PPE Renovation Simulator (Majorities Art. 647 CC) & Impact on Rents (OBLF)
Simulate the voting majorities for a renovation in PPE and the impact on rents under the OBLF.
Interactive tool
A Legal majority at the PPE meeting (Civil Code, Art. 647c, 647d and 647e)
1 Nature of works
2 Live voting simulator
Necessary work: majority of all co-owners (art. 647c CC), or of those present if the condominium (PPE) regulations so provide; useful work: majority of all co-owners and more than 500 thousandths; luxury work: unanimity. Case law allows some tempering of unanimity: have the classification of the work validated by a lawyer.
B Passing the work on to rents (art. 14 OBLF — Rent Ordinance)
Admissible rent increase
- Net investment (works − subsidies)
- Value-adding share that can be passed on
- Total annual pass-through rate
- Total annual rent increase for the building
- Average monthly increase per dwelling
| Component | Rate |
|---|
Interest on capital: (reference rate + increase) / 2, i.e. on half of the investment (average capital). The maintenance flat rate of 1.0% is the one in the specifications. Estimate: only the rent-increase procedure is authoritative.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.4"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Voting on works at a condominium (PPE) general meeting: the 3 majorities of the Swiss Civil Code (Art. 647c to 647e CC)
The majority vote renovation work Swiss condominium PPE depends on the nature of the work. The Civil Code distinguishes three categories, which apply to condominium ownership by reference to article 712g paragraph 1: the necessary useful luxury work civil code 647 are necessary (art. 647c), useful (art. 647d) and luxury work (art. 647e). The classification decides the majority required, and it is often disputed before the courts.
| Category | Examples | Required majority |
|---|---|---|
| Necessary (Art. 647c CC) | Maintenance, repair and renewal required to preserve value and usability: roof, façade, pipework | Majority of all co-owners (or of those present if the condominium (PPE) regulations so provide) |
| Useful (Art. 647d CC) | Work that increases value or improves yield or usability: insulation, heat pump, useful lift | Majority of all co-owners representing more than 500 thousandths |
| Luxury (Art. 647e CC) | Work intended only to embellish or improve the appearance of the building | Unanimity, subject to qualifications |
Note on the text of the standard. The text of article 647c CC requires a decision taken by the majority of all co-owners for maintenance, repair and renewal work: this is the tool's default rule. If the condominium (PPE) regulations provide for the majority of the co-owners present or represented, tick the corresponding box. Article 647d also provides that a co-owner whose use would be lastingly hindered cannot be forced without their consent, and that an expense unreasonable for them can be imposed on them only if the others bear the excess. For the unanimity of article 647e, case law allows some tempering: have the classification of the work validated by a lawyer before the vote.
Necessary work (simple majority) vs Useful and energy work (double majority of heads + thousandths)
For necessary work, the tool requires the majority of all co-owners: with 12 co-owners, 7 YES votes are required, even if only 9 are present; if the condominium (PPE) regulations provide for the majority of those present, 5 YES votes out of 9 present are enough. For useful work, two conditions must be met: the majority of all co-owners by number (the "heads") and more than 500 thousandths of the value of the shares. In the tool's example, with 12 co-owners, 7 YES votes and 540 thousandths, the double majority is reached: the decision is adopted. With 6 YES votes out of 12, even at 800 thousandths, it is rejected: the majority of all co-owners is needed. Energy-saving work, such as insulation or replacing a heating system, is in principle useful work; to size the insulation, see the U-value calculator.
How to calculate the legal rent increase after the renovation of a rental building (Art. 14 OBLF — Rent Ordinance)
The rent increase calculation after renovation OBLF art 14 passes on to tenants only the share of the work that creates added value, not routine maintenance. It is done in four steps: net investment after subsidies, share attributable to added value, annual pass-on rate (depreciation, interest on capital and maintenance), then annual and monthly increase. The notification procedure is governed by the official rent-increase form; to compare tenancy law with the Code of Obligations, see the SIA 118 and CO comparator.
The 50% to 70% rule for the added-value share and the mandatory deduction of subsidies
For major renovation work, article 14 paragraph 1 OBLF in principle accepts that 50% to 70% of the cost creates added value; case law treats this range as a rebuttable presumption, which falls away if the added-value share can be determined precisely. An entirely new service counts for 100%. Subsidies received are deducted first: on CHF 320'000 of work and CHF 45'000 of subsidies, the net investment is CHF 275'000.
| Value-adding share | Amount that can be passed on | Annual increase | Per dwelling and per month |
|---|---|---|---|
| 50 % | 137'500 CHF | 9'109.38 CHF | 94.89 CHF |
| 60 % | 165'000 CHF | 10'931.25 CHF | 113.87 CHF |
| 70 % | 192'500 CHF | 12'753.13 CHF | 132.85 CHF |
Worked example: depreciation, Federal Housing Office (OFL) reference mortgage rate and maintenance flat rate
Added-value share of 60%: CHF 165'000. Depreciation over 25 years: 100 / 25 = 4.00% per year. Interest on capital: (reference rate 1.25% + 2.00 points) / 2 = 1.625%, calculated on half of the investment. Additional maintenance and administration: 1.0%. Total annual rate: 6.625%, i.e. CHF 10'931.25 of annual increase for the building and CHF 113.87 per flat per month for 8 flats.
