recorded may be considered accepted (art. 163). Notice periods of two years for apparent defects and five years for hidden defects then run (art. 178 and 179).
Clean floors, glazing and frames make it possible to see scratches, stains, badly made joints and installation defects: this is the logic of the specifications. A Swiss hospital specification requires fine cleaning before any acceptance of work. For the obligations under the works contract, see the SIA 118 comparator.
Note on the text of the standard. The specifications cite articles 157 to 160; the sources consulted place the notice of completion and the joint inspection in article 158. The requirement that the work be «clean» to be accepted is not written as such in the sources consulted: it is a principle of good practice.
The 30'000 CHF trap: how to clean new windows and tiles without scratching the glass (SIGaB Directive 102) or burning the stone with acid
The cement film on tiles and scraping of windows causing scratches under SIGaB is the classic trap of end-of-construction cleaning: cement film on tiles is removed with a product suited to the material, and glass is not scraped dry. A dry metal scraper over the whole surface of a modern triple glazing (thermal treatments and coatings) leaves irreversible micro-scratches: replacing the glass can reach tens of thousands of francs, which the specifications put at 30'000 CHF. The usual rule is to wet the glass abundantly, remove the dirt with a rubber squeegee, never to run a blade dry over the whole surface, and to follow the SIGAB directive on glass cleaning.
An acid removes cement film but attacks limestone, marble and cement-based joints: on these materials, a suitable product, tests on a small area and abundant rinsing are needed (general principle of the trade). For tiles and their joints, see the tiling tool; for the protection of glazing, see the safety glass tool.
Note on the text of the directive. The reference directive for glass cleaning, in particular toughened glass (ESG), is SIGAB 102 «Glasreinigung», cited in the title of this section. The amount of 30'000 CHF is that of the specifications, not verified; the remark on acid is a general principle, not taken from a standard.
Allocation of cleaning costs between contractors: deduction from the prorata account vs direct billing to the responsible party
The cleaning of a construction site is split into phases. A Swiss hospital specification distinguishes rough cleaning of the whole perimeter, fine cleaning before acceptance and a follow-up cleaning if the move-in is delayed. When several contractors have soiled the same room, there are two ways of allocating: the prorata account (compte de prorata), which shares the common costs among all the contractors according to an allocation key, and direct billing to the responsible contractor, when it can be identified. The choice, the key and the ceiling are set in the special conditions of the works contract, before work begins.
Note. The specifications give neither an allocation key nor an amount: no figure was found in a standard, and the tool does not allocate the costs. The rules of the prorata account depend on the contract and the general conditions; have them validated by the site management. ⚡ Price your end-of-construction cleaning in Soumission
Frequently Asked Questions about End-of-Construction Cleaning, Outputs and Acceptance (FAQ)
1. What price per m² and what output for an end-of-construction cleaning?
The specifications distinguish three levels: intermediate or rough cleaning (25 to 35 m²/h, 2,50 to 4,00 CHF/m²), complete «ready to move in» cleaning (8 to 12 m²/h, 7,50 to 12,50 CHF/m²) and cleaning after heavy renovation (6 to 8 m²/h, 11,00 to 16,00 CHF/m²). For 180 m² of complete cleaning, with 35 m² of glazing and 3 wet rooms or kitchens, at 68,00 CHF/h: 23,1 hours, 1'570.80 CHF excl. TVA (HT), 1'698.03 CHF incl. TVA (TTC), i.e. 8,73 CHF/m². Rough cleaning costs 2,27 CHF/m² and heavy renovation 11,64 CHF/m².
Rates, outputs and hourly rates are those of the specifications, not verified (a weak source cites 4 to 9 CHF/m²). They are not consistent with each other: 68 CHF/h at 30 m²/h gives 2,27 CHF/m² and not 2,50 to 4,00. The CCT (collective labour agreement) for cleaning in French-speaking Switzerland sets minimum wages (21,40 CHF/h from 2026 for maintenance cleaning, according to a Unia leaflet), not a billing rate. The surcharges of 0,06 h per m² of glazing and 1 h per wet room are assumptions of the tool.
2. What is the difference between an intermediate (rough) cleaning and the key handover?
Rough or intermediate cleaning removes offcuts, sweeps and vacuums dust before the screed or the painting: it does not make the premises habitable. The complete key-handover cleaning removes the cement film, cleans windows, rebates and blinds, kitchens and bathrooms, then the floors. A Swiss hospital specification likewise distinguishes rough cleaning, fine cleaning and follow-up cleaning, and requires fine cleaning before acceptance. Heavy renovation adds films of glue or epoxy and the fine dust from sanding.
This description of the levels is that of the specifications, supplemented by that hospital document; neither of the two sets a site cleaning standard.
3. Why clean before acceptance under SIA 118, and how can I avoid scratching the glazing?
According to practical guides (the text of SIA 118 was not consulted), the contractor announces completion of the work (art. 158), the joint inspection takes place within the month, the defects are recorded in the minutes, the work is deemed accepted at the end of the inspection (art. 159 and 160) and defects not recorded may be considered accepted (art. 163). Clean surfaces and glazing make it possible to check these defects: this is the logic of the specifications. On new glazing, a dry metal scraper scratches the glass irreversibly: wet it abundantly and remove the dirt with a rubber squeegee.
For glass cleaning, the reference directive is SIGAB 102 «Glasreinigung». The specifications also cite articles 157 to 160; the sources consulted place the notice of completion and the inspection in article 158.
Indicative information prepared from the tool's specifications; it replaces neither standard SIA 118, nor the SIGAB directive on glass cleaning, nor the quotation of a cleaning company.