Building permit · Public notice of the application Tool 5.11 Online

Interactive Assistant: Do You Need a Building Permit or a Public Notice of the Application? (By Canton)

Answer in three clicks: building permit, public notice of the application or exemption, depending on your canton.

Interactive tool

A Your project in three choices

2 Building situation

Applicable procedure

Rule for this work
Official cantonal portal
Cantonal law
Processing time
De minimis threshold

Documents to provide

      Rules from the tool's specifications, supplemented by the verified texts (art. 18a LAT, art. 32a OAT, art. 68c RLATC, ReLATeC). The thresholds of cantons other than Fribourg and the processing times are not verified: the municipality and the cantonal office are authoritative.

      Embed this calculator on a website page

      Paste this code into the page, or write [outil code="5.11"] in the content of a page on the site.

      📄 Files and templates linked to this tool (free)

      Move from calculation to full management

      Keep your references at hand, then automate them in your quotes, bids and final statements.

      ⚡ Automate this calculation in our ERP / Soumission software (Trial)

      Technical reference guide

      What work can be carried out without a building permit in French-speaking Switzerland (Vaud, Geneva, Valais, Fribourg)?

      The work without a building permit Vaud Valais Geneva exists, but the list depends on cantonal law and municipal regulations. The federal principle is simple: any construction or alteration of a building beyond maintenance requires a permit (art. 22 LAT), and outside the building zone a special cantonal authorisation (art. 24 LAT). In between, each canton sets exemptions and simplified procedures. The table reproduces the 10 cases of the assistant, with the rules of the canton of Vaud for the building zone.

      Procedure according to the work and the situation of the building (example: canton of Vaud)
      WorksOrdinary building zoneProtected buildingOutside the building zone
      Well-integrated rooftop photovoltaic solar panelsSimple notificationPublic notice 30 daysSimple notification
      Replacing an oil/gas boiler with an indoor or outdoor heat pump (PAC)Exemption from municipal public notice / accelerated APAPublic notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      Interior renovation (kitchen, bathroom, floors, painting) without touching load-bearing walls or the use of the buildingExemption from authorisationPublic notice 30 daysExemption from authorisation
      Opening or removal of an interior load-bearing wallExemption from municipal public notice / accelerated APAPublic notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      Façade or roof repair like-for-like (same colour and same materials)Exemption from municipal public notice / accelerated APAPublic notice 30 daysExemption from municipal public notice / accelerated APA
      Change of colour, external insulation (ITE) or creation of a window / VeluxPublic notice 30 daysPublic notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      Garden shedExemption from authorisation up to 8 m², public notice 30 days beyond that (Vaud)Public notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      Uncovered pergolaExemption from authorisation up to 12 m², public notice 30 days beyond that (Vaud)Public notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      CarportExemption from authorisation up to 8 m², public notice 30 days beyond that (Vaud)Public notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)
      In-ground swimming poolPublic notice 30 daysPublic notice 30 daysSpecial cantonal authorisation (Art. 24 LAT)

      Note on the text of the standard. The results come from the tool's specifications, supplemented by the verified texts: art. 18a LAT and art. 32a OAT (solar), art. 68c RLATC (heat pumps in Vaud), ReLATeC (Fribourg). The de minimis thresholds of the other cantons (8 m² used as a precaution) and the processing times are not verified: the municipality is authoritative.

      The federal rule on solar panels without a permit (Art. 18a LAT) and its heritage exceptions (ISOS)

      The photovoltaic solar notification without permit art 18a LAT is the federal rule: solar installations sufficiently adapted to roofs do not need a building permit, but they must be notified to the competent authority before they are carried out (art. 18a para. 1 LAT; the adaptation conditions are set in art. 32a OAT). The exception concerns cultural property of cantonal or national importance, such as an ISOS site of national importance: a building permit is then always required (art. 18a para. 3 LAT, list in art. 32b OAT). Some cantons extend this list, for example to all protected buildings.

      In the assistant, the result for a protected building is therefore "Public notice 30 days", and for a roof in the building zone "Simple notification". A notification is not an optional formality: without it, the installation may be ordered to be restored to its previous condition.

      Interior renovation, window replacement and heat pump: simple notification or public notice?

      Interior renovation (kitchen, bathroom, floors, painting) without touching load-bearing walls or the use of the building counts as ordinary maintenance: "Exemption from authorisation", outside a listed building. Opening or removing a load-bearing wall, on the other hand, requires an authorisation, generally under the simplified procedure, with a civil engineer's certificate; in a seismic zone, see the SIA 261 and 269/8 seismic zone checker. Changing the colour, fitting external insulation, creating a window or a Velux changes the appearance of the building: the tool applies public notice, but several cantons allow an exemption from public notice depending on the scale.

      For the heat pump replacement simplified procedure, the specifications indicate a simplified procedure or a notification, provided the Cercle Bruit of the OPB (Noise Abatement Ordinance) is complied with; in Vaud, an air/water or air/air heat pump in an existing building is exempt from authorisation with notification to the municipality and a noise certificate (art. 68c RLATC). Public notice becomes necessary in the case of geothermal drilling (prohibited in water protection zones: see the radon, water and natural hazard constraints checker) or of exceeding noise limits (see the heat pump noise calculator).

      Comparison of cantonal procedures: CAMAC (Vaud), APA (Geneva), FRIAC (Fribourg) and eConstruction (Valais)

      Each canton has its own portal and its own law. For the public notice renovation CAMAC APA, the table shows the official portal used by the specifications and the points verified for each canton.

