Aller au contenu
Website
SIA 265 Tool 6.07 Online

Timber Roof Frame Calculator: Volume, C24/GL24h Sections & SIA 265 Standard

Calculator for timber volume, moisture classes and rafter/purlin spacing.

Interactive tool

Pre-check, not a structural calculation. The densities, moisture contents, the depth rule (span / 20 for solid timber, span / 22 to 24 for glulam) and the limit deflections (L/300 to L/400) are those of the specifications, not verified in SIA 265 (paid standard). The weight is calculated on the net volume.

A The roof frame

m
m
cm
cm
cm
purlins
cm
cm
%
m
m

Volume, weight and pre-check

Number of rafters
Volume of the rafters
Volume of the purlins
Total timber volume to order
Total weight of the timber structure (crane lifting)
Recommended rafter depth
Recommended purlin depth
Limit deflection

Number of rafters = round up(length / spacing) + 1; gross volume = net volume × (1 + loss); weight = net volume × density. The recommended depth is a rule of thumb, not a deflection calculation under SIA 265.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.07"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 265 (timber structures): choosing between solid timber C24, KVH (finger-jointed timber) and glulam GL24h

The SIA 265 standard for timber framing: moisture and section is the Swiss reference for the design of timber structures. For a timber frame, the first choice is the product. The difference between solid timber C24 and glulam GL24h lies in manufacture: solid timber is a piece sawn from a trunk, KVH is solid timber finger-jointed end to end (so longer and drier), and glulam is made of glued laminations, which allows large sections and long spans.

Comparison of solid timber C24, KVH and glulam GL24h
ProductManufacturingCommon useDensity from the specifications
Solid timber C24Sawn piece, graded by strength (C24)Rafters, purlins of moderate span420 kg/m³ (spruce, fir)
KVH (finger-jointed timber)Dried solid timber finger-jointed end to endRafters and long beams, carefully finished sectionsNot provided by the specifications
Glulam GL24hGlued laminations, homogeneous sectionPurlins and beams of long span, exposed timber440 kg/m³ (GL24h / GL28h)

For the example timber frame (12,0 m long, 6,5 m roof slope width, 21 rafters and 5 purlins), the weight to be lifted depends on the species:

Weight of the example timber structure by species
SpeciesDensityWeight of the timber structure
Solid spruce / fir C24420 kg/m³1'955 kg
Glulam GL24h / GL28h440 kg/m³2'048 kg
Larch / Douglas fir550 kg/m³2'559 kg
Oak700 kg/m³3'258 kg

Note on the text of the standard. SIA 265 is a paid standard, not consulted: the products are described from their general characteristics, and the densities are those of the specifications, not verified. The specifications give no density for KVH.

The 3 service classes and the maximum moisture contents of timber at installation (12 %, 15 % and 20 %)

The service class 1, 2, 3 and timber moisture under SIA 265 describes the environment in which the timber is used, and therefore the moisture it will reach: it affects strength and the choice of treatment. The tool uses the three classes of the specifications:

Service classes and timber moisture
Service classTimber moisture (specifications)Situation
Class 112 %Heated interior: low equilibrium moisture.
Class 218 to 20 %Under an open shelter or in unheated roof spaces.
Class 3over 20 %Exposed to the weather: the moisture of the timber exceeds 20 %.

Note on the text of the standard. The title in the specifications states «12 %, 15 % and 20 %», whereas its fields give 12 %, 18 to 20 % and more than 20 %: these rates are not consistent with each other and have not been verified. What is established: SIA 265 and SN EN 1995-1-1 define three moisture classes; a guide from the Bern University of Applied Sciences (BFH) gives, for an element protected from rain, an average annual moisture of about 18 % (± 6 %). The tool's values are therefore reference points: the engineer applies the text of the standard. Spruce and fir in class 3 require constructional protection or treatment.