Note on the values. The rate for passing on added value of work to Swiss rents is based on the return on the capital invested: the reference mortgage rate plus a percentage. The old case law used 0.5 points; under a recent Federal Supreme Court decision (ATF 151 III 16, according to a published commentary), the increase is 2 points when the reference rate is 2% or less. The tool uses 2 points and also shows the result with 0.5 points: the calculation in the specifications (reference rate of 1.75% and 0.5 points) would give CHF 10'106.25 per year, i.e. CHF 105.27 per flat per month. The starting reference rate of 1.25% is the latest level found: confirm it on the Federal Housing Office website, as well as the maintenance flat rate of 1.0%, a value from the specifications.
Optimal funding of the renovation fund of a condominium (PPE) in Switzerland (0.2% to 0.5% of the insured value)
The condominium PPE renovation fund use serves to finance major maintenance and renewal work on the common parts without an exceptional call for funds: roof, façade, lift, heating. The usual recommendation is to pay into it each year 0.2% to 0.5% of the building's insured value; the condominium (PPE) regulations and the meeting set the actual amount. Using the fund for necessary work avoids resorting to extraordinary contributions from the co-owners.
| Insurance value of the building | At 0,2 % | At 0,35 % | At 0,5 % |
|---|---|---|---|
| 3'000'000 CHF | 6'000 CHF per year | 10'500 CHF per year | 15'000 CHF per year |
| 5'000'000 CHF | 10'000 CHF per year | 17'500 CHF per year | 25'000 CHF per year |
| 10'000'000 CHF | 20'000 CHF per year | 35'000 CHF per year | 50'000 CHF per year |
The range of 0.2% to 0.5% is a practical recommendation taken from the specifications, not a legal rule. An old building with major work coming up justifies the top of the range.
Frequently Asked Questions about Condominium (PPE) Renovation and Rent Increases (FAQ)
1. What majority is needed to vote on work at a condominium (PPE) meeting?
The Civil Code distinguishes three categories, applicable to condominium ownership through article 712g para. 1. Necessary maintenance, repair and renewal work (art. 647c) is decided by the majority of all co-owners, or by that of those present if the condominium (PPE) regulations so provide. Useful work, which increases value or yield, including energy savings (art. 647d), requires the majority of all co-owners also representing more than 500 thousandths. Luxury work, purely aesthetic (art. 647e), requires unanimity in principle.
The classification of a piece of work is often disputed: a lift or an improvement may be judged useful or luxury, and case law allows some tempering of unanimity. Have the classification and the majority checked by a lawyer before the vote.
2. How to calculate the admissible rent increase after a renovation (art. 14 OBLF — Rent Ordinance)?
For major work, 50 to 70% of the cost is in principle presumed to create added value that can be passed on to the rent, after deduction of subsidies. On CHF 320'000 of work and CHF 45'000 of subsidies, the net investment is CHF 275'000 and the added-value share of 60% is CHF 165'000. The pass-on rate adds depreciation (100 / 25 years = 4.00%), average interest on capital (1.625%) and maintenance (1.0%), i.e. 6.625%: CHF 10'931.25 per year for the building, CHF 113.87 per flat per month for 8 flats.
The calculation in the specifications (reference rate of 1.75% and increase of 0.5 points) would give CHF 10'106.25 per year, i.e. CHF 105.27 per flat per month.
3. Which reference rate and which increase should be used for the return on the capital invested?
The return on the capital invested corresponds to the reference mortgage rate plus a percentage. Under the old case law the increase was 0.5 points; under a recent Federal Supreme Court decision (ATF 151 III 16, according to a published commentary) it is 2 points when the reference rate is 2% or less: the tool uses 2 points by default and also shows the result with 0.5 points. The starting reference rate, 1.25%, is the latest level found (March 2026), whereas the specifications proposed 1.75%.
Check the reference rate currently in force on the Federal Housing Office website, and the applicable case law, before notifying an increase. Only the official rent-increase form and the decision of the conciliation authority are authoritative.
Indicative information prepared from the Civil Code (art. 647c to 647e and 712g) and article 14 OBLF; it replaces neither a lawyer's opinion nor the decision of the conciliation authority.
