Free BIM (IFC) Reader & Automatic Quantity Extractor (SIA 2051)
Open an IFC model in your browser and automatically extract areas, volumes and quantities by object class (walls, slabs, windows…).
Interactive tool
BIM quantity take-off by IFC class and eCCC-Bât / CFC / ACIP mapping
| Family (IFC classes) | Objects | Gross area (GrossArea m²) | Net area (NetArea m²) | Volume (NetVolume m³) | Length (m) | eCCC-Bât | CFC | ACIP chapter |
|---|
Wall areas: GrossSideArea and NetSideArea; windows and doors: Area; columns and beams: OuterSurfaceArea. The quantities come from the model (BaseQuantities); the tool does not recalculate the geometry.
"3D BIM take-off / SIA 118 measurement rule" discrepancy simulator
BIM deducts all openings. The rule of non-deduction of small openings puts them back into the area to be priced: choose the threshold for your trade.
- Openings not deducted
- —
- Area of these openings
- —
- Walls: BIM net area
- —
- Walls: area under the SIA 118 rule
- —
- Correction to apply (m²)
- —
- Correction to apply (%)
- —
Assumption: the net area of the walls (NetSideArea) has already deducted all the windows and doors. The thresholds (0.5 m² in masonry, 2.5 m² in plastering and painting) are those of this tool's specification: the conditions of each bill of quantities prevail.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="1.3"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
How can a contractor or craftsperson use a BIM model (.ifc) without expensive software?
Many architects now supply a digital model with the tender package. A free online IFC file reader is enough to get out of it what interests you: the number of walls, the area of the slabs, the volume of concrete, the number of windows. The tool above reads the file in your browser and gives a table by object class, without installing any BIM software. To extract BIM model take-off SIA 2051, it adds up the quantities already calculated in the model.
1. Understanding the open IFC format (IFC2x3 and IFC4) and the Swiss technical leaflet SIA 2051
IFC (Industry Foundation Classes) is the open exchange format for BIM models: a text file (standard ISO 10303-21) in which each object of the building is a line, for example a wall, a slab or a window. Two versions are in circulation: IFC2x3, still very widespread, and IFC4. The technical leaflet SIA 2051 BIM method Switzerland sets the working framework for a digital model in Swiss construction: roles, levels of information and data exchange. IFC is its common exchange format between software.
2. Automatic mapping between 3D BIM objects (IfcWall, IfcSlab, IfcCovering, IfcDoor, IfcWindow) and pricing chapters
The entity classes IfcWall IfcSlab IfcWindow (walls, slabs, windows), as well as IfcCovering (finishes), IfcDoor (doors), IfcColumn, IfcBeam, IfcRoof, IfcSpace, IfcRailing and IfcStair, are linked to an eCCC-Bât element code, a CFC code and an ACIP price chapter: this is the principle of digital take-off eCCC-Bât. A "walls" line thus refers to the chapter "Reinforced concrete & Masonry", a "windows" line to the chapter "Windows & ext. Doors". The table below details each correspondence; the code translator gives the other equivalences.
The major pitfall of BIM take-off (QTO) compared with the Swiss SIA 118 measurement rules
A quantity survey drawn from a model (QTO, for quantity take-off) gives clean and fast figures, but not necessarily billable ones. The difference raw geometry and SIA 118 take-off lies in the measurement rules: BIM software measures the geometry, whereas Swiss take-off applies conventions (non-deduction of small openings, overlaps, surcharges) set by the standard and by the bill of quantities.
1. Why the geometric net area of a 3D wall (NetSideArea) differs from the billable SIA 118 take-off (non-deduction of small openings < 0.5 m² or < 2.5 m²)
The net area of a wall in the model (NetSideArea) is the gross area minus all the openings. The non-deduction rule does not remove the small openings: the threshold used here is 0.5 m² in masonry and 2.5 m² in plastering and painting (the conditions of each bill of quantities prevail). A worked example: a wall of 5.00 m by 2.50 m has a gross area of 12.50 m². A ventilation opening of 0.40 m² is deducted in the model, which reports 12.10 m²; the non-deduction rule measures 12.50 m². Raw BIM therefore underestimates the area by 0.40 m², that is 3.31 %.
On a whole building, the discrepancy runs to tens of square metres: the simulator above calculates the correction to apply, in m² and in %, from the openings in your model.
2. Checking the quantities of concrete (m3), formwork (m2), partitions and finishes before submitting your tender
- Concrete (m3): compare the volume in the model (NetVolume) with the volume in the bill of quantities; discrepancies often come from recesses and thicknesses.
