Kitchen Dimensions Converter: Swiss SMS Standard (55 cm) vs Euro Standard (60 cm)
Built-in dimension converter (Swiss SMS standard 55 cm vs Euro standard 60 cm).
Interactive tool
Widths of 55 and 60 cm confirmed, other dimensions in the specifications not verified. The SMS standard (formerly the SINK standard) provides for 55 cm and the European standard EN 1116 for 60 cm (reply from the federal administration). The 550 mm SMS recess, the 560 to 568 mm Euro recess and the 127 mm grid in sixths (6/6 = 762 mm) come from the specifications; the 560 mm body of a Euro appliance is an assumption of the tool. SIA 500 based on the canton of Zurich's summary; no "SIA 350" standard found.
A Recess niche: existing standard and the appliance's standard
Built-in dimensions and compatibility
- Existing recess
- Planned appliance
- Swiss vertical grid in sixths
Dimensions from the specifications: SMS, unit width 550 mm and recess of 550 mm (appliances of 548 mm); Euro, 600 mm and recess of 560 to 568 mm (side panels of 16 or 19 mm).
B Linear layout: how many columns in the available length
Units of 55 cm and 60 cm
- 55 cm SMS grid
- 60 cm Euro grid
C Ergonomics: clearances and distances (SIA 500)
Clearances and distances
SIA 500 (Zurich summary): 140 × 170 cm in front of the sink and the cooker, 120 cm between two runs, 25 to 90 cm between the sink and the cooker. The specifications: 120 cm (140 cm barrier-free) and 60 to 80 cm sink – hob.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.28"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Swiss Standard SMS (55 cm) vs European Standard (60 cm): complete comparison table of built-in dimensions
The difference between the SMS 55cm and Euro 60cm standard in a Swiss kitchen is down to history. From the mid-1960s, Swiss industry created the SINK standard, which became the SMS standard (Schweizer Mass-System), setting all the dimensions useful for built-in installation and providing for a width of 55 cm. The European standard EN 1116 (1995), adopted in Switzerland as SN EN 1116, provides for 60 cm. Swiss manufacturers did not manage to have 55 cm adopted in Europe; the Küchen-Verband-Schweiz association therefore kept the SMS standard and supplemented it with the European dimensions, so that older appliances remain replaceable. Appliances of both standards are sold in Switzerland today.
The dimensions of the built-in recess for oven and dishwasher SMS 550 mm, according to the specifications:
| Dimension | SMS standard (Schweizer Mass-System) | Euro standard (EN 1116, Euro 60) |
|---|---|---|
| Outside width of unit | 550 mm (55,0 cm) | 600 mm (60,0 cm) |
| Built-in recess | 550 mm | 560 to 568 mm (side panels of 16 or 19 mm) |
| Appliance body | 548 mm | 560 mm (tool assumption) |
| Vertical grid | Sixths of 127 mm (6/6 = 762 mm) | Steps of 100, 150, 600 mm |
| Standard oven | Height in sixths | 595 mm in a 600 mm recess |
Note on the values. The widths of 55 and 60 cm and the history of the standard are confirmed by an answer from the federal administration. The other dimensions (SMS recess of 550 mm, Euro recess of 560 to 568 mm, sixths of 127 mm) are those of the specifications: only weak sources corroborate them (an apprenticeship sheet cites a module of 12,7 cm, a 2004 forum a height of 762 mm). The Euro appliance body of 560 mm is an assumption. Confirm all dimensions in the appliance manufacturer's planning catalogue.
Understanding the Swiss vertical grid in sixths (1/6 = 12,7 cm and 6/6 = 76,2 cm) against the 60 cm Euro standard
The height module 1/6 127 mm of the Swiss SMS standard divides the height of a base unit into six equal parts of 127 mm: an appliance occupies a whole number of sixths, the complete unit carcass measuring 6/6, i.e. 762 mm (76,2 cm). The European standard works differently, with a module of 100, 150 and 600 mm.
| Sixths | Height in millimetres | Height in centimetres |
|---|---|---|
| 1/6 | 127 mm | 12,7 cm |
| 2/6 | 254 mm | 25,4 cm |
| 3/6 | 381 mm | 38,1 cm |
| 4/6 | 508 mm | 50,8 cm |
| 5/6 | 635 mm | 63,5 cm |
| 6/6 | 762 mm | 76,2 cm |
Can a European oven or dishwasher (60 cm) be installed in an existing Swiss kitchen built to the SMS standard (55 cm)?
To replace a Swiss-standard household appliance with a European one, compare the appliance body with the existing recess. With the dimensions of the specifications:
| Existing recess | Planned appliance | Width difference | Verdict |
|---|---|---|---|
| SMS (550 mm) | Euro (560 mm) | -10 mm | Does not fit: recess to be widened |
| Euro (560 to 568 mm) | SMS (548 mm) | 12 to 20 mm | Fits, gap to be filled (frame or filler strips) |
| SMS (550 mm) | SMS (548 mm) | 2 mm | Fits, gap to be filled (frame or filler strips) |
| Euro (560 to 568 mm) | Euro (560 mm) | 0 to 8 mm | Fits, gap to be filled (frame or filler strips) |
A European appliance in an SMS recess overhangs by 10 mm: the recess must be widened, that is, the neighbouring unit replaced or cut down, or an SMS appliance chosen (the Swiss market offers them). The other way round, an SMS appliance fits in a European recess with a clearance that a frame or adaptation filler strips make up; their availability should be asked of the manufacturer. Electrical and water connections follow the appliance: see the electricity tool and the plumbing tool.