      Portal and law by canton
      CantonLawOfficial portalKnown points
      Vaud (LATC / RLATC — CAMAC portal)LATC / RLATCCAMACVaud: an air/water or air/air heat pump in an existing building is exempt from authorisation with notification to the municipality and a certificate of compliance with noise requirements (art. 68c RLATC). The items of art. 68a RLATC (e.g. uncovered pergolas up to 12 m²) must be notified to the municipality.
      Geneva (LCI — APA / DD procedure)LCISAD (authorisation under the accelerated procedure APA or definitive application DD)Geneva: constructions of very minor importance are not subject to authorisation in the building zone (art. 1 paras. 3 and 4 LCI), but a garden shed is in principle subject to authorisation; the APA (art. 3 LCI) may apply to work of lesser importance.
      Valais (LC / OC — municipal eConstruction or CCC)LC / OCeConstruction (municipality) or CCC (cantonal construction commission)Valais: small ancillary buildings in the building zone are generally not subject to authorisation, subject to the municipal regulations (OC art. 16 to 20); the exact threshold depends on the municipality.
      Fribourg (LATeC / ReLATeC — FRIAC)LATeC / ReLATeCFRIACFribourg: every application goes through FRIAC; the simplified procedure is defined in art. 85 ReLATeC; outbuildings up to 6 m² and 2.50 m in height and pergolas up to 12 m² are exempt (cantonal document amending the ReLATeC, to be confirmed in the text in force).
      Neuchâtel (LConstr — SATAC)LConstrSATACNeuchâtel: procedure through the SATAC portal (indicated by the specifications); no exemption rule has been verified.
      Jura / BernCantonal construction lawCantonal portal or municipal counter (to be confirmed with the municipality)Jura and Bern: no rule is provided by the specifications; ask the municipality and the cantonal office.

      The CAMAC, APA / SAD, eConstruction and SATAC portals are those of the specifications; FRIAC is confirmed by the canton of Fribourg. Only the points in the right-hand column have been checked in cantonal documents or municipal brochures, not in the consolidated texts: check the law in force.

      30-day public notice period, handling neighbours' objections and early start of work

      The objection period building permit 30 days Switzerland is that of the public notice: for 30 days, i.e. 4.3 weeks, the file can be consulted and the neighbours, the entitled organisations and third parties affected by the project may object in writing to the municipality. The permit is issued only after the objections have been examined, possibly after a conciliation hearing. The total length of the procedure is not set uniformly: the tool does not invent it and indicates the statutory public notice period, as well as the 30-day period for examining an application for work subject to notification in Lausanne (fixed fee of CHF 150 since 1 November 2025).

      To handle objections, explain the project to the neighbours before filing, take care over the plans (building envelope, distances to boundaries, cast shadows) and allow for appeal periods in the schedule. Some cantons provide for an authorisation for early start of work, to be requested in writing and under the client's responsibility: without it, do not begin anything before the permit, at the risk of restoration and a fine. To cost the work before filing, see the Soumission costing offer.

      Frequently Asked Questions about the Building Permit, Exemption from Public Notice and Cantonal Procedures (FAQ)

      1. What work can be carried out without a building permit in Switzerland?

      In the building zone, certain work does not require a permit. Solar installations sufficiently adapted to roofs require only a notification (art. 18a LAT and art. 32a OAT), except on cultural property of cantonal or national importance. Interior maintenance (kitchen, bathroom, floors, painting) without touching load-bearing walls or the use of the building is exempt from authorisation, and like-for-like façade or roof repair generally is too, depending on the canton. Small constructions are exempt below a de minimis threshold: the tool uses 8 m² for a shed in Vaud (a cautious value from the specifications, to be confirmed), 6 m² in Fribourg and 12 m² for an uncovered pergola in Fribourg and Vaud.

      A listed building, an ISOS site or land outside the building zone changes the answer: public notice or the special cantonal authorisation (art. 24 LAT) becomes the rule. The thresholds of the other cantons have not been verified: ask the municipality before starting.

      2. What is the public notice period for a building permit?

      Public notice lasts 30 days in the tool's specifications, i.e. 4.3 weeks. During this period, neighbours and third parties may object. The permit is then issued only after the objections have been examined: the total length of the procedure is not set uniformly and depends on the municipality, the canton and the complexity of the file. As a verified example, the City of Lausanne examines an application for work subject to notification within 30 days, with a fixed fee of CHF 150 since 1 November 2025.

      Do not start work before you have the permit: some cantons provide for an authorisation for early start of work, to be requested in writing and under the client's responsibility. The 30-day period is that of the specifications, to be confirmed in cantonal law.

      3. What procedure should be followed to replace a heating system with a heat pump?

      In Vaud, an air/water or air/air heat pump in an existing building is exempt from authorisation with a notification to the municipality and a certificate of compliance with noise-protection requirements (art. 68c RLATC): the tool gives "Exemption from municipal public notice / accelerated APA" for a heat pump in the building zone. In the other cantons, the specifications indicate a simplified procedure or a notification depending on the canton, provided the Cercle Bruit (OPB) is complied with. Geothermal drilling or exceeding the noise limit requires public notice ("Public notice 30 days").

      Drilling is prohibited in the S1 to S3 water protection zones of several cantons (see tool 5.12) and the sound level is calculated with tool 5.6. The exact procedure of each canton is to be confirmed with the municipality.

      Indicative information prepared from the LAT, the OAT and the cantonal building laws; it replaces neither the municipality's advice nor that of the cantonal office.