- Formwork (m2): the model does not count formwork faces; recalculate them from the areas of walls, slabs and columns.
- Partitions: check the height (under slab or under ceiling) and the deduction of doors.
- Finishes: start from the area of the rooms (IfcSpace) or the finishes (IfcCovering) and compare it with the schedule.
- Always: the model is not the contract document; the architect's bill of quantities prevails. The quantities of the SIA 451 schedule are those you must price.
Mapping table of IFC classes, BaseQuantities properties and eCCC-Bât / ACIP codes
| Family | IFC classes | BaseQuantities properties read | eCCC-Bât | CFC | ACIP chapter |
|---|---|---|---|---|---|
| Walls | IFCWALL, IFCWALLSTANDARDCASE | Length, Height, Width, GrossSideArea, NetSideArea, GrossVolume, NetVolume | D1 (E2 if façade) | 211 | 06 |
| Slabs | IFCSLAB | Width, Length, Perimeter, GrossArea, NetArea, GrossVolume, NetVolume | D2 | 211 | 06 |
| Columns | IFCCOLUMN | Length, CrossSectionArea, OuterSurfaceArea, GrossVolume, NetVolume | D1 | 211 | 06 |
| Beams | IFCBEAM | Length, CrossSectionArea, OuterSurfaceArea, GrossVolume, NetVolume | D2 | 211 | 06 |
| Roofs | IFCROOF | GrossArea, NetArea, ProjectedArea | F1 | 224 (214 for the roof structure) | 09, 10 |
| Rooms | IFCSPACE | Height, GrossFloorArea, NetFloorArea, GrossVolume, NetVolume | M2 | 281 | 21, 22, 23, 24, 25, 26 |
| Windows | IFCWINDOW | Height, Width, Area | E3 | 221 | 14 |
| Doors | IFCDOOR | Height, Width, Area | E3 (exterior) or M1 (interior) | 221 or 273 | 14, 27 |
| Coverings | IFCCOVERING | GrossArea, NetArea | M2 | 281 (floors) or 271 (ceilings) | 22, 23, 24, 25, 26 |
| Guardrail | IFCRAILING | Length | H3 | 272 | 08 |
| Stairs | IFCSTAIR | Length, Height | D2 | 211 | 06 |
Indicative link to the ACIP 2026 reference (to be validated against your project's conventions). The tool reads the quantities written in the model (BaseQuantities); it calculates no geometry.
Frequently Asked Questions on BIM and IFC Files for Construction SMEs (PME) (FAQ)
1. Can you read an IFC file without expensive BIM software?
Yes. An .ifc file is an open text file (STEP format, standard ISO 10303-21). The tool above reads it in your browser, without installation, and adds up the quantities already calculated in the model (areas, volumes, lengths) by object class: walls, slabs, columns, beams, roofs, rooms, windows, doors, finishes, railings and stairs.
A limit to know: the tool calculates no geometry. If the model does not contain the base quantities (BaseQuantities), the objects are counted but without area or volume; you must then ask the model's author for an export with quantities.
2. Why are the quantities of a BIM model not those of the billable take-off?
A 3D model deducts every opening from the net area of a wall (NetSideArea), whereas Swiss measurement rules (SIA 118 and the conditions of the bills of quantities) may provide for not deducting small openings, for example less than 0.5 m² in masonry or less than 2.5 m² in plastering and painting. A raw BIM extraction can therefore underestimate the work.
The discrepancy simulator on this page calculates the correction in square metres and as a percentage to add to the net area of the walls. The exact thresholds depend on the conditions of each tender: check them in the bill of quantities.
3. What does the SIA 2051 technical leaflet mean?
SIA 2051 is the technical leaflet of the Swiss Society of Engineers and Architects on the BIM method in Swiss construction. It sets the basis for collaboration around a digital model (roles, levels of information, data exchange); the open IFC format is the exchange vehicle between software.
This tool replaces neither the standard nor take-off software: it quickly gives you an order of magnitude of the quantities to prepare or check a tender.
4. Is my IFC file sent to a server?
No. The reading takes place entirely in your browser and the model is neither transmitted nor stored. The maximum accepted size is 150 MB; for a heavier model, export a version without geometry or limited to one discipline (structural work, finishing work).
Compressed formats (.ifczip) and XML (.ifcxml) are not read: export in .ifc format (IFC2X3 or IFC4).
Indicative information that replaces neither the SIA 2051 standard nor take-off software. The demonstration model is fictitious.