1. Tables of minimum insulation thicknesses (in cm) to reach the SIA 380/1, MoPEC and subsidy thresholds
Insulation thickness is derived from the target U-value, the resistance of the existing wall and the thermal conductivity λ of the material: d = (1/U − Rsi − Rse − R existing) × λ.
1.1 Comparison of thermal conductivities λ (W/mK): when should you offer the client a thin high-performance insulation (PIR / Resol)?
For an external wall with Rsi + Rse = 0.17 m²K/W and an existing resistance of 0.50 m²K/W, about 15 cm of EPS or mineral wool (λ ≈ 0.035) is needed for U ≤ 0.20, but only about 10 cm of PIR (λ ≈ 0.024): thin insulants are suitable when the available thickness is limited (window reveals, thresholds, ceiling height).
1.2 Individual limit values required for roofs, facades, slabs over basements and windows (Uw)
The limit values depend on the cantonal law (MoPEC) and on the element: roof, facade, slab over basement, window (Uw value). The figures of 0.20 and 0.15 W/m²K are reference points; the reinforced value of 0.15 gives entitlement to subsidies in several cantons. Read your canton's law.
2. Standard SIA 180: preventing interstitial condensation, dew point and mould
Insulating without checking the dew point moves the cold: moisture condenses where the wall becomes cold.
2.1 Why internal insulation and window replacement without a ventilation concept or vapour barrier trigger heavy damage
Internal insulation cools the wall: without a vapour barrier and careful airtightness, water vapour migrates into the wall and condenses. Tighter windows remove natural air renewal: without ventilation, the humidity in the dwelling rises and mould appears.
2.2 Critical surface temperature (fRsi) and treatment of linear thermal bridges (Ψ)
The surface condensation check uses usual calculation conditions (indoor 20 °C and 50% humidity, outdoor −10 °C) and requires an fRsi factor of at least 0.75; linear thermal bridges (Ψ) lower the surface temperature and are calculated separately.
3. Frequently asked questions about the U-value and the SIA 180 standard (FAQ)
3.1 How can you quickly calculate the thermal resistance R (m²K/W) and the U-value of a multilayer wall?
Calculate the resistance of each layer (thickness in metres divided by λ), add them together with the surface resistances Rsi and Rse, then take the inverse: U = 1 / R total. Our online tool does the calculation layer by layer.
3.2 Who is responsible if mould appears at the client's after new airtight triple-glazed windows are installed?
If the contractor did not inform the client of the need for ventilation, his liability may be engaged for breach of the duty to warn. Inform in writing and propose suitable ventilation: our file contains the elements to include in the quote.
3.3 What thickness of rock wool or EPS insulation is needed to obtain U = 0.15 W/m²K?
With an existing wall of resistance 0.50 m²K/W and Rsi + Rse = 0.17, about 21 cm of mineral wool or EPS (λ ≈ 0.035) is needed to reach 0.15 W/m²K. Calculate with the real resistance of your wall.
Keywords covered: chart insulation thickness U-value SIA 380/1 pdf · catalogue thermal conductivity lambda materials Switzerland SIA · maximum U-value facade roof window MoPEC 0.20 0.15 · standard SIA 180 humidity condensation dew point · liability mould after internal insulation or windows · vapour barrier vapour retarder sd value Switzerland.
The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.