Note on the values. These differences rest on the dimensions of the specifications, not verified in a catalogue: measure the existing recess and the appliance's installation sheet before any order.
Standards SIA 350 and SIA 500: worktop heights (88 to 93 cm), free space of 120/140 cm and wall squareness tolerances
The standard SIA 350 fitted kitchens ergonomics SIA 500 brings together two references in the specifications. Standard SIA 500 «Barrier-free construction» (2009 edition) sets, according to the Canton of Zurich summary that reproduces it, the spaces of the kitchen of an adaptable dwelling: a free area of 140 × 170 cm in front of the sink and cooker of a single-run or L-shaped kitchen, 120 cm between two runs, and a distance of 25 to 90 cm between the sink and the cooker, in the same run. The specifications cite 120 cm of free space (140 cm barrier-free), 60 to 80 cm between the sink and the hob, and a worktop 88 to 93 cm high.
| Dimension | SIA 500 (Zurich summary) | Specifications |
|---|---|---|
| Free space in front of the units (one run or L) | 140 × 170 cm | 120 cm (140 cm without obstacles) |
| Between two rows | 120 cm | 120 cm |
| Distance sink – cooker | 25 to 90 cm | 60 to 80 cm (usage recommendation) |
| Worktop height | Not reproduced | 88 to 93 cm (not verified) |
In the example of 340 cm, with filler strips of 3 cm on each side (334 cm usable), the 55 cm grid holds 6 modules and the 60 cm grid 5 modules: the SMS grid gains 1 column. This gain depends on the length of the kitchen; at 306 cm, the two grids hold the same number of modules. The squareness and flatness tolerances of the walls come under the SIA 414 series on dimensional tolerances in building: it was not consulted and the tool does not quantify these tolerances; measure the finished walls before ordering the fittings.
Note on the text of the standards. No standard «SIA 350» was found in the sources consulted: the section title and the keyword remain as requested. The spaces come from SIA 500 (paid text, not consulted, reproduced by the Zurich summary) and from the specifications; the distance of 60 to 80 cm between the sink and the hob is an ergonomic recommendation, not a requirement of SIA 500. ⚡ Price your kitchens in Soumission
Frequently Asked Questions about Swiss SMS (55 cm) and European (60 cm) Kitchens (FAQ)
1. What is the difference between the Swiss SMS standard of 55 cm and the European standard of 60 cm for a kitchen?
The SMS standard (Schweizer Mass-System, former SINK standard, born in the mid-1960s) provides for a built-in width of 55 cm; the European standard EN 1116, adopted in Switzerland in 1995 as SN EN 1116, provides for 60 cm. Swiss manufacturers did not manage to impose 55 cm in Europe: the Küchen-Verband-Schweiz association kept the SMS standard and supplemented it with the European dimensions, so that older appliances remain replaceable. Appliances of both standards are sold in Switzerland today.
The dimensions of the specifications (SMS recess of 550 mm for appliances of 548 mm, Euro recess of 560 to 568 mm, vertical grid in sixths of 127 mm with 6/6 = 762 mm against a module of 100, 150 and 600 mm in Euro) could not be verified in a standard document or a manufacturer's document: confirm them in the appliance's planning catalogue.
2. Can a European oven or dishwasher (60 cm) be installed in an existing Swiss kitchen built to the SMS standard (55 cm)?
Generally not: the body of a European appliance measures 560 mm (assumption of the tool, deduced from the minimum recess in the specifications) and the SMS recess 550 mm: the appliance overhangs by 10 mm. The recess must be widened, that is, the unit replaced or cut down, or an SMS appliance chosen. The other way round, an SMS appliance of 548 mm fits in a Euro recess of 560 to 568 mm with a clearance of 12 to 20 mm, to be made up with a frame or adaptation filler strips, to be requested from the manufacturer.
These calculations rest on the dimensions of the specifications, not verified: measure the existing recess and the appliance's installation sheet before any order.
3. How many columns fit in a kitchen of 340 cm, and what free spaces should be observed according to SIA 500?
With filler strips of 3 cm at each end (334 cm usable), the 55 cm grid holds 6 modules (remainder of 4,0 cm) and the 60 cm grid 5 modules (remainder of 34,0 cm): the SMS grid gains 1 column. This gain is not systematic: at 306 cm, the two grids hold 5 modules, it depends on the length. According to the Canton of Zurich summary on SIA 500, a free area of 140 × 170 cm is needed in front of the sink and cooker of a single-run or L-shaped kitchen, 120 cm between two runs, and a distance of 25 to 90 cm between the sink and the cooker.
The specifications cite 120 cm of free space (140 cm barrier-free), 60 to 80 cm between the sink and the hob (a rule of thumb, not SIA 500) and a worktop of 88 to 93 cm, not verified. No standard «SIA 350» was found.
Indicative information prepared from the tool's specifications; it replaces neither standard SIA 500, nor the planning catalogue of the appliance manufacturer, nor the kitchen fitter's survey.