How to calculate the volume (m3) and weight of a traditional timber frame (rafters, purlins, counter-battens and battens)

The calculation of timber volume for a roof frame, rafters and purlins in m3 is done in three steps: count the pieces, multiply by their unit volume, add the cutting loss. The number of rafters is the length divided by the spacing, rounded up, plus one; the volume of a rafter is its section multiplied by the roof slope width. For the example:

Volume and weight of the example timber structure
Line itemQuantity
Rafters of 8 × 18 cm at 60 cm spacing21 pieces, 1,966 m³ net, 2,123 m³ gross
5 purlins of 16 × 28 cm2,688 m³ net, 2,903 m³ gross
Total volume to order (8 % loss)5,026 m³
Weight for lifting (net volume × 420 kg/m³)1'955 kg

The counter-battens and the battens are counted in linear metres, not in m³: for a 78 m² roof slope, the counter-battens at 60 cm spacing come to about 130 lm, and the battens for a tile with a 34 cm gauge to about 229 lm. For the complete roof covering, see the roof covering and underlay calculator. ⚡ Price your timber framing in Soumission

The weight is calculated on the net volume: the cutting loss is not lifted. The moisture of the timber makes the weight vary by a few percent.

Rules for preliminary sizing of spans and deflection limits under standard SIA 265 (L/300 and L/400)

The permissible deflection of a timber beam L/300 L/400 limits the deformation of a bent member: it is calculated in mm by dividing the span by 300 or 400. To size the depth preliminarily, the specifications propose a rule of thumb: span/20 for solid timber and span/24 to span/22 for glulam.

Recommended depth and limit deflection by span
SpanDepth in solid timber (span / 20)Depth in glulamLimit deflection L/400 to L/300
3 m15,0 cm12,5 to 13,6 cm7,5 to 10,0 mm
4 m20,0 cm16,7 to 18,2 cm10,0 to 13,3 mm
5 m25,0 cm20,8 to 22,7 cm12,5 to 16,7 mm
6 m30,0 cm25,0 to 27,3 cm15,0 to 20,0 mm
8 m40,0 cm33,3 to 36,4 cm20,0 to 26,7 mm

Note on the text of the standard. These rules are those of the specifications: the depth of span/20 is a rule of thumb, not a normative one, and the deflections of L/300 to L/400 have not been verified in SIA 265 (not consulted). They serve to spot a section that is clearly too weak, never to design: the engineer's structural calculation, which takes account of snow loads, creep and supports, prevails.

Frequently Asked Questions about Timber Framing, Volume and Deflection (FAQ)

1. What is the difference between solid timber C24 and glulam GL24h?

Solid timber C24 is a sawn piece of timber, graded by strength (class C24): its sections and lengths are limited by the tree, and it can split or warp as it dries. Glulam GL24h is made of glued laminations: it is manufactured in large sections and for long spans, with controlled moisture and better dimensional stability. KVH is solid timber finger-jointed end to end. The specifications use a density of 420 kg/m³ for C24 and 440 kg/m³ for GL24h: for the example timber frame, the weight goes from 1'955 to 2'048 kg.

These densities are those of the specifications, not verified in SIA 265. The choice between the three is for the timber engineer.

2. How do I calculate the timber volume of a traditional timber frame?

The number of rafters is the roof length divided by the spacing, rounded up, plus one: 21 rafters for 12,0 m at 60 cm spacing. The net volume is the number of pieces multiplied by their section and length: 1,966 m³ for the 8 × 18 cm rafters and 2,688 m³ for the 5 purlins of 16 × 28 cm. With 8 % cutting loss, the volume to order is 5,026 m³, and the weight to lift is 1'955 kg (net volume × density).

Counter-battens and battens are counted separately, in linear metres: see the roof covering tool (6.10).

3. What deflection is permissible for a timber beam (L/300 or L/400)?

The specifications use a limit deflection of L/300 to L/400 under SIA 265. For a 4,0 m purlin, this gives 10,0 to 13,3 mm. To size the depth preliminarily, the rule of thumb in the specifications is span/20 for solid timber and span/24 to span/22 for glulam: 20 cm depth for this purlin in solid timber.

This rule is a rule of thumb and not a normative one, and the deflection limits have not been verified (SIA 265 not consulted): only the engineer's structural calculation prevails.

Indicative information prepared from the tool's specifications; it replaces neither SIA 265 nor the timber engineer's calculation.